{"id":61512,"date":"2024-06-07T17:57:11","date_gmt":"2024-06-07T07:57:11","guid":{"rendered":"https:\/\/www.railfreight.com\/?p=53177"},"modified":"2024-06-07T17:57:11","modified_gmt":"2024-06-07T07:57:11","slug":"less-than-a-month-until-the-launch-of-the-madrid-valencia-rolling-highway","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=61512","title":{"rendered":"Less than a month until the launch of the Madrid-Valencia rolling highway"},"content":{"rendered":"<p><strong>The Madrid &#8211; Valencia rolling highway service will start operations at the beginning of July. Moreover, the port of Valencia wants to extend the service into Portugal.<\/strong><br \/>\n<span id=\"more-53177\"><\/span>The deployment of the rolling highway between Valencia and Madrid was announced in the <a href=\"https:\/\/www.railfreight.com\/intermodal\/2023\/07\/10\/valencia-madrid-rolling-highway-to-be-operational-in-2024\/\"  rel=\"noopener\">summer of 2023<\/a>. Testing operations started at the <a href=\"https:\/\/www.railfreight.com\/intermodal\/2024\/06\/03\/valencia-madrid-rolling-highway-enters-test-phase\/\"  rel=\"noopener\">beginning of June<\/a>. An official start of operation was expected for the <a href=\"https:\/\/www.railfreight.com\/intermodal\/2024\/06\/03\/valencia-madrid-rolling-highway-enters-test-phase\/\"  rel=\"noopener\">beginning of this year<\/a>, but that has been delayed to the beginning of July. The project\u2019s main goal will be to transfer semi-trailers, including non-cranable, from the road to the rail.<\/p>\n<p>For example, the focus will be on cargo that reaches the port of Valencia from Italy by sea and usually continues its journey through Spain by trucks. The service will begin with a daily connection with a capacity of 40 semi-trailers. That way, it could take over ten thousand trucks off the road on an annual basis.<\/p>\n<h2>Extension into Portugal<\/h2>\n<p>The port of Valencia has expressed interest in extending the rolling highway into Portugal. Companies Transitalia and Tramesa, both partners of the initiative, have expressed interest in new railway services, giving the Valencian port confidence in such an expansion. With a connection to Madrid already in place, the extension linking the Atlantic Ocean and the Mediterranean Sea is planned for 2025.<\/p>\n<p>However, this timeline remains uncertain. While gauge problems between Madrid and Valencia have been resolved, a tough section on the way to Portugal remains. Between the towns of Manzanares and Badajoz, a section with two tunnels and fifteen overpasses still needs to be adapted.<\/p>\n<p><strong>Also read:<\/strong><\/p>\n<ul>\n<li><a href=\"https:\/\/www.railfreight.com\/infrastructure\/2024\/03\/21\/spain-allocates-468-millions-for-the-algeciras-zaragoza-rolling-highway\/\">Spain allocates 468 million for the Algeciras-Zaragoza rolling highway<\/a><\/li>\n<li><a href=\"https:\/\/www.railfreight.com\/railfreight\/2023\/08\/31\/port-of-valencia-volumes-may-have-dropped-by-rail-freight-is-on-the-rise\/\">Port of Valencia: volumes may have dropped by rail freight is on the rise<\/a><\/li>\n<li><a href=\"https:\/\/www.railfreight.com\/intermodal\/2024\/05\/28\/medway-to-operate-three-new-terminals-in-spain-by-2025\/\">Medway to operate three new terminals in Spain by 2025<\/a><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The Madrid \u2013 Valencia rolling highway service will start operations at the beginning of July. Moreover, the port of Valencia wants to extend the service into Portugal. The deployment of the rolling highway between Valencia and Madrid was announced in the summer of 2023. Testing operations started at the beginning of June. An official start\u2026<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[65,4586,1672,307,6662,1024,9969,9970,7533],"tags":[],"class_list":["post-61512","post","type-post","status-publish","format-standard","hentry","category-intermodal","category-madrid","category-port-of-valencia","category-portugal","category-rolling-highway","category-spain","category-tramesa","category-transitalia","category-valencia"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"The Madrid \u2013 Valencia rolling highway service will start operations at the beginning of July. Moreover, the port of Valencia wants to extend the service into Portugal. The deployment of the rolling highway between Valencia and Madrid was announced in the summer of 2023. Testing operations started at the beginning of June. An official start\u2026\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=61512\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Less than a month until the launch of the Madrid-Valencia rolling highway - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"The Madrid \u2013 Valencia rolling highway service will start operations at the beginning of July. Moreover, the port of Valencia wants to extend the service into Portugal. The deployment of the rolling highway between Valencia and Madrid was announced in the summer of 2023. Testing operations started at the beginning of June. An official start\u2026\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=61512\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-06-07T07:57:11+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-06-07T07:57:11+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Less than a month until the launch of the Madrid-Valencia rolling highway - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The Madrid \u2013 Valencia rolling highway service will start operations at the beginning of July. Moreover, the port of Valencia wants to extend the service into Portugal. The deployment of the rolling highway between Valencia and Madrid was announced in the summer of 2023. Testing operations started at the beginning of June. An official start\u2026\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=61512#blogposting\",\"name\":\"Less than a month until the launch of the Madrid-Valencia rolling highway - VibeWire Magazine\",\"headline\":\"Less than a month until the launch of the Madrid-Valencia rolling highway\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#articleImage\",\"width\":1028,\"height\":930},\"datePublished\":\"2024-06-07T17:57:11+10:00\",\"dateModified\":\"2024-06-07T17:57:11+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=61512#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=61512#webpage\"},\"articleSection\":\"Intermodal, Madrid, Port of Valencia, Portugal, Rolling highway, Spain, Tramesa, TransItalia, Valencia\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=61512#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=65#listItem\",\"name\":\"Intermodal\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=65#listItem\",\"position\":2,\"name\":\"Intermodal\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=65\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=61512#listItem\",\"name\":\"Less