{"id":68417,"date":"2024-06-19T09:45:17","date_gmt":"2024-06-18T23:45:17","guid":{"rendered":"https:\/\/www.railexpress.com.au\/?p=116624"},"modified":"2024-06-19T09:45:17","modified_gmt":"2024-06-18T23:45:17","slug":"final-beaconsfield-parade-bridge-precinct-design-released","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=68417","title":{"rendered":"Final Beaconsfield Parade bridge precinct design released"},"content":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/06\/Glenrowan-bridge-visualisation-2024-number-00001.jpg\" alt=\"\" style=\"float:right; margin:0 0 10px 10px;\"><figcaption>Image\/Inland Rail<\/figcaption><\/figure>\n<p><strong><a href=\"https:\/\/inlandrail.com.au\/\">Inland Rail<\/a> has released drawings of the Beaconsfield Parade precinct design will look like, including improved pedestrian and vehicle connections.<\/strong><span id=\"more-116624\"><\/span><\/p>\n<p>The new visualisations provide an illustration of the improvements that are being incorporated into the Inland Rail works.<\/p>\n<p>During engagement with the community we heard heritage, safety, accessibility and connectivity were important and this feedback is reflected in the final precinct design.<\/p>\n<figure id=\"attachment_116626\" aria-describedby=\"caption-attachment-116626\" style=\"width: 300px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/06\/Glenrowan-bridge-visualisation-2024-number-00013.jpg\"><img fetchpriority=\"high\" decoding=\"async\" class=\"size-medium wp-image-116626\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/06\/Glenrowan-bridge-visualisation-2024-number-00013-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/06\/Glenrowan-bridge-visualisation-2024-number-00013-300x169.jpg 300w, https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/06\/Glenrowan-bridge-visualisation-2024-number-00013-768x432.jpg 768w, https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/06\/Glenrowan-bridge-visualisation-2024-number-00013.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-116626\" class=\"wp-caption-text\">Image\/Inland Rail<\/figcaption><\/figure>\n<p>In the coming months, the following new features will be opened:<\/p>\n<ul>\n<li>a network of walking paths improving access between key heritage sites and Gladstone Street<\/li>\n<li>better accessibility, visibility and connectedness across the precinct<\/li>\n<li>an upgraded pathway along Beaconsfield Parade, adjacent to Ann Jones Inn site, benefitting school children, residents and tourists<\/li>\n<li>new bus and vehicle parking areas.<\/li>\n<\/ul>\n<p>The new Beaconsfield Parade bridge and separated shared user path opened in early March 2024 and is already providing improved safer access.<\/p>\n<p>Glenrowan resident Darren Roberts said: \u201cIt\u2019s so much better than what we had. It\u2019s smoother and there\u2019s plenty of space for me to ride my scooter safely across.\u201d<\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/final-beaconsfield-parade-bridge-precinct-design-released\/\">Final Beaconsfield Parade bridge precinct design released<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/06\/Glenrowan-bridge-visualisation-2024-number-00001.jpg\" alt=\"\"><figcaption>Image\/Inland Rail<\/figcaption><\/figure>\n<p>Inland Rail has released drawings of the Beaconsfield Parade precinct design will look like, including improved pedestrian and vehicle connections. \u2026 <\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/final-beaconsfield-parade-bridge-precinct-design-released\/\">Final Beaconsfield Parade bridge precinct design released<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[170,165,326,4353,2251,163,58],"tags":[10376],"class_list":["post-68417","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-freight-rail","category-industry-infrastructure","category-inland-rail","category-major-projects-infrastructure","category-nsw","category-rail-industry-news-australia-new-zealand","category-track-construction","tag-rail-express"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/68417","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=68417"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/68417\/revisions"}],"predecessor-version":[{"id":69190,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/68417\/revisions\/69190"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=68417"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=68417"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=68417"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}