{"id":64181,"date":"2024-06-12T13:26:04","date_gmt":"2024-06-12T03:26:04","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=64181"},"modified":"2024-06-12T13:26:11","modified_gmt":"2024-06-12T03:26:11","slug":"inland-rail-sees-strong-progress-at-first-victorian-sites","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=64181","title":{"rendered":"INLAND RAIL SEES STRONG PROGRESS AT FIRST VICTORIAN SITES"},"content":{"rendered":"\n<p>THE FIRST four Victorian sites on the Inland Rail project are nearing completion, according to a project update.<\/p>\n\n\n\n<p>The Inland Rail company has reported strong progress at the Wangaratta, Glenrowan and Seymour sites, with the Barnawartha North site having been completed.<\/p>\n\n\n\n<p>The company is scheduled to appoint a construction partner for the remaining eight Victorian sites sometime this month, with construction to commence early 2025.<\/p>\n\n\n\n<p>Ed Walker, the Inland Rail program delivery director for Beveridge to Albury, recently spoke on the project\u2019s progress at the Victorian Transport Infrastructure Conference.<\/p>\n\n\n\n<p>\u201cThere are always challenges on projects of this size, but the project is progressing well in Victoria. We have the complexity of working around an active train line so scheduling large, detailed work programs around two or three track closures per-year is critically important,\u201d he said.<\/p>\n\n\n\n<p>\u201cWith much of the work taking place in regional towns that have not faced construction sites of this size before, it is essential to bring the bring the community on the journey with us.\u201d<\/p>\n\n\n\n<p>\u201cWe thank the local communities for their patience and understanding.\u201d<\/p>\n\n\n\n<p>The 1600-kilometre Inland Rail project intends to provide a faster, more efficient, and more cost-effective method of moving freight between Brisbane and Melbourne.<\/p>\n\n\n\n<p>According to the Australian Government, 70% of the project will involve upgrading existing infrastructure.<\/p>\n\n\n\n<p>While various dates have been mentioned for completion of the Inland Rail project, Inland Rail hopes to complete all sections south of Parkes, New South Wales in 2027. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>THE FIRST four Victorian sites on the Inland Rail project are nearing completion, according to a project update.<\/p>\n","protected":false},"author":20,"featured_media":64182,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[273,326,163],"tags":[9998,10319,10320,10317,10318,8,10321,10316],"class_list":["post-64181","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-australia","category-inland-rail","category-rail-industry-news-australia-new-zealand","tag-albury","tag-barnawartha","tag-beveridge","tag-glenrowan","tag-seymour","tag-victoria","tag-victorian-transport-infrastructure-conference","tag-wangaratta"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/64181","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=64181"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/64181\/revisions"}],"predecessor-version":[{"id":64183,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/64181\/revisions\/64183"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/media\/64182"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=64181"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=64181"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=64181"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}