{"id":604323,"date":"2026-11-18T19:56:32","date_gmt":"2026-11-18T08:56:32","guid":{"rendered":"https:\/\/www.railfreight.com\/?p=76089"},"modified":"2026-11-18T19:56:32","modified_gmt":"2026-11-18T08:56:32","slug":"spain-blames-weak-commercial-demand-for-lack-of-progress-on-asturias-rail-highway-2","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=604323","title":{"rendered":"Spain blames weak commercial demand for lack of progress on Asturias rail highway"},"content":{"rendered":"<p><strong>The planned rail highway between the Asturian port of Gij\u00f3n and Valladolid has made almost no progress, more than a year after it was announced. The Spanish infrastructure manager Adif points to a lack of interest from companies in shifting road freight to rail.<\/strong><br \/>\n<span id=\"more-76089\"><\/span>The regional government of Asturias announced the project in June 2025. The idea was to load truck semi-trailers onto trains at El Musel in Gij\u00f3n\u2019s port and run them to Valladolid. In that city, Spain is developing a logistics hub with connections to Basque Country and France. The route would use the <a href=\"https:\/\/www.railfreight.com\/corridors\/2023\/11\/30\/pajares-bypass-in-northwestern-spain-is-finally-open\/\" rel=\"noopener\">Pajares<\/a> Variant railway, which has boosted passenger traffic in the past. It has not yielded similar results for freight yet.<\/p>\n<p>Sources at Adif have said that the project \u201chas barely made any progress\u201d, according to publication La Nueva Espa\u00f1a. Meetings took place between the region Asturias government, the Ministry of Transport, Adif and the Office of the Atlantic Corridor Commissioner. However, these have not generated tangible results.<\/p>\n<h2>The clearance problem<\/h2>\n<p>The main technical hurdle is the size of the tunnels on the Asturian line. These limit the clearance available for semi-trailers. To avoid major construction works, the rail carrier Alsa Rail has proposed using special wagons that carry loading units low enough to fit through existing infrastructure. Adif has yet to validate the solution for the entire route.<\/p>\n<p>The Asturian government maintains that the project is moving forward and is technically viable with the current infrastructure. Still, it has not said when the relevant studies will be finished, when the operation will be approved or when trains could start running.<\/p>\n<p>In the meantime, rail highways are gaining ground elsewhere in Spain. Adif currently operates three routes: Valencia\u2013Madrid, Madrid\u2013Badajoz and Barcelona\u2013Le Perthus. It is also preparing a rail highway on the Huelva\u2013C\u00f3rdoba corridor and working on additional routes. The Gij\u00f3n\u2013Valladolid link is not among the projects highlighted by Adif.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The planned rail highway between the Asturian port of Gij\u00f3n and Valladolid has made almost no progress, more than a year after it was announced.\u2026<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[1098,17261,10384,19558,65,471,21618,78,17020,47,1024,7273],"tags":[12634],"class_list":["post-604323","post","type-post","status-publish","format-standard","hentry","category-adif","category-alsa-rail","category-asturias","category-gijon","category-intermodal","category-news","category-pajares-variant","category-rail-freight","category-rail-highway","category-rail-news","category-spain","category-valladolid","tag-railfreight"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"The planned rail highway between the Asturian port of Gij\u00f3n and Valladolid has made almost no progress, more than a year after it was announced.\u2026\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=604323\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Spain blames weak commercial demand for lack of progress on Asturias rail highway - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"The planned rail highway between the Asturian port of Gij\u00f3n and Valladolid has made almost no progress, more than a year after it was announced.\u2026\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=604323\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-11-18T08:56:32+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-11-18T08:56:32+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Spain blames weak commercial demand for lack of progress on Asturias rail highway - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The planned rail highway between the Asturian port of Gij\u00f3n and Valladolid has made almost no progress, more than a year after it was announced.\u2026\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=604323#blogposting\",\"name\":\"Spain blames weak commercial demand for lack of progress on Asturias rail highway - VibeWire Magazine\",\"headline\":\"Spain blames weak commercial demand for lack of progress on Asturias rail highway\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#articleImage\",\"width\":1028,\"height\":930},\"datePublished\":\"2026-11-18T19:56:32+11:00\",\"dateModified\":\"2026-11-18T19:56:32+11:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=604323#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=604323#webpage\"},\"articleSection\":\"Adif, Alsa Rail, Asturias, Gijon, Intermodal, News, Pajares Variant, Rail freight, Rail highway, Rail News, Spain, Valladolid, RailFreight\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=604323#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=604323#listItem\",\"name\":\"Spain