{"id":598597,"date":"2026-11-12T15:20:32","date_gmt":"2026-11-12T04:20:32","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=598597"},"modified":"2026-11-12T15:20:33","modified_gmt":"2026-11-12T04:20:33","slug":"aemc-introduces-new-electricity-grid-connection-rules-for-large-data-centres","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=598597","title":{"rendered":"AEMC introduces new electricity grid connection rules for large data centres"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The Australian Energy Market Commission (AEMC) has finalised new technical standards governing large electricity loads connecting to the National Electricity Market (NEM).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This is particularly important for Australia&#8217;s growing data centre industry.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Key changes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>A new 30MW threshold applies to large inverter-based loads, including data centres.<\/li>\n\n\n\n<li>Large facilities must meet technical standards designed to help them remain connected during certain electricity network disturbances.<\/li>\n\n\n\n<li>Network businesses must assess the combined impact of nearby large loads rather than looking at each connection in isolation.<\/li>\n\n\n\n<li>AEMO will develop modelling guidance to help assess the impact of these connections.<\/li>\n\n\n\n<li>The new rules apply immediately, with a six-month transition period for certain advanced connection applicants.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The AEMC estimates data centre electricity consumption could increase from approximately 5TWh currently to 34TWh by 2035.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That would represent approximately 13% of total National Electricity Market consumption.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Power availability is becoming one of the biggest determinants of whether a proposed Australian data centre can actually be delivered.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The new rules will increase the importance of early engagement with electricity network operators, technical connection studies and power system design.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">They also reinforce the expectation that large data centre developments must operate in a way that protects the stability of the wider electricity network.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Australian Energy Market Commission (AEMC) has finalised new technical standards governing large electricity loads connecting to the National Electricity Market (NEM).<\/p>\n","protected":false},"author":90574,"featured_media":592914,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[18607,12785],"tags":[21361,13137],"class_list":["post-598597","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ai-news","category-data-centre","tag-aemc","tag-aemo"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.5 - aioseo.com -->\n\t<meta name=\"description\" content=\"The Australian Energy Market Commission (AEMC) has finalised new technical standards governing large electricity loads connecting to the National Electricity Market (NEM).\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Telco Analyst\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=598597\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.5\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"AEMC introduces new electricity grid connection rules for large data centres\" \/>\n\t\t<meta property=\"og:description\" content=\"The Australian Energy Market Commission (AEMC) has finalised new technical standards governing large electricity loads connecting to the National Electricity Market (NEM).\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=598597\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/11\/1c03a8781be21425a378a3ecbd7088bc.avif\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/11\/1c03a8781be21425a378a3ecbd7088bc.avif\" \/>\n\t\t<meta property=\"og:image:width\" content=\"862\" \/>\n\t\t<meta property=\"og:image:height\" content=\"575\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-11-12T04:20:32+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-11-12T04:20:33+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"AEMC introduces new electricity grid connection rules for large data centres\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The Australian Energy Market Commission (AEMC) has finalised new technical standards governing large electricity loads connecting to the National Electricity Market (NEM).\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/11\/1c03a8781be21425a378a3ecbd7088bc.avif\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=598597#blogposting\",\"name\":\"AEMC introduces new electricity grid connection rules for large data centres\",\"headline\":\"AEMC introduces new electricity grid connection rules for large data centres\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=90574#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/1c03a8781be21425a378a3ecbd7088bc.avif\",\"width\":862,\"height\":575},\"datePublished\":\"2026-11-12T15:20:32+11:00\",\"dateModified\":\"2026-11-12T15:20:33+11:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=598597#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=598597#webpage\"},\"articleSection\":\"AI News, Data Centre, AEMC, AEMO\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=598597#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=12785#listItem\",\"name\":\"Data Centre\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=12785#listItem\",\"position\":2,\"name\":\"Data Centre\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=12785\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=598597#listItem\",\"name\":\"AEMC introduces new electricity grid connection rules for large data centres\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=598597#listItem\",\"position\":3,\"name\":\"AEMC introduces new electricity grid connection rules for large data centres\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=12785#listItem\",\"name\":\"Data Centre\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=598597\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=598597\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=90574#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=90574\",\"name\":\"Telco Analyst\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=598597#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/223a29ff455a766a9ceca4c2dc0352aa8baef27c37eba4cf388f9d8bb7abff7e?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Telco Analyst\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=598597#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=598597\",\"name\":\"AEMC introduces new electricity grid connection rules for large data centres\",\"description\":\"The Australian Energy Market Commission (AEMC) has finalised new technical standards governing large electricity loads connecting to the National Electricity Market (NEM).