{"id":587411,"date":"2026-10-31T00:19:15","date_gmt":"2026-10-30T13:19:15","guid":{"rendered":"https:\/\/www.railfreight.com\/?p=75607"},"modified":"2026-10-31T00:19:15","modified_gmt":"2026-10-30T13:19:15","slug":"turkiye-tenders-eastern-middle-corridor-upgrade-26-fold-capacity-increase","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=587411","title":{"rendered":"T\u00fcrkiye tenders eastern Middle Corridor upgrade: 26-fold capacity increase"},"content":{"rendered":"<p><strong>T\u00fcrkiye has invited bids to rehabilitate and electrify the railway between Divri\u011fi and the Georgian border, part of its section of the Middle Corridor. The work is divided into three lots that should greatly increase capacity on the route. Proposals are due on 22 December.<\/strong><br \/>\n<span id=\"more-75607\"><\/span>T\u00fcrkiye published the <a href=\"https:\/\/www.aiib.org\/en\/projects\/details\/2026\/_download\/Turkiye\/Specific-Procurement-Notice_ETMIC-WORKS.pdf\"  rel=\"noopener\">tender notice<\/a> earlier this month. The work is part of the Eastern T\u00fcrkiye Middle Corridor Railway Development Project (ETMIC), which is financed by the World Bank and the Asian Infrastructure Investment Bank (AIIB).<\/p>\n<p>\u201cWe will rehabilitate the infrastructure and superstructure of the existing line from Divri\u011fi to the Kars border and carry out electrification and signalling works\u201d, Transport Minister Abdulkadir Uralo\u011flu is quoted as saying by Anadolu Agency. The project will strengthen east\u2013west rail links and increase the transport capacity of the <a href=\"https:\/\/railfreight.com\/railfreight\/2023\/02\/08\/ktzs-middle-corridor-volumes-more-than-doubled-in-2022\"  rel=\"noopener\">Middle Corridor<\/a>, he added.<\/p>\n<h2>Electrification all the way to Georgia<\/h2>\n<p>Lot 1 covers rehabilitation and electrification of the 156 kilometres between Divri\u011fi and Erzincan, Lot 2 the 223 kilometres between Erzincan and Erzurum. Lot 3 includes rehabilitation of the 208 kilometres from Erzurum to Kars, but electrification of the 288 kilometres from Erzurum to the Georgian border. The track works thus end at Kars, while the electrification project continues to the international border.<\/p>\n<p>The final stretch from Kars to the border is handled separately. \u201cWith the ETMIC project, we will complete the construction of the second track, as well as electrification and signalling, on the line from Kars to the Georgian border, which we recently tendered with financing from the Islamic Development Bank\u201d, Uralo\u011flu was quoted as saying in H\u00fcrriyet.<\/p>\n<p>The contracts include both the design and construction work. Winners are expected to do the design, as well as carry out the track, signalling, telecommunication and electrification works. Construction is projected to take four years.<\/p>\n<h2>From 55 to 22 hours<\/h2>\n<p>The <a href=\"https:\/\/www.worldbank.org\/en\/news\/press-release\/2024\/12\/05\/world-bank-approves-660-million-for-turkiye-to-expand-low-carbon-rail-network-to-boost-growth-and-jobs\"  rel=\"noopener\">World Bank<\/a> approved $660 million (about \u20ac593m) for the project in December 2024. The <a href=\"https:\/\/www.aiib.org\/en\/projects\/details\/2024\/approved\/eastern-turkiye-middle-corridor-railway-development-project.html\"  rel=\"noopener\">AIIB<\/a> added $250 million (about \u20ac225m), while the Islamic Development Bank and the Turkish government are also contributing. The upgraded line will replace diesel-powered trains with electric ones, the World Bank said.<\/p>\n<p>T\u00fcrkiye is hoping to achieve significant infrastructural enhancement through the project. The rail freight travel time between Divri\u011fi and the Georgian border should fall from 55 hours to 22 hours by December 2030, according to the World Bank. Over the same period, the line\u2019s maximum freight capacity should grow from 750,000 tonnes per year to 20 million tonnes per year: an increase of over 26 times.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>T\u00fcrkiye has invited bids to rehabilitate and electrify the railway between Divri\u011fi and the Georgian border, part of its section of the Middle Corridor. The\u2026<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[21477,10863,21478,343,123,471,47,8804,10387],"tags":[12634],"class_list":["post-587411","post","type-post","status-publish","format-standard","hentry","category-aiib","category-asia-europe","category-etmic","category-infrastructure","category-middle-corridor","category-news","category-rail-news","category-turkiye","category-world-bank","tag-railfreight"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.4 - aioseo.com -->\n\t<meta name=\"description\" content=\"T\u00fcrkiye has invited bids to rehabilitate and electrify the railway between Divri\u011fi and the Georgian border, part of its section of the Middle Corridor. The\u2026\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=587411\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.4\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"T\u00fcrkiye tenders eastern Middle Corridor upgrade: 26-fold capacity increase - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"T\u00fcrkiye has invited bids to rehabilitate and electrify the railway between Divri\u011fi and the Georgian border, part of its section of the Middle Corridor. The\u2026\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=587411\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-10-30T13:19:15+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-10-30T13:19:15+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"T\u00fcrkiye tenders eastern Middle Corridor upgrade: 26-fold capacity increase - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"T\u00fcrkiye has invited bids to rehabilitate and electrify the railway between Divri\u011fi and the Georgian border, part of its section of the Middle Corridor. The\u2026\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=587411#blogposting\",\"name\":\"T\\u00fcrkiye tenders eastern Middle Corridor upgrade: 26-fold capacity increase - VibeWire