{"id":606520,"date":"2026-11-20T21:00:42","date_gmt":"2026-11-20T10:00:42","guid":{"rendered":"https:\/\/www.railfreight.com\/?p=76166"},"modified":"2026-11-20T21:00:42","modified_gmt":"2026-11-20T10:00:42","slug":"high-speed-hs2-low-speed-freight-at-euston","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=606520","title":{"rendered":"High speed HS2: low-speed freight at Euston"},"content":{"rendered":"<p><strong>Rail freight is being used to remove up to 170,000 tonnes of excavated material from Britain&#8217;s HS2 high-speed rail project construction site at Euston, avoiding more than 10,000 heavy goods vehicle (HGV) journeys around London. The operation, using GB Railfreight trains, is supporting preparations for the new HS2 station, where bulk excavation has begun to create space for the future platforms.<\/strong><br \/>\n<span id=\"more-76166\"><\/span><\/p>\n<p>Rail Minister Lord Hendy visited the site on Monday this week (16 November) to see the operation, alongside Camden Council leader James Slater. The programme uses a new loading facility beside disused Track 17 at Euston station, with excavated material transported by rail to Bedfordshire for reuse. It is designed to accommodate freight trains alongside the station&#8217;s continuing passenger services.<\/p>\n<h2>Freight operation supports Euston excavation<\/h2>\n<p>HS2&#8217;s station construction partner, the Mace Dragados joint venture (MDJV), has started bulk excavation across the station site. The work involves removing material to a depth of approximately seven metres, where the new HS2 platforms will be constructed.<\/p>\n<p>Up to 170,000 tonnes of excavated material is expected to leave the site by rail. The trains carry the material to Forders Sidings in Bedfordshire, where it will be reused in the Stewartby Brickworks development. This is a somewhat more planned reuse of materials than in the past. In the 1960s redevelopment, masonry from the Victorian station was dumped in disused docks in the east of London, including the famous \u201cEuston Arch\u201d, once a London landmark.<\/p>\n<h2>Trials pave the way for main programme<\/h2>\n<p>The main excavation programme follows trials conducted between February and September 2026, during which approximately 35,000 tonnes of material was transported by rail. These trials demonstrated that each train could carry more material than originally anticipated. They also established that freight services could operate reliably alongside passenger trains at Euston. A further 135,000 tonnes is expected to be removed during the next ten months, taking the overall quantity transported by rail to as much as 170,000 tonnes.<\/p>\n<figure class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"fluid wp-image-76169 size-full\" src=\"https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/11\/Rail-Minister-and-Leader-of-Camden-Council-waving-off-freight-train-at-Euston_cropped.jpg\" alt=\"Rail Minister and Leader of Camden Council waving off freight train at Euston (HS2 image)\" width=\"960\" height=\"540\" \/><figcaption class=\"wp-caption-text\">Possibly swapping a kimono for an orange jump suit, Lord Hendy, the Rail Minister, and Leader of Camden Council waving off freight train at Euston. Image: \u00a9 HS2<\/figcaption><\/figure>\n<p>GB Railfreight will operate up to two trains a day during the main programme. Each train will carry approximately 715 tonnes of excavated material, equivalent to around 45 HGV loads. Trains will comprise two locomotives and up to 12 wagons, a configuration intended to maximise carrying capacity while allowing sufficient time for loading and unloading.<\/p>\n<h2>Rail reduces road traffic and emissions<\/h2>\n<p>The programme is expected to eliminate the need for more than 10,000 HGV movements on roads around Euston and elsewhere across London. This should reduce construction-related traffic, disruption for local residents and businesses, and potential road safety concerns. Rail Minister Lord Hendy said the operation would reduce HGV journeys through the streets around Euston, helping to improve road safety and cut carbon emissions. He also linked the initiative to wider progress on HS2, noting that all 23 miles of tunnels between Old Oak Common and Birmingham had been excavated.<\/p>\n<div class=\"youtube-container\" style=\"height:0;overflow:hidden;padding-bottom:56.25%;position:relative;width:100%\"><iframe loading=\"lazy\" allow=\"encrypted-media; picture-in-picture; fullscreen\" referrerpolicy=\"strict-origin-when-cross-origin\" width=\"960\" height=\"540\" src=\"https:\/\/youtube.com\/embed\/ASn78BNJ1GU?rel=0&amp;autoplay=0&amp;mute=0\" allowfullscreen><\/iframe><\/div>\n<p>More than 80% of the project&#8217;s major structures were under construction or complete. HS2 estimates that rail freight produces up to 76% fewer CO\u2082 emissions than road freight when transporting the same weight of material over the same distance. The use of rail at Euston therefore offers both local traffic and wider environmental benefits.<\/p>\n<h2>Camden welcomes move away from road haulage<\/h2>\n<p>The London Borough of Camden Council has campaigned for construction materials to be removed from Euston by rail for several years. Council leader James Slater welcomed the start of the operation, highlighting the potential reduction in lorry traffic through the borough. He said the removal of more than 10,000 lorries would reduce disruption for residents and businesses, improve air quality and cut carbon emissions. He also called for further opportunities to increase the proportion of construction material moved by rail as work at Euston progresses.