{"id":596138,"date":"2026-11-09T20:45:50","date_gmt":"2026-11-09T09:45:50","guid":{"rendered":"https:\/\/www.railfreight.com\/?p=75873"},"modified":"2026-11-09T20:45:50","modified_gmt":"2026-11-09T09:45:50","slug":"barking-london-painful-recovery-continues","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=596138","title":{"rendered":"Barking, London: painful recovery continues"},"content":{"rendered":"<p><strong>Extensive infrastructure damage following the Barking derailment has left rail freight and port operators with uncertainty. Nevertheless, passenger operator c2c, also badly disrupted, says it is making good progress on site at Barking station. The nationalised operator hopes to restore some of its own services by Wednesday 11 November.<\/strong><br \/>\n<span id=\"more-75873\"><\/span><\/p>\n<p>The derailment of a GB Railfreight intermodal train on 23 October has caused extensive damage to railway infrastructure, disrupting rail connections serving the ports of Tilbury and London Gateway. Various collaborating agencies continued working over the weekend. However, the recovery of freight services remains a separate concern. While repairs are progressing, the timetable for restoring normal freight operations remains unclear. A further update is expected later today (Monday, 9 November).<\/p>\n<h2>Major reconstruction at Barking<\/h2>\n<p>The incident happened at approximately 13:10 on Friday 23 October, when a GB Railfreight container train travelling from London Gateway towards Hams Hall, Birmingham, partially <a href=\"https:\/\/www.railfreight.com\/railfreight\/2026\/10\/30\/east-london-extended-disruption-after-barking-derailment\/\" rel=\"noopener\">derailed at Barking station and blocked access to some platforms and lines<\/a>. Some of the damage to 1.2km of track, signalling equipment and cables must be completely rebuilt.<\/p>\n<figure class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"fluid wp-image-75876 size-full\" src=\"https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/11\/Barking-recovery-1-c2c.jpg\" alt=\"Night renewals. After the derailment, several agencies and contractors have been working around the clock at Barking. Image from c2c\" width=\"960\" height=\"540\" \/><figcaption class=\"wp-caption-text\">Night renewals. After the derailment, several agencies and contractors have been working around the clock at Barking. Image: \u00a9 c2c<\/figcaption><\/figure>\n<p>According to c2c&#8217;s weekend update, engineering teams are working around the clock. Their tasks include replacing sections of points, which have been manufactured to order in Wales and were expected to arrive at Barking over the weekend. The objective remains to complete the major repairs during this week.<\/p>\n<h2>Barking freight connections a bigger question<\/h2>\n<p>For the freight sector, the consequences extend well beyond the immediate disruption at Barking. The affected railway provides important connections for two major container ports on the River Thames. DP World&#8217;s London Gateway and Forth Ports&#8217; terminals at Tilbury are both adversely affected.<\/p>\n<p>The disruption has forced operators and their customers to consider alternative arrangements for inland container movements. Forth Ports previously advised customers that no freight trains would operate to or from its terminals while the line remained closed. DP World reported a reduced rail freight service at London Gateway, working with customers and infrastructure agency Network Rail to minimise the impact.<\/p>\n<h2>Rail operations in general await clarity<\/h2>\n<p>Shipping companies have also been making contingency arrangements. Hamburg-headquartered Hapag-Lloyd advised London Gateway customers that rail services had been suspended, recommending road transport for merchant-haulage cargo and alternative arrangements for carrier-haulage movements (likely to be redirection to other ports or deferred delivery). The extent of any resulting backlog, and the time required to clear it, has not been established.<\/p>\n<figure class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"fluid wp-image-75877 size-full\" src=\"https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/11\/Barking-recovery-2-c2c.jpg\" alt=\"Back to basics. Ground works to completely renew damaged track at Barking. Image courtesy of c2c.\" width=\"960\" height=\"640\" \/><figcaption class=\"wp-caption-text\">Back to basics. Ground works to completely renew damaged track at Barking. Image: \u00a9 c2c.<\/figcaption><\/figure>\n<p>Although the freight consequences are substantial, the disruption has also affected local passenger services. Nationalised operator c2c has been unable to serve Dagenham Dock, Rainham and Purfleet, with replacement buses and alternative ticket acceptance arrangements introduced for affected passengers. Such options are not open to freight operators and, like everyone else, they await a <a href=\"https:\/\/www.facebook.com\/c2cRail\" rel=\"noopener\">planned update from GBR Anglia<\/a> (Network Rail and c2c jointly) later on Monday.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Extensive infrastructure damage following the Barking derailment has left rail freight and port operators with uncertainty. Nevertheless, passenger operator c2c, also badly disrupted, says it\u2026<\/p>\n","protected":false},"author":10,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[2859,4572,3032,1023,5739,2931,14553,343,759,2973,47,13683,85],"tags":[12634],"class_list":["post-596138","post","type-post","status-publish","format-standard","hentry","category-barking","category-c2c","category-dp-world","category-england","category-forth-ports","category-gb-railfreight","category-hapag-lloyd","category-infrastructure","category-london","category-london-gateway","category-rail-news","category-tilbury","category-uk","tag-railfreight"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.5 - aioseo.com -->\n\t<meta name=\"description\" content=\"Extensive infrastructure damage following the Barking derailment has left rail freight and port operators with uncertainty. Nevertheless, passenger operator c2c, also badly disrupted, says it\u2026\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Simon Walton\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=596138\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.5\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Barking, London: painful recovery continues - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Extensive infrastructure damage following the Barking derailment has left rail freight and port operators with uncertainty. Nevertheless, passenger operator c2c, also badly disrupted, says it\u2026\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=596138\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-11-09T09:45:50+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-11-09T09:45:50+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Barking, London: painful recovery continues - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Extensive infrastructure damage following the Barking derailment has left rail freight and port operators with uncertainty. Nevertheless, passenger operator c2c, also badly disrupted, says it\u2026\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=596138#blogposting\",\"name\":\"Barking, London: painful recovery continues - VibeWire Magazine\",\"headline\":\"Barking, London: painful recovery continues\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=10#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.railfreight.