{"id":605344,"date":"2026-11-19T20:26:39","date_gmt":"2026-11-19T09:26:39","guid":{"rendered":"https:\/\/railuk.com\/?p=206210"},"modified":"2026-11-19T20:26:39","modified_gmt":"2026-11-19T09:26:39","slug":"halfway-mark-reached-on-hs2s-new-a45-overbridge","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=605344","title":{"rendered":"Halfway mark reached on HS2\u2019s new A45 overbridge"},"content":{"rendered":"<p class=\"wp-block-paragraph\">The construction of a new overbridge on the Coventry Road, that will allow high-speed trains to travel across four tracks under the A45, has reached the pivotal halfway mark.<\/p>\n<p class=\"wp-block-paragraph\">Over the past eleven months, a team of engineers working for HS2\u2019s construction partner Balfour Beatty VINCI (BBV), have successfully completed the first section of the new Coventry Road overbridge, near Bickenhill. This unique structure is being constructed in two halves, to ensure that existing traffic flows along the A45 are maintained, minimising impacts on the local road network.<\/p>\n<p class=\"wp-block-paragraph\">Using the \u2018top down\u2019 construction method, approximately 7,5000 tonnes of earth was excavated from beneath the existing carriageway. The team then installed 46 piles, at depths of up to 23 metres, and built the pile caps to support the weight of the new 2,000-tonne bridge deck.<\/p>\n<p class=\"wp-block-paragraph\">Over the summer months, 13 pre-stressed pre-cast concrete beams were lowered into place to support the 37-metre span bridge deck, and 13 parapet units were successfully installed to one half of the structure.<\/p>\n<p class=\"wp-block-paragraph\">Completion of the waterproofing and highway works in the coming weeks means the eastbound section of the new structure will soon be brought into use, and HS2 is working closely with National Highways to prepare for the upcoming traffic management changes.<\/p>\n<p class=\"wp-block-paragraph\">From Monday, 7th December, a series of overnight and weekend closures will be put in place to facilitate the traffic switchover.&nbsp; Once complete, motorists will begin using the temporary carriageway alignment over the new eastbound section of the bridge.<\/p>\n<p class=\"wp-block-paragraph\">\u201cOur engineers have worked incredibly hard to develop a design solution that maintains traffic flows in each direction, while we build the bridge and excavate the ground below to make way for the new high-speed railway,\u201d said Paul Marshall, head of delivery at HS2 Ltd.<\/p>\n<p class=\"wp-block-paragraph\">\u201cDuring the temporary weekend and night-time closures, to facilitate the traffic switchover onto the new bridge, we\u2019ll ensure that access to businesses and properties is maintained.<\/p>\n<p class=\"wp-block-paragraph\">\u201cI\u2019d encourage motorists to familiarise themselves with the diversion routes and thank them for their patience.\u201d<\/p>\n<p class=\"wp-block-paragraph\">In the new year, BBV\u2019s engineering team will start work on the second section of the bridge, following a similar sequence of works.<\/p>\n<p class=\"wp-block-paragraph\">Below the structure, hidden from view, the team will continue excavating the trace \u2013 which will ultimately carry four railway tracks towards the new Interchange Station, just one mile away. The tracks will serve the station\u2019s four platforms, which are made up of two 425-metre-long platform islands.<\/p>\n<p class=\"wp-block-paragraph\">Richard Husbands, Balfour Beatty VINCI\u2019s project manager said: \u201cThe Coventry Road overbridge is one of the key crossings on this part of the route, allowing the railway to pass under the A45 as it approaches Interchange Station. Construction of the bridge in two halves is a complex engineering challenge, and reaching the halfway stage is an important milestone for the project.<\/p>\n<p class=\"wp-block-paragraph\">\u201cThe programme we\u2019re working to has been designed to minimise disruption for motorists and local communities as much as possible. We\u2019re grateful for everyone\u2019s continued patience, as we move to the next phase of construction.\u201d<\/p>\n<p class=\"wp-block-paragraph\">Above ground, construction will continue throughout 2027. The bridge is expected be structurally complete by the end of the year.<\/p>\n<p class=\"wp-block-paragraph\">In liaison with National Highways, engineers will then carry out the permanent highway works, installing lighting, kerbs, drainage, and permanent carriageway, with the final structure and road alignment expected to be in use by summer 2028.<\/p>\n<p class=\"wp-block-paragraph\">Image credit: HS2<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The construction of a new overbridge on the Coventry Road, that will allow high-speed trains to travel across four tracks under the A45, has reached the pivotal halfway mark. Over the past eleven months, a team of engineers working for HS2\u2019s construction partner Balfour Beatty VINCI (BBV), have successfully completed the first section of the [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[53,1089,16017,47,16148,16031,85],"tags":[],"class_list":["post-605344","post","type-post","status-publish","format-standard","hentry","category-high-speed-rail","category-hs2","category-industry-news","category-rail-news","category-rail-projects","category-structures","category-uk"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"The construction of a new overbridge on the Coventry Road, that will allow high-speed trains to travel across four tracks under the A45, has reached the pivotal halfway mark. Over the past eleven months, a team of engineers working for HS2\u2019s construction partner Balfour Beatty VINCI (BBV), have successfully completed the first section of the [\u2026]\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=605344\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Halfway mark reached on HS2\u2019s new A45 overbridge - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"The construction of a new overbridge on the Coventry Road, that will allow high-speed trains to travel across four tracks under the A45, has reached the pivotal halfway mark. Over the past eleven months, a team of engineers working for HS2\u2019s construction partner Balfour Beatty VINCI (BBV), have successfully completed the first section of the [\u2026]\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=605344\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-11-19T09:26:39+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-11-19T09:26:39+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Halfway mark reached on HS2\u2019s new A45 overbridge - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The construction of a new overbridge on the Coventry Road, that will allow high-speed trains to travel across four tracks under the A45, has reached the pivotal halfway mark. Over the past eleven months, a team of engineers