{"id":610693,"date":"2026-11-24T21:44:44","date_gmt":"2026-11-24T10:44:44","guid":{"rendered":"https:\/\/railuk.com\/?p=206331"},"modified":"2026-11-24T21:44:44","modified_gmt":"2026-11-24T10:44:44","slug":"hs2-tunnel-boring-machines-reach-halfway-on-journey-to-euston","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=610693","title":{"rendered":"HS2 tunnel boring machines reach halfway on journey to Euston"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Building work on HS2\u2019s Euston tunnel passed the halfway mark this week as two giant tunnel boring machines (TBMs) edged their way towards the high-speed railway\u2019s ultimate London terminus.<\/p>\n<p class=\"wp-block-paragraph\">Delivering the railway to a new HS2 station at Euston will enable the high-speed line to carry fast intercity services that previously used the West Coast Mainline. The capacity released on the southern section of the existing route will unlock opportunities for new services for towns and cities between London and Birmingham, as well as boosting the economic potential around intermediate stations.<\/p>\n<p class=\"wp-block-paragraph\">Launched in January and March 2026 from HS2\u2019s future super hub at Old Oak Common, the two 1,624-tonne TBMs \u2013 Karen and Madeleine \u2013 have since been working towards Euston at a rate of 16 metres per day. By 17 November both were in the area between West Hamstead and Kilburn High Road stations.<\/p>\n<p class=\"wp-block-paragraph\">Operated by Skanska Costain STRABAG joint venture (SCS JV) &#8211; HS2 Ltd\u2019s London tunnels contractor\u2013 both machines work 24\/7 to tunnel the 4.5miles into central London.<\/p>\n<p class=\"wp-block-paragraph\">The programme is expected to generate 1.5million tonnes of excavated material. As well as tunnelling, the TBMs will line the tunnel with 48,294 concrete ring segments which are being made in Hartlepool in the North East of England.<\/p>\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/11\/24104404\/Euston-TBM-Infographic-2.jpg\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/11\/24104404\/Euston-TBM-Infographic-2-1024x576.jpg\" alt=\"\" class=\"wp-image-206333\" \/><\/a><\/figure>\n<p class=\"wp-block-paragraph\">HS2 Chief Executive Mark Wild said: \u201cReaching the halfway mark for building the programme\u2019s last deep bored tunnel is a magnificent achievement by everyone involved. Their work driving the high speed line into central London is fundamental to the long term ambition of increasing the prosperity of the area around Euston. I wish everyone a safe journey to their final destination.<\/p>\n<p class=\"wp-block-paragraph\">\u201cHS2 Ltd is now in the last phases of a root and branch full-programme reset that will safely deliver the railway at lowest reasonable cost.&nbsp; The new line we\u2019re driving to Euston will complement the existing station and the West Coast Mainline, providing fast and reliable long distance journeys with its new capacity.\u201d<\/p>\n<p class=\"wp-block-paragraph\">Eddie Edmonds, Skanska Costain STRABAG delivery lead, commented: \u201cIt\u2019s a fantastic technical achievement to be 50% of the way through construction of HS2\u2019s final running tunnels. Months of meticulous planning and preparation have brought us to this point and into the final leg of the journey.<\/p>\n<p class=\"wp-block-paragraph\">\u201cThis progress is down to that preparation and the skill, expertise and diligence of the teams working not only on the tunnel boring machines, but also those supporting the operation and carrying out the many other tasks essential to its success. The fact that this complex operation is taking place up to 50 metres beneath the London makes it an even greater achievement.\u201d<\/p>\n<p class=\"wp-block-paragraph\">The TBMs will complete their journeys in 2027, finishing underground on the approach to Euston. Once stopped, key elements of the machine will be pulled back through the tunnel. The cutterhead, spanning 8.53-metres will be excavated from the Euston Cavern and removed. The outer part of the front of the machine, known as the shield or \u2018can\u2019, will remain underground and will be grouted in behind the concrete tunnel lining.<\/p>\n<p class=\"wp-block-paragraph\">The area around the station at Euston is one of London\u2019s biggest development opportunities. Harnessing its potential will be led by a new Euston Delivery Company, which will lead delivery of an affordable and integrated transport hub &#8211; including the new HS2 station, the redevelopment of the existing station, and upgrades to the London Underground station &#8211; along with commercial development across the Euston campus.<\/p>\n<p class=\"wp-block-paragraph\">Image credit: HS2<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Building work on HS2\u2019s Euston tunnel passed the halfway mark this week as two giant tunnel boring machines (TBMs) edged their way towards the high-speed railway\u2019s ultimate London terminus. Delivering the railway to a new HS2 station at Euston will enable the high-speed line to carry fast intercity services that previously used the West Coast [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[1089,16017,343,47,16148,16031,85],"tags":[],"class_list":["post-610693","post","type-post","status-publish","format-standard","hentry","category-hs2","category-industry-news","category-infrastructure","category-rail-news","category-rail-projects","category-structures","category-uk"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Building work on HS2\u2019s Euston tunnel passed the halfway mark this week as two giant tunnel boring machines (TBMs) edged their way towards the high-speed railway\u2019s ultimate London terminus. Delivering the railway to a new HS2 station at Euston will enable the high-speed line to carry fast intercity services that previously used the West Coast [\u2026]\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=610693\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"HS2 tunnel boring machines reach halfway on journey to Euston - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Building work on HS2\u2019s Euston tunnel passed the halfway mark this week as two giant tunnel boring machines (TBMs) edged their way towards the high-speed railway\u2019s ultimate London terminus. Delivering the railway to a new HS2 station at Euston will enable the high-speed line to carry fast intercity services that previously used the West Coast [\u2026]\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=610693\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-11-24T10:44:44+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-11-24T10:44:44+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"HS2 tunnel boring machines reach halfway on journey to Euston - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Building work on HS2\u2019s Euston tunnel passed the halfway mark this week as two giant tunnel boring machines (TBMs) edged their way towards the high-speed railway\u2019s ultimate London terminus. Delivering the railway to a new HS2 station at Euston will enable the high-speed line to carry fast intercity services that previously used the West Coast [\u2026]\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=610693#blogposting\",\"name\":\"HS2 tunnel boring machines reach halfway on journey to Euston - VibeWire Magazine\",\"headline\":\"HS2 tunnel boring machines reach halfway on journey to Euston\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/cdn.railuk.co\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/24104404\\\/Euston-TBM-Infographic-2-1024x576.jpg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=610693\\\/#articleImage\"},\"datePublished\":\"2026-11-24T21:44:44+11:00\",\"dateModified\":\"2026-11-24T21:44:44+11:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=610693#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=610693#webpage\"},\"articleSection\":\"HS2, Industry News, Infrastructure, Rail News, Rail Projects, Structures, UK\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=610693#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=610693#listItem\",\"name\":\"HS2 tunnel boring machines reach halfway on journey to Euston\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=610693#listItem\",\"position\":3,\"name\":\"HS2 tunnel boring machines reach halfway on journey to Euston\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=610693\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=610693\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=610693#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=610693#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=610693\",\"name\":\"HS2 tunnel boring machines reach halfway on journey to Euston - VibeWire Magazine\",\"description\":\"Building work on HS2\\u2019s Euston tunnel passed the halfway mark this week as two giant tunnel boring machines (TBMs) edged their way towards the high-speed railway\\u2019s ultimate London terminus. Delivering the railway to a new HS2 station at Euston will enable the high-speed line to carry fast intercity services that previously used the West Coast [\\u2026]\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=610693#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"datePublished\":\"2026-11-24T21:44:44+11:00\",\"dateModified\":\"2026-11-24T21:44:44+11:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>HS2 tunnel boring machines reach halfway on journey to Euston - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"HS2 tunnel boring machines reach halfway on journey to Euston - VibeWire Magazine","description":"Building work on HS2\u2019s Euston tunnel passed the halfway mark this week as two giant tunnel boring machines (TBMs) edged their way towards the high-speed railway\u2019s ultimate London terminus. Delivering the railway to a new HS2 station at Euston will enable the high-speed line to carry fast intercity services that previously used the West Coast [\u2026]","canonical_url":"https:\/\/www.vibewire.com.au\/?p=610693","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=610693#blogposting","name":"HS2 tunnel boring machines reach halfway on journey to Euston - VibeWire Magazine","headline":"HS2 tunnel boring machines reach halfway on journey to Euston","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/11\/24104404\/Euston-TBM-Infographic-2-1024x576.jpg","@id":"https:\/\/www.vibewire.com.au\/?p=610693\/#articleImage"},"datePublished":"2026-11-24T21:44:44+11:00","dateModified":"2026-11-24T21:44:44+11:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=610693#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=610693#webpage"},"articleSection":"HS2, Industry News, Infrastructure, Rail News, Rail Projects, Structures, UK"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=610693#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=610693#listItem","name":"HS2 tunnel boring machines reach halfway on journey to Euston"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=610693#listItem","position":3,"name":"HS2 tunnel boring machines reach halfway on journey to Euston","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=610693\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=610693\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=610693#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=610693#webpage","url":"https:\/\/www.vibewire.com.au\/?p=610693","name":"HS2 tunnel boring machines reach halfway on journey to Euston - VibeWire Magazine","description":"Building work on HS2\u2019s Euston tunnel passed the halfway mark this week as two giant tunnel boring machines (TBMs) edged their way towards the high-speed railway\u2019s ultimate London terminus. Delivering the railway to a new HS2 station at Euston will enable the high-speed line to carry fast intercity services that previously used the West Coast [\u2026]","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=610693#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"datePublished":"2026-11-24T21:44:44+11:00","dateModified":"2026-11-24T21:44:44+11:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"HS2 tunnel boring machines reach halfway on journey to Euston - VibeWire Magazine","og:description":"Building work on HS2\u2019s Euston tunnel passed the halfway mark this week as two giant tunnel boring machines (TBMs) edged their way towards the high-speed railway\u2019s ultimate London terminus. Delivering the railway to a new HS2 station at Euston will enable the high-speed line to carry fast intercity services that previously used the West Coast [\u2026]","og:url":"https:\/\/www.vibewire.com.au\/?p=610693","article:published_time":"2026-11-24T10:44:44+00:00","article:modified_time":"2026-11-24T10:44:44+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"HS2 tunnel boring machines reach halfway on journey to Euston - VibeWire Magazine","twitter:description":"Building work on HS2\u2019s Euston tunnel passed the halfway mark this week as two giant tunnel boring machines (TBMs) edged their way towards the high-speed railway\u2019s ultimate London terminus. Delivering the railway to a new HS2 station at Euston will enable the high-speed line to carry fast intercity services that previously used the West Coast [\u2026]","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"610693","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-11-24 11:01:51","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2026-11-24 11:01:39","updated":"2026-11-24 11:01:51","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\tHS2 tunnel boring machines reach halfway on journey to Euston\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au\/"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"HS2 tunnel boring machines reach halfway on journey to Euston","link":"https:\/\/www.vibewire.com.au\/?p=610693"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/610693","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=610693"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/610693\/revisions"}],"predecessor-version":[{"id":610694,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/610693\/revisions\/610694"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=610693"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=610693"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=610693"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}