than a month until the launch of the Madrid-Valencia rolling highway\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=61512#listItem\",\"position\":3,\"name\":\"Less than a month until the launch of the Madrid-Valencia rolling highway\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=65#listItem\",\"name\":\"Intermodal\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=61512\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=61512\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=61512#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=61512#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=61512\",\"name\":\"Less than a month until the launch of the Madrid-Valencia rolling highway - VibeWire Magazine\",\"description\":\"The Madrid \\u2013 Valencia rolling highway service will start operations at the beginning of July. Moreover, the port of Valencia wants to extend the service into Portugal. The deployment of the rolling highway between Valencia and Madrid was announced in the summer of 2023. Testing operations started at the beginning of June. An official start\\u2026\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=61512#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"datePublished\":\"2024-06-07T17:57:11+10:00\",\"dateModified\":\"2024-06-07T17:57:11+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Less than a month until the launch of the Madrid-Valencia rolling highway - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Less than a month until the launch of the Madrid-Valencia rolling highway - VibeWire Magazine","description":"The Madrid \u2013 Valencia rolling highway service will start operations at the beginning of July. Moreover, the port of Valencia wants to extend the service into Portugal. The deployment of the rolling highway between Valencia and Madrid was announced in the summer of 2023. Testing operations started at the beginning of June. An official start\u2026","canonical_url":"https:\/\/www.vibewire.com.au\/?p=61512","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=61512#blogposting","name":"Less than a month until the launch of the Madrid-Valencia rolling highway - VibeWire Magazine","headline":"Less than a month until the launch of the Madrid-Valencia rolling highway","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/#articleImage","width":1028,"height":930},"datePublished":"2024-06-07T17:57:11+10:00","dateModified":"2024-06-07T17:57:11+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=61512#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=61512#webpage"},"articleSection":"Intermodal, Madrid, Port of Valencia, Portugal, Rolling highway, Spain, Tramesa, TransItalia, Valencia"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=61512#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=65#listItem","name":"Intermodal"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=65#listItem","position":2,"name":"Intermodal","item":"https:\/\/www.vibewire.com.au\/?cat=65","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=61512#listItem","name":"Less than a month until the launch of the Madrid-Valencia rolling highway"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=61512#listItem","position":3,"name":"Less than a month until the launch of the Madrid-Valencia rolling highway","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=65#listItem","name":"Intermodal"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=61512\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=61512\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=61512#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=61512#webpage","url":"https:\/\/www.vibewire.com.au\/?p=61512","name":"Less than a month until the launch of the Madrid-Valencia rolling highway - VibeWire Magazine","description":"The Madrid \u2013 Valencia rolling highway service will start operations at the beginning of July. Moreover, the port of Valencia wants to extend the service into Portugal. The deployment of the rolling highway between Valencia and Madrid was announced in the summer of 2023. Testing operations started at the beginning of June. An official start\u2026","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=61512#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"datePublished":"2024-06-07T17:57:11+10:00","dateModified":"2024-06-07T17:57:11+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Less than a month until the launch of the Madrid-Valencia rolling highway - VibeWire Magazine","og:description":"The Madrid \u2013 Valencia rolling highway service will start operations at the beginning of July. Moreover, the port of Valencia wants to extend the service into Portugal. The deployment of the rolling highway between Valencia and Madrid was announced in the summer of 2023. Testing operations started at the beginning of June. An official start\u2026","og:url":"https:\/\/www.vibewire.com.au\/?p=61512","article:published_time":"2024-06-07T07:57:11+00:00","article:modified_time":"2024-06-07T07:57:11+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Less than a month until the launch of the Madrid-Valencia rolling highway - VibeWire Magazine","twitter:description":"The Madrid \u2013 Valencia rolling highway service will start operations at the beginning of July. Moreover, the port of Valencia wants to extend the service into Portugal. The deployment of the rolling highway between Valencia and Madrid was announced in the summer of 2023. Testing operations started at the beginning of June. An official start\u2026","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"61512","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2025-08-23 00:09:39","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-06-07 08:03:43","updated":"2025-08-23 00:09:39"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=65\" title=\"Intermodal\">Intermodal<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tLess than a month until the launch of the Madrid-Valencia rolling highway\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Intermodal","link":"https:\/\/www.vibewire.com.au\/?cat=65"},{"label":"Less than a month until the launch of the Madrid-Valencia rolling highway","link":"https:\/\/www.vibewire.com.au\/?p=61512"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/61512","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=61512"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/61512\/revisions"}],"predecessor-version":[{"id":61513,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/61512\/revisions\/61513"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=61512"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=61512"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=61512"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}