<\/p>\n<p>Andy Swift, HS2&#8217;s Stations Delivery Director, said reducing the impact of construction on communities around Euston was a priority. He highlighted the collaboration between Network Rail, <a href=\"https:\/\/www.gbrailfreight.com\/\" rel=\"noopener\">GB Railfreight<\/a> and construction partners, which had made it possible to move the material by rail while maintaining passenger services.<\/p>\n<h2>Existing railway supports HS2 construction<\/h2>\n<p>The Euston operation forms part of HS2&#8217;s wider programme to make greater use of the existing railway during construction. Freight trains have already delivered aggregate to construction sites in Buckinghamshire and Birmingham, and transported tunnel segments to West Ruislip and Willesden.<\/p>\n<p>Rail freight has also carried millions of tonnes of excavated material away from <a href=\"https:\/\/www.railfreight.com\/railfreight\/2023\/07\/07\/british-rail-freight-keeps-hs2-on-schedule-at-old-oak-common\/\" rel=\"noopener\">construction sites around Old Oak Common<\/a>. That West London station will be the initial terminus of the line from Birmingham, until the project is completed in Camden. The Euston programme extends this approach to another major construction site, demonstrating how existing railway infrastructure can support large-scale engineering projects. Track 17 is expected to remain available until early 2029. HS2 Ltd will continue working with the Euston Delivery Company and other partners to explore how the facility might support construction across the wider Euston campus.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Rail freight is being used to remove up to 170,000 tonnes of excavated material from Britain\u2019s HS2 high-speed rail project construction site at Euston, avoiding\u2026<\/p>\n","protected":false},"author":10,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[1023,1088,2931,1089,343,759,2550,47,85],"tags":[12634],"class_list":["post-606520","post","type-post","status-publish","format-standard","hentry","category-england","category-euston","category-gb-railfreight","category-hs2","category-infrastructure","category-london","category-old-oak-common","category-rail-news","category-uk","tag-railfreight"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Rail freight is being used to remove up to 170,000 tonnes of excavated material from Britain\u2019s HS2 high-speed rail project construction site at Euston, avoiding\u2026\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Simon Walton\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=606520\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"High speed HS2: low-speed freight at Euston - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Rail freight is being used to remove up to 170,000 tonnes of excavated material from Britain\u2019s HS2 high-speed rail project construction site at Euston, avoiding\u2026\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=606520\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-11-20T10:00:42+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-11-20T10:00:42+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"High speed HS2: low-speed freight at Euston - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Rail freight is being used to remove up to 170,000 tonnes of excavated material from Britain\u2019s HS2 high-speed rail project construction site at Euston, avoiding\u2026\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=606520#blogposting\",\"name\":\"High speed HS2: low-speed freight at Euston - VibeWire Magazine\",\"headline\":\"High speed HS2: low-speed freight at Euston\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=10#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.railfreight.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Rail-Minister-and-Leader-of-Camden-Council-waving-off-freight-train-at-Euston_cropped.jpg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=606520\\\/#articleImage\"},\"datePublished\":\"2026-11-20T21:00:42+11:00\",\"dateModified\":\"2026-11-20T21:00:42+11:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=606520#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=606520#webpage\"},\"articleSection\":\"England, Euston, GB Railfreight, HS2, Infrastructure, London, Old Oak Common, Rail News, UK, RailFreight\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=606520#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=606520#listItem\",\"name\":\"High speed HS2: low-speed freight at Euston\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=606520#listItem\",\"position\":3,\"name\":\"High speed HS2: low-speed freight at Euston\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=606520\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=606520\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=10#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=10\",\"name\":\"Simon Walton\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=606520#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/020b8a5d94269d301ba7cb66728514654913e0230c15145597cadc788b705bf2?