working for HS2\u2019s construction partner Balfour Beatty VINCI (BBV), have successfully completed the first section of the [\u2026]\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=605344#blogposting\",\"name\":\"Halfway mark reached on HS2\\u2019s new A45 overbridge - VibeWire Magazine\",\"headline\":\"Halfway mark reached on HS2\\u2019s new A45 overbridge\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#articleImage\",\"width\":1028,\"height\":930},\"datePublished\":\"2026-11-19T20:26:39+11:00\",\"dateModified\":\"2026-11-19T20:26:39+11:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=605344#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=605344#webpage\"},\"articleSection\":\"High-Speed Rail, HS2, Industry News, Rail News, Rail Projects, Structures, UK\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=605344#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=605344#listItem\",\"name\":\"Halfway mark reached on HS2\\u2019s new A45 overbridge\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=605344#listItem\",\"position\":3,\"name\":\"Halfway mark reached on HS2\\u2019s new A45 overbridge\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=605344\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=605344\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=605344#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=605344#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=605344\",\"name\":\"Halfway mark reached on HS2\\u2019s new A45 overbridge - VibeWire Magazine\",\"description\":\"The construction of a new overbridge on the Coventry Road, that will allow high-speed trains to travel across four tracks under the A45, has reached the pivotal halfway mark. Over the past eleven months, a team of engineers working for HS2\\u2019s construction partner Balfour Beatty VINCI (BBV), have successfully completed the first section of the [\\u2026]\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=605344#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"datePublished\":\"2026-11-19T20:26:39+11:00\",\"dateModified\":\"2026-11-19T20:26:39+11:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Halfway mark reached on HS2\u2019s new A45 overbridge - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Halfway mark reached on HS2\u2019s new A45 overbridge - VibeWire Magazine","description":"The construction of a new overbridge on the Coventry Road, that will allow high-speed trains to travel across four tracks under the A45, has reached the pivotal halfway mark. Over the past eleven months, a team of engineers working for HS2\u2019s construction partner Balfour Beatty VINCI (BBV), have successfully completed the first section of the [\u2026]","canonical_url":"https:\/\/www.vibewire.com.au\/?p=605344","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=605344#blogposting","name":"Halfway mark reached on HS2\u2019s new A45 overbridge - VibeWire Magazine","headline":"Halfway mark reached on HS2\u2019s new A45 overbridge","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/#articleImage","width":1028,"height":930},"datePublished":"2026-11-19T20:26:39+11:00","dateModified":"2026-11-19T20:26:39+11:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=605344#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=605344#webpage"},"articleSection":"High-Speed Rail, HS2, Industry News, Rail News, Rail Projects, Structures, UK"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=605344#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=605344#listItem","name":"Halfway mark reached on HS2\u2019s new A45 overbridge"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=605344#listItem","position":3,"name":"Halfway mark reached on HS2\u2019s new A45 overbridge","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=605344\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=605344\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=605344#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=605344#webpage","url":"https:\/\/www.vibewire.com.au\/?p=605344","name":"Halfway mark reached on HS2\u2019s new A45 overbridge - VibeWire Magazine","description":"The construction of a new overbridge on the Coventry Road, that will allow high-speed trains to travel across four tracks under the A45, has reached the pivotal halfway mark. Over the past eleven months, a team of engineers working for HS2\u2019s construction partner Balfour Beatty VINCI (BBV), have successfully completed the first section of the [\u2026]","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=605344#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"datePublished":"2026-11-19T20:26:39+11:00","dateModified":"2026-11-19T20:26:39+11:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Halfway mark reached on HS2\u2019s new A45 overbridge - VibeWire Magazine","og:description":"The construction of a new overbridge on the Coventry Road, that will allow high-speed trains to travel across four tracks under the A45, has reached the pivotal halfway mark. Over the past eleven months, a team of engineers working for HS2\u2019s construction partner Balfour Beatty VINCI (BBV), have successfully completed the first section of the [\u2026]","og:url":"https:\/\/www.vibewire.com.au\/?p=605344","article:published_time":"2026-11-19T09:26:39+00:00","article:modified_time":"2026-11-19T09:26:39+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Halfway mark reached on HS2\u2019s new A45 overbridge - VibeWire Magazine","twitter:description":"The construction of a new overbridge on the Coventry Road, that will allow high-speed trains to travel across four tracks under the A45, has reached the pivotal halfway mark. Over the past eleven months, a team of engineers working for HS2\u2019s construction partner Balfour Beatty VINCI (BBV), have successfully completed the first section of the [\u2026]","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"605344","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-11-19 09:59:26","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2026-11-19 09:56:09","updated":"2026-11-19 09:59:26","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\tHalfway mark reached on HS2\u2019s new A45 overbridge\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au\/"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"Halfway mark reached on HS2\u2019s new A45 overbridge","link":"https:\/\/www.vibewire.com.au\/?p=605344"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/605344","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=605344"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/605344\/revisions"}],"predecessor-version":[{"id":605345,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/605344\/revisions\/605345"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=605344"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=605344"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=605344"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}