{"id":598135,"date":"2026-11-11T23:10:54","date_gmt":"2026-11-11T12:10:54","guid":{"rendered":"https:\/\/railuk.com\/?p=205915"},"modified":"2026-11-11T23:10:54","modified_gmt":"2026-11-11T12:10:54","slug":"february-half-term-closure-will-deliver-major-brighton-main-line-improvements","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=598135","title":{"rendered":"February half-term closure will deliver major Brighton Main Line improvements"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Buses will replace trains as a significant investment on the Brighton Main Line over the February half-term will improve the reliability of the route into the future.<\/p>\n<p class=\"wp-block-paragraph\">Network Rail and train operators are urging customers to plan ahead and check before they travel over the February half-term as major engineering work will close a section on the busy Brighton Main Line from Saturday 13 to Sunday 21 February 2027.<\/p>\n<p class=\"wp-block-paragraph\">The work forms part of a significant investment to improve the reliability and safety of this vital route, which is among the most complex and intensively used in the country.<\/p>\n<p class=\"wp-block-paragraph\">Engineers will complete a concentrated programme of track renewals, strengthening of earthworks, new conductor rail and level crossing and tunnel improvements.<\/p>\n<p class=\"wp-block-paragraph\">Key improvements include:<\/p>\n<ul class=\"wp-block-list\">\n<li>Track renewal: New rails at Plumpton and Preston Park plus renewed track and switches and crossings at Keymer Junction near Wivelsfield to help cut delays and boost performance.<\/li>\n<li>Earthworks: Strengthening and stabilisation works at Haywards Heath cutting and the Balcombe Stamford rock cutting to reduce the risk of landslips and rock falls.<\/li>\n<li>Tunnels: Structural works at Balcombe Tunnel to ensure continued safe operation and install of new rails through the Clayton Tunnel.<\/li>\n<li>Electrical: New conductor rail between the Clayton Tunnel and Preston Park. The conductor rail, also known as the third rail, allows us to supply power to the trains.<\/li>\n<li>Level crossings: new signalling and renewal of the level crossings at Spatham Lane near Westmeston, and at Hamsey in East Sussex.<\/li>\n<\/ul>\n<p class=\"wp-block-paragraph\">Lucy McAuliffe, Network Rail\u2019s Sussex route director, said: \u201cThe Brighton Main Line is one of the busiest rail corridors in the country, with complex and intensively used infrastructure. This work is vital to reduce faults, improve journey reliability and keep services running safely for years to come.<\/p>\n<p class=\"wp-block-paragraph\">\u201cWe know closing the railway is an inconvenience, but the extended closure over February half-term 2027 allows us to deliver a huge volume of work at once, avoiding repeated disruption across multiple weekends or during the busy summer season.\u201d<\/p>\n<p class=\"wp-block-paragraph\">Jenny Saunders, Southern, Gatwick Express and Thameslink Customer Service Director commented:\u202f\u201cThis major work over February half-term week is crucial to keeping services reliable for our Gatwick Express, Southern, and Thameslink customers. We\u2019ve been working on detailed plans to keep customers moving. Trains to and from Brighton will be diverted and buses will replace services on affected routes for nine days, so we\u2019re asking customers to save the dates in their diaries.<\/p>\n<p class=\"wp-block-paragraph\">\u201cBy giving people advance notice, we\u2019re encouraging everyone to think about their travel options over that week in February, especially as some may find it easier to plan to work flexibly where they can.\u201d<\/p>\n<p class=\"wp-block-paragraph\">During the nine-day closure, rail replacement buses will run between Three Bridges and Brighton or Lewes via Haywards Heath and other intermediate stations.<\/p>\n<p class=\"wp-block-paragraph\">There will also be a direct train service between London Victoria, and Brighton, but it will be diverted to use an alternative route via Horsham and Littlehampton, extending journey times. Customers travelling between the Brighton and Hove areas and Gatwick Airport or London are encouraged to use this diverted train service rather than replacement buses.<\/p>\n<p class=\"wp-block-paragraph\">A major information campaign is now getting under way to provide customers with advance notice of the dates. Customers are being advised to plan ahead, and allow extra time for their journeys throughout the nine-day closure. More information about the work that is being carried out, the impact on journeys, and\u00a0 plans for keeping people moving during the work will be available on the Network Rail and train operators\u2019 websites.\u00a0<\/p>\n<p class=\"wp-block-paragraph\">Image credit: Network Rail<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Buses will replace trains as a significant investment on the Brighton Main Line over the February half-term will improve the reliability of the route into the future. Network Rail and train operators are urging customers to plan ahead and check before they travel over the February half-term as major engineering work will close a section [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[11323,16017,343,16015,47,16031,913,85],"tags":[],"class_list":["post-598135","post","type-post","status-publish","format-standard","hentry","category-electrification","category-industry-news","category-infrastructure","category-permanent-way","category-rail-news","category-structures","category-travel","category-uk"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.5 - aioseo.com -->\n\t<meta name=\"description\" content=\"Buses will replace trains as a significant investment on the Brighton Main Line over the February half-term will improve the reliability of the route into the future. Network Rail and train operators are urging customers to plan ahead and check before they travel over the February half-term as major engineering work will close a section [\u2026]\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=598135\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.5\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"February half-term closure will deliver major Brighton Main Line improvements - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Buses will replace trains as a significant investment on the Brighton Main Line over the February half-term will improve the reliability of the route into the future. Network Rail and train operators are urging customers to plan ahead and check before they travel over the February half-term as major engineering work will close a section [\u2026]\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=598135\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-11-11T12:10:54+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-11-11T12:10:54+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"February half-term closure will deliver major Brighton Main Line improvements - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Buses will replace trains as a significant investment on the Brighton Main Line over the February half-term will improve the reliability of the route into the future. Network Rail and train operators are urging customers to plan