Magazine\",\"headline\":\"T\\u00fcrkiye tenders eastern Middle Corridor upgrade: 26-fold capacity increase\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#articleImage\",\"width\":1028,\"height\":930},\"datePublished\":\"2026-10-31T00:19:15+11:00\",\"dateModified\":\"2026-10-31T00:19:15+11:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=587411#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=587411#webpage\"},\"articleSection\":\"AIIB, Asia-Europe, ETMIC, Infrastructure, Middle Corridor, News, Rail News, T\\u00fcrkiye, World Bank, RailFreight\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=587411#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=587411#listItem\",\"name\":\"T\\u00fcrkiye tenders eastern Middle Corridor upgrade: 26-fold capacity increase\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=587411#listItem\",\"position\":3,\"name\":\"T\\u00fcrkiye tenders eastern Middle Corridor upgrade: 26-fold capacity increase\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=587411\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=587411\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=587411#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=587411#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=587411\",\"name\":\"T\\u00fcrkiye tenders eastern Middle Corridor upgrade: 26-fold capacity increase - VibeWire Magazine\",\"description\":\"T\\u00fcrkiye has invited bids to rehabilitate and electrify the railway between Divri\\u011fi and the Georgian border, part of its section of the Middle Corridor. The\\u2026\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=587411#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"datePublished\":\"2026-10-31T00:19:15+11:00\",\"dateModified\":\"2026-10-31T00:19:15+11:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>T\u00fcrkiye tenders eastern Middle Corridor upgrade: 26-fold capacity increase - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"T\u00fcrkiye tenders eastern Middle Corridor upgrade: 26-fold capacity increase - VibeWire Magazine","description":"T\u00fcrkiye has invited bids to rehabilitate and electrify the railway between Divri\u011fi and the Georgian border, part of its section of the Middle Corridor. The\u2026","canonical_url":"https:\/\/www.vibewire.com.au\/?p=587411","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=587411#blogposting","name":"T\u00fcrkiye tenders eastern Middle Corridor upgrade: 26-fold capacity increase - VibeWire Magazine","headline":"T\u00fcrkiye tenders eastern Middle Corridor upgrade: 26-fold capacity increase","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/#articleImage","width":1028,"height":930},"datePublished":"2026-10-31T00:19:15+11:00","dateModified":"2026-10-31T00:19:15+11:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=587411#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=587411#webpage"},"articleSection":"AIIB, Asia-Europe, ETMIC, Infrastructure, Middle Corridor, News, Rail News, T\u00fcrkiye, World Bank, RailFreight"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=587411#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=587411#listItem","name":"T\u00fcrkiye tenders eastern Middle Corridor upgrade: 26-fold capacity increase"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=587411#listItem","position":3,"name":"T\u00fcrkiye tenders eastern Middle Corridor upgrade: 26-fold capacity increase","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=587411\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=587411\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=587411#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=587411#webpage","url":"https:\/\/www.vibewire.com.au\/?p=587411","name":"T\u00fcrkiye tenders eastern Middle Corridor upgrade: 26-fold capacity increase - VibeWire Magazine","description":"T\u00fcrkiye has invited bids to rehabilitate and electrify the railway between Divri\u011fi and the Georgian border, part of its section of the Middle Corridor. The\u2026","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=587411#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"datePublished":"2026-10-31T00:19:15+11:00","dateModified":"2026-10-31T00:19:15+11:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"T\u00fcrkiye tenders eastern Middle Corridor upgrade: 26-fold capacity increase - VibeWire Magazine","og:description":"T\u00fcrkiye has invited bids to rehabilitate and electrify the railway between Divri\u011fi and the Georgian border, part of its section of the Middle Corridor. The\u2026","og:url":"https:\/\/www.vibewire.com.au\/?p=587411","article:published_time":"2026-10-30T13:19:15+00:00","article:modified_time":"2026-10-30T13:19:15+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"T\u00fcrkiye tenders eastern Middle Corridor upgrade: 26-fold capacity increase - VibeWire Magazine","twitter:description":"T\u00fcrkiye has invited bids to rehabilitate and electrify the railway between Divri\u011fi and the Georgian border, part of its section of the Middle Corridor. The\u2026","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"587411","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-10-30 14:06:28","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2026-10-30 14:06:07","updated":"2026-10-30 14:06:28","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\tT\u00fcrkiye tenders eastern Middle Corridor upgrade: 26-fold capacity increase\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au\/"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"T\u00fcrkiye tenders eastern Middle Corridor upgrade: 26-fold capacity increase","link":"https:\/\/www.vibewire.com.au\/?p=587411"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/587411","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=587411"}],"version-history":[{"count":0,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/587411\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=587411"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=587411"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=587411"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}