{"id":59521,"date":"2024-06-04T11:02:05","date_gmt":"2024-06-04T01:02:05","guid":{"rendered":"https:\/\/infrastructuremagazine.com.au\/?p=52371"},"modified":"2024-06-04T11:02:05","modified_gmt":"2024-06-04T01:02:05","slug":"parramatta-light-rail-stage-2-receives-2b-to-begin-construction","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=59521","title":{"rendered":"Parramatta Light Rail Stage 2 receives $2B to begin construction"},"content":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/infrastructuremagazine.com.au\/wp-content\/uploads\/2024\/06\/shutterstock_1958779351-672x448.jpg\" alt=\"\" style=\"float:right; margin:0 0 10px 10px;\"><figcaption><\/figcaption><\/figure>\n<p>Parramatta Light Rail Stage 2 is set to begin construction with a $2 billion investment from the New South Wales Government. \u00a0<br \/>\nThe investment comes as part of the 2024-25 State Budget\u00a0and\u00a0follows recent<br \/><a class=\"more-link pcm-read-more-link-custom\" href=\"https:\/\/infrastructuremagazine.com.au\/2024\/06\/04\/parramatta-light-rail-stage-2-receives-2b-to-begin-construction\/\">Read More<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/infrastructuremagazine.com.au\/wp-content\/uploads\/2024\/06\/shutterstock_1958779351-672x448.jpg\" alt=\"\"><figcaption><\/figcaption><\/figure>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[1232,471,2251,1291,1433,163,8203,5],"tags":[],"class_list":["post-59521","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-investment","category-news","category-nsw","category-projects","category-rail","category-rail-industry-news-australia-new-zealand","category-spotlight","category-transport"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/59521","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=59521"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/59521\/revisions"}],"predecessor-version":[{"id":59522,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/59521\/revisions\/59522"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=59521"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=59521"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=59521"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}