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Barking-recovery-1-c2c.jpg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=596138\\\/#articleImage\"},\"datePublished\":\"2026-11-09T20:45:50+11:00\",\"dateModified\":\"2026-11-09T20:45:50+11:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=596138#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=596138#webpage\"},\"articleSection\":\"Barking, c2c, DP World, England, Forth Ports, GB Railfreight, Hapag-Lloyd, Infrastructure, London, London Gateway, Rail News, Tilbury, UK, RailFreight\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=596138#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=596138#listItem\",\"name\":\"Barking, London: painful recovery continues\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=596138#listItem\",\"position\":3,\"name\":\"Barking, London: painful recovery continues\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=596138\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=596138\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=10#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=10\",\"name\":\"Simon Walton\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=596138#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/020b8a5d94269d301ba7cb66728514654913e0230c15145597cadc788b705bf2?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Simon Walton\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=596138#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=596138\",\"name\":\"Barking, London: painful recovery continues - VibeWire Magazine\",\"description\":\"Extensive infrastructure damage following the Barking derailment has left rail freight and port operators with uncertainty. Nevertheless, passenger operator c2c, also badly disrupted, says it\\u2026\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=596138#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=10#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=10#author\"},\"datePublished\":\"2026-11-09T20:45:50+11:00\",\"dateModified\":\"2026-11-09T20:45:50+11:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Barking, London: painful recovery continues - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Barking, London: painful recovery continues - VibeWire Magazine","description":"Extensive infrastructure damage following the Barking derailment has left rail freight and port operators with uncertainty. Nevertheless, passenger operator c2c, also badly disrupted, says it\u2026","canonical_url":"https:\/\/www.vibewire.com.au\/?p=596138","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=596138#blogposting","name":"Barking, London: painful recovery continues - VibeWire Magazine","headline":"Barking, London: painful recovery continues","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=10#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/11\/Barking-recovery-1-c2c.jpg","@id":"https:\/\/www.vibewire.com.au\/?p=596138\/#articleImage"},"datePublished":"2026-11-09T20:45:50+11:00","dateModified":"2026-11-09T20:45:50+11:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=596138#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=596138#webpage"},"articleSection":"Barking, c2c, DP World, England, Forth Ports, GB Railfreight, Hapag-Lloyd, Infrastructure, London, London Gateway, Rail News, Tilbury, UK, RailFreight"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=596138#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=596138#listItem","name":"Barking, London: painful recovery continues"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=596138#listItem","position":3,"name":"Barking, London: painful recovery continues","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=596138\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=596138\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=10#author","url":"https:\/\/www.vibewire.com.au\/?author=10","name":"Simon Walton","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=596138#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/020b8a5d94269d301ba7cb66728514654913e0230c15145597cadc788b705bf2?s=96&d=mm&r=g","width":96,"height":96,"caption":"Simon Walton"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=596138#webpage","url":"https:\/\/www.vibewire.com.au\/?p=596138","name":"Barking, London: painful recovery continues - VibeWire Magazine","description":"Extensive infrastructure damage following the Barking derailment has left rail freight and port operators with uncertainty. Nevertheless, passenger operator c2c, also badly disrupted, says it\u2026","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=596138#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=10#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=10#author"},"datePublished":"2026-11-09T20:45:50+11:00","dateModified":"2026-11-09T20:45:50+11:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Barking, London: painful recovery continues - VibeWire Magazine","og:description":"Extensive infrastructure damage following the Barking derailment has left rail freight and port operators with uncertainty. Nevertheless, passenger operator c2c, also badly disrupted, says it\u2026","og:url":"https:\/\/www.vibewire.com.au\/?p=596138","article:published_time":"2026-11-09T09:45:50+00:00","article:modified_time":"2026-11-09T09:45:50+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Barking, London: painful recovery continues - VibeWire Magazine","twitter:description":"Extensive infrastructure damage following the Barking derailment has left rail freight and port operators with uncertainty. Nevertheless, passenger operator c2c, also badly disrupted, says it\u2026","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"596138","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-11-09 09:55:47","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2026-11-09 09:55:07","updated":"2026-11-09 09:55:47","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\tBarking, London: painful recovery continues\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au\/"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"Barking, London: painful recovery continues","link":"https:\/\/www.vibewire.com.au\/?p=596138"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/596138","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=596138"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/596138\/revisions"}],"predecessor-version":[{"id":596146,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/596138\/revisions\/596146"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=596138"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=596138"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=596138"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}