{"id":74624,"date":"2024-06-28T11:33:38","date_gmt":"2024-06-28T01:33:38","guid":{"rendered":"https:\/\/infrastructuremagazine.com.au\/?p=52694"},"modified":"2024-06-28T11:33:38","modified_gmt":"2024-06-28T01:33:38","slug":"melbourne-airport-rail-is-viable-and-necessary","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=74624","title":{"rendered":"Melbourne Airport rail is \u201cviable and necessary\u201d"},"content":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/infrastructuremagazine.com.au\/wp-content\/uploads\/2024\/06\/shutterstock_1271841322-672x448.jpg\" alt=\"\" style=\"float:right; margin:0 0 10px 10px;\"><figcaption><\/figcaption><\/figure>\n<p>A review into the proposed Melbourne Airport Rail Link has found that the project is \u201cviable and necessary\u201d, and importantly, has recommended that the airport train station be located above ground.\u00a0<br \/>\nThe<br \/><a class=\"more-link pcm-read-more-link-custom\" href=\"https:\/\/infrastructuremagazine.com.au\/2024\/06\/28\/melbourne-airport-rail-is-viable-and-necessary\/\">Read More<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/infrastructuremagazine.com.au\/wp-content\/uploads\/2024\/06\/shutterstock_1271841322-672x448.jpg\" alt=\"\"><figcaption><\/figcaption><\/figure>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[1054,343,471,8214,1291,1433,8203,5,8205],"tags":[],"class_list":["post-74624","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-airport","category-infrastructure","category-news","category-planning","category-projects","category-rail","category-spotlight","category-transport","category-vic"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/74624","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=74624"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/74624\/revisions"}],"predecessor-version":[{"id":74625,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/74624\/revisions\/74625"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=74624"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=74624"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=74624"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}