blames weak commercial demand for lack of progress on Asturias rail highway\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=604323#listItem\",\"position\":3,\"name\":\"Spain blames weak commercial demand for lack of progress on Asturias rail highway\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=604323\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=604323\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=604323#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=604323#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=604323\",\"name\":\"Spain blames weak commercial demand for lack of progress on Asturias rail highway - VibeWire Magazine\",\"description\":\"The planned rail highway between the Asturian port of Gij\\u00f3n and Valladolid has made almost no progress, more than a year after it was announced.\\u2026\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=604323#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"datePublished\":\"2026-11-18T19:56:32+11:00\",\"dateModified\":\"2026-11-18T19:56:32+11:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Spain blames weak commercial demand for lack of progress on Asturias rail highway - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Spain blames weak commercial demand for lack of progress on Asturias rail highway - VibeWire Magazine","description":"The planned rail highway between the Asturian port of Gij\u00f3n and Valladolid has made almost no progress, more than a year after it was announced.\u2026","canonical_url":"https:\/\/www.vibewire.com.au\/?p=604323","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=604323#blogposting","name":"Spain blames weak commercial demand for lack of progress on Asturias rail highway - VibeWire Magazine","headline":"Spain blames weak commercial demand for lack of progress on Asturias rail highway","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/#articleImage","width":1028,"height":930},"datePublished":"2026-11-18T19:56:32+11:00","dateModified":"2026-11-18T19:56:32+11:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=604323#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=604323#webpage"},"articleSection":"Adif, Alsa Rail, Asturias, Gijon, Intermodal, News, Pajares Variant, Rail freight, Rail highway, Rail News, Spain, Valladolid, RailFreight"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=604323#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=604323#listItem","name":"Spain blames weak commercial demand for lack of progress on Asturias rail highway"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=604323#listItem","position":3,"name":"Spain blames weak commercial demand for lack of progress on Asturias rail highway","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=604323\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=604323\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=604323#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=604323#webpage","url":"https:\/\/www.vibewire.com.au\/?p=604323","name":"Spain blames weak commercial demand for lack of progress on Asturias rail highway - VibeWire Magazine","description":"The planned rail highway between the Asturian port of Gij\u00f3n and Valladolid has made almost no progress, more than a year after it was announced.\u2026","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=604323#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"datePublished":"2026-11-18T19:56:32+11:00","dateModified":"2026-11-18T19:56:32+11:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Spain blames weak commercial demand for lack of progress on Asturias rail highway - VibeWire Magazine","og:description":"The planned rail highway between the Asturian port of Gij\u00f3n and Valladolid has made almost no progress, more than a year after it was announced.\u2026","og:url":"https:\/\/www.vibewire.com.au\/?p=604323","article:published_time":"2026-11-18T08:56:32+00:00","article:modified_time":"2026-11-18T08:56:32+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Spain blames weak commercial demand for lack of progress on Asturias rail highway - VibeWire Magazine","twitter:description":"The planned rail highway between the Asturian port of Gij\u00f3n and Valladolid has made almost no progress, more than a year after it was announced.\u2026","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"604323","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-11-18 09:48:15","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2026-11-18 09:47:46","updated":"2026-11-18 09:48:15","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\tSpain blames weak commercial demand for lack of progress on Asturias rail highway\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au\/"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"Spain blames weak commercial demand for lack of progress on Asturias rail highway","link":"https:\/\/www.vibewire.com.au\/?p=604323"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/604323","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=604323"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/604323\/revisions"}],"predecessor-version":[{"id":604325,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/604323\/revisions\/604325"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=604323"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=604323"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=604323"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}