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Simon Walton\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=606520#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=606520\",\"name\":\"High speed HS2: low-speed freight at Euston - VibeWire Magazine\",\"description\":\"Rail freight is being used to remove up to 170,000 tonnes of excavated material from Britain\\u2019s HS2 high-speed rail project construction site at Euston, avoiding\\u2026\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=606520#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=10#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=10#author\"},\"datePublished\":\"2026-11-20T21:00:42+11:00\",\"dateModified\":\"2026-11-20T21:00:42+11:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>High speed HS2: low-speed freight at Euston - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"High speed HS2: low-speed freight at Euston - VibeWire Magazine","description":"Rail freight is being used to remove up to 170,000 tonnes of excavated material from Britain\u2019s HS2 high-speed rail project construction site at Euston, avoiding\u2026","canonical_url":"https:\/\/www.vibewire.com.au\/?p=606520","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=606520#blogposting","name":"High speed HS2: low-speed freight at Euston - VibeWire Magazine","headline":"High speed HS2: low-speed freight at Euston","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=10#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/11\/Rail-Minister-and-Leader-of-Camden-Council-waving-off-freight-train-at-Euston_cropped.jpg","@id":"https:\/\/www.vibewire.com.au\/?p=606520\/#articleImage"},"datePublished":"2026-11-20T21:00:42+11:00","dateModified":"2026-11-20T21:00:42+11:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=606520#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=606520#webpage"},"articleSection":"England, Euston, GB Railfreight, HS2, Infrastructure, London, Old Oak Common, Rail News, UK, RailFreight"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=606520#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=606520#listItem","name":"High speed HS2: low-speed freight at Euston"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=606520#listItem","position":3,"name":"High speed HS2: low-speed freight at Euston","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=606520\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=606520\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=10#author","url":"https:\/\/www.vibewire.com.au\/?author=10","name":"Simon Walton","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=606520#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/020b8a5d94269d301ba7cb66728514654913e0230c15145597cadc788b705bf2?s=96&d=mm&r=g","width":96,"height":96,"caption":"Simon Walton"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=606520#webpage","url":"https:\/\/www.vibewire.com.au\/?p=606520","name":"High speed HS2: low-speed freight at Euston - VibeWire Magazine","description":"Rail freight is being used to remove up to 170,000 tonnes of excavated material from Britain\u2019s HS2 high-speed rail project construction site at Euston, avoiding\u2026","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=606520#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=10#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=10#author"},"datePublished":"2026-11-20T21:00:42+11:00","dateModified":"2026-11-20T21:00:42+11:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"High speed HS2: low-speed freight at Euston - VibeWire Magazine","og:description":"Rail freight is being used to remove up to 170,000 tonnes of excavated material from Britain\u2019s HS2 high-speed rail project construction site at Euston, avoiding\u2026","og:url":"https:\/\/www.vibewire.com.au\/?p=606520","article:published_time":"2026-11-20T10:00:42+00:00","article:modified_time":"2026-11-20T10:00:42+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"High speed HS2: low-speed freight at Euston - VibeWire Magazine","twitter:description":"Rail freight is being used to remove up to 170,000 tonnes of excavated material from Britain\u2019s HS2 high-speed rail project construction site at Euston, avoiding\u2026","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"606520","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-11-20 12:58:24","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2026-11-20 12:53:28","updated":"2026-11-20 12:58:24","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\tHigh speed HS2: low-speed freight at Euston\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au\/"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"High speed HS2: low-speed freight at Euston","link":"https:\/\/www.vibewire.com.au\/?p=606520"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/606520","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=606520"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/606520\/revisions"}],"predecessor-version":[{"id":606658,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/606520\/revisions\/606658"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=606520"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=606520"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=606520"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}