\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=598597#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=90574#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=90574#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/1c03a8781be21425a378a3ecbd7088bc.avif\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=598597\\\/#mainImage\",\"width\":862,\"height\":575},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=598597#mainImage\"},\"datePublished\":\"2026-11-12T15:20:32+11:00\",\"dateModified\":\"2026-11-12T15:20:33+11:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>AEMC introduces new electricity grid connection rules for large data centres<\/title>\n\n","aioseo_head_json":{"title":"AEMC introduces new electricity grid connection rules for large data centres","description":"The Australian Energy Market Commission (AEMC) has finalised new technical standards governing large electricity loads connecting to the National Electricity Market (NEM).","canonical_url":"https:\/\/www.vibewire.com.au\/?p=598597","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=598597#blogposting","name":"AEMC introduces new electricity grid connection rules for large data centres","headline":"AEMC introduces new electricity grid connection rules for large data centres","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=90574#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/11\/1c03a8781be21425a378a3ecbd7088bc.avif","width":862,"height":575},"datePublished":"2026-11-12T15:20:32+11:00","dateModified":"2026-11-12T15:20:33+11:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=598597#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=598597#webpage"},"articleSection":"AI News, Data Centre, AEMC, AEMO"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=598597#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=12785#listItem","name":"Data Centre"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=12785#listItem","position":2,"name":"Data Centre","item":"https:\/\/www.vibewire.com.au\/?cat=12785","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=598597#listItem","name":"AEMC introduces new electricity grid connection rules for large data centres"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=598597#listItem","position":3,"name":"AEMC introduces new electricity grid connection rules for large data centres","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=12785#listItem","name":"Data Centre"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=598597\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=598597\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=90574#author","url":"https:\/\/www.vibewire.com.au\/?author=90574","name":"Telco Analyst","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=598597#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/223a29ff455a766a9ceca4c2dc0352aa8baef27c37eba4cf388f9d8bb7abff7e?s=96&d=mm&r=g","width":96,"height":96,"caption":"Telco Analyst"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=598597#webpage","url":"https:\/\/www.vibewire.com.au\/?p=598597","name":"AEMC introduces new electricity grid connection rules for large data centres","description":"The Australian Energy Market Commission (AEMC) has finalised new technical standards governing large electricity loads connecting to the National Electricity Market (NEM).","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=598597#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=90574#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=90574#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/11\/1c03a8781be21425a378a3ecbd7088bc.avif","@id":"https:\/\/www.vibewire.com.au\/?p=598597\/#mainImage","width":862,"height":575},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=598597#mainImage"},"datePublished":"2026-11-12T15:20:32+11:00","dateModified":"2026-11-12T15:20:33+11:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"AEMC introduces new electricity grid connection rules for large data centres","og:description":"The Australian Energy Market Commission (AEMC) has finalised new technical standards governing large electricity loads connecting to the National Electricity Market (NEM).","og:url":"https:\/\/www.vibewire.com.au\/?p=598597","og:image":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/11\/1c03a8781be21425a378a3ecbd7088bc.avif","og:image:secure_url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/11\/1c03a8781be21425a378a3ecbd7088bc.avif","og:image:width":"862","og:image:height":"575","article:published_time":"2026-11-12T04:20:32+00:00","article:modified_time":"2026-11-12T04:20:33+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"AEMC introduces new electricity grid connection rules for large data centres","twitter:description":"The Australian Energy Market Commission (AEMC) has finalised new technical standards governing large electricity loads connecting to the National Electricity Market (NEM).","twitter:creator":"@VibewireCentral","twitter:image":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/11\/1c03a8781be21425a378a3ecbd7088bc.avif"},"aioseo_meta_data":{"post_id":"598597","title":"#post_title","description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"The AEMC estimates data centre electricity consumption could increase from approximately 5TWh currently to 34TWh by 2035.","score":0,"analysis":[]},"additional":[{"keyphrase":"The Australian Energy Market Commission (AEMC)","score":0},{"keyphrase":"National Electricity Market (NEM)","score":0}]},"primary_term":null,"canonical_url":null,"og_title":"#post_title","og_description":"#post_excerpt","og_object_type":"default","og_image_type":"featured","og_image_url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/11\/1c03a8781be21425a378a3ecbd7088bc.avif","og_image_width":"862","og_image_height":"575","og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":true,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"seo_analyzer_scan_date":"2026-11-12 04:23:14","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-11-12 04:12:50","updated":"2026-11-12 04:23:14","focus_keyword":"The AEMC estimates data centre electricity consumption could increase from approximately 5TWh currently to 34TWh by 2035.","additional_keywords":[{"word":"The Australian Energy Market Commission (AEMC)","score":74,"items":{"introductionKeyword":{"score":9},"keyphraseLength":{"score":6},"keyphraseDensity":{"score":4},"functionWordsInKeyphrase":{"score":9},"textCompetingLinks":{"score":9},"imageKeyphrase":{"score":3}}},{"word":"National Electricity Market (NEM)","score":80,"items":{"introductionKeyword":{"score":9},"keyphraseLength":{"score":9},"keyphraseDensity":{"score":4},"functionWordsInKeyphrase":{"score":9},"textCompetingLinks":{"score":9},"imageKeyphrase":{"score":3}}}],"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=12785\" title=\"Data Centre\">Data Centre<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\tAEMC introduces new electricity grid connection rules for large data centres\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au\/"},{"label":"Data Centre","link":"https:\/\/www.vibewire.com.au\/?cat=12785"},{"label":"AEMC introduces new electricity grid connection rules for large data centres","link":"https:\/\/www.vibewire.com.au\/?p=598597"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/598597","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/90574"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=598597"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/598597\/revisions"}],"predecessor-version":[{"id":598599,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/598597\/revisions\/598599"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/media\/592914"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=598597"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=598597"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=598597"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}