ahead and check before they travel over the February half-term as major engineering work will close a section [\u2026]\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=598135#blogposting\",\"name\":\"February half-term closure will deliver major Brighton Main Line improvements - VibeWire Magazine\",\"headline\":\"February half-term closure will deliver major Brighton Main Line improvements\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#articleImage\",\"width\":1028,\"height\":930},\"datePublished\":\"2026-11-11T23:10:54+11:00\",\"dateModified\":\"2026-11-11T23:10:54+11:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=598135#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=598135#webpage\"},\"articleSection\":\"Electrification, Industry News, Infrastructure, Permanent Way, Rail News, Structures, Travel, UK\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=598135#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=598135#listItem\",\"name\":\"February half-term closure will deliver major Brighton Main Line improvements\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=598135#listItem\",\"position\":3,\"name\":\"February half-term closure will deliver major Brighton Main Line improvements\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=598135\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=598135\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=598135#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=598135#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=598135\",\"name\":\"February half-term closure will deliver major Brighton Main Line improvements - VibeWire Magazine\",\"description\":\"Buses will replace trains as a significant investment on the Brighton Main Line over the February half-term will improve the reliability of the route into the future. Network Rail and train operators are urging customers to plan ahead and check before they travel over the February half-term as major engineering work will close a section [\\u2026]\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=598135#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"datePublished\":\"2026-11-11T23:10:54+11:00\",\"dateModified\":\"2026-11-11T23:10:54+11:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>February half-term closure will deliver major Brighton Main Line improvements - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"February half-term closure will deliver major Brighton Main Line improvements - VibeWire Magazine","description":"Buses will replace trains as a significant investment on the Brighton Main Line over the February half-term will improve the reliability of the route into the future. Network Rail and train operators are urging customers to plan ahead and check before they travel over the February half-term as major engineering work will close a section [\u2026]","canonical_url":"https:\/\/www.vibewire.com.au\/?p=598135","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=598135#blogposting","name":"February half-term closure will deliver major Brighton Main Line improvements - VibeWire Magazine","headline":"February half-term closure will deliver major Brighton Main Line improvements","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/#articleImage","width":1028,"height":930},"datePublished":"2026-11-11T23:10:54+11:00","dateModified":"2026-11-11T23:10:54+11:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=598135#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=598135#webpage"},"articleSection":"Electrification, Industry News, Infrastructure, Permanent Way, Rail News, Structures, Travel, UK"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=598135#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=598135#listItem","name":"February half-term closure will deliver major Brighton Main Line improvements"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=598135#listItem","position":3,"name":"February half-term closure will deliver major Brighton Main Line improvements","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=598135\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=598135\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=598135#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=598135#webpage","url":"https:\/\/www.vibewire.com.au\/?p=598135","name":"February half-term closure will deliver major Brighton Main Line improvements - VibeWire Magazine","description":"Buses will replace trains as a significant investment on the Brighton Main Line over the February half-term will improve the reliability of the route into the future. Network Rail and train operators are urging customers to plan ahead and check before they travel over the February half-term as major engineering work will close a section [\u2026]","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=598135#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"datePublished":"2026-11-11T23:10:54+11:00","dateModified":"2026-11-11T23:10:54+11:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"February half-term closure will deliver major Brighton Main Line improvements - VibeWire Magazine","og:description":"Buses will replace trains as a significant investment on the Brighton Main Line over the February half-term will improve the reliability of the route into the future. Network Rail and train operators are urging customers to plan ahead and check before they travel over the February half-term as major engineering work will close a section [\u2026]","og:url":"https:\/\/www.vibewire.com.au\/?p=598135","article:published_time":"2026-11-11T12:10:54+00:00","article:modified_time":"2026-11-11T12:10:54+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"February half-term closure will deliver major Brighton Main Line improvements - VibeWire Magazine","twitter:description":"Buses will replace trains as a significant investment on the Brighton Main Line over the February half-term will improve the reliability of the route into the future. Network Rail and train operators are urging customers to plan ahead and check before they travel over the February half-term as major engineering work will close a section [\u2026]","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"598135","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-11-11 12:23:47","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2026-11-11 12:20:09","updated":"2026-11-11 12:23:47","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\tFebruary half-term closure will deliver major Brighton Main Line improvements\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au\/"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"February half-term closure will deliver major Brighton Main Line improvements","link":"https:\/\/www.vibewire.com.au\/?p=598135"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/598135","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=598135"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/598135\/revisions"}],"predecessor-version":[{"id":598136,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/598135\/revisions\/598136"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=598135"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=598135"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=598135"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}