{"id":58631,"date":"2024-06-03T09:25:13","date_gmt":"2024-06-02T23:25:13","guid":{"rendered":"https:\/\/www.railexpress.com.au\/?p=116436"},"modified":"2024-06-03T09:25:13","modified_gmt":"2024-06-02T23:25:13","slug":"north-coast-trackwork-to-improve-rail-network-reliability","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=58631","title":{"rendered":"North Coast trackwork to improve rail network reliability"},"content":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/06\/AdobeStock_250998737.jpeg\" alt=\"\" style=\"float:right; margin:0 0 10px 10px;\"><figcaption>Image: totajla\/stock.adobe.com<\/figcaption><\/figure>\n<p><strong>The Australian Rail Track Corporation (<a href=\"https:\/\/www.railexpress.com.au\/artc-to-undertake-essential-hunter-valley-trackwork\/\">ARTC<\/a>) will carry out essential maintenance and improvement works next weekend along the North Coast Line between Telarah and Acacia Ridge in Queensland.<\/strong><span id=\"more-116436\"><\/span><\/p>\n<p>To enable the works the line will be closed from 6:00am Saturday 8 June to 6:00pm Monday 10 June.<\/p>\n<p>Crews will be working right along the 800km train line, investing $6 million and more than 8,000 work hours in critical maintenance. This includes re-railing, track resurfacing, mudhole removal, structure repairs, level crossing maintenance and turnout upgrades.<\/p>\n<p>Other work includes vegetation control at multiple locations and track component replacement.<\/p>\n<p>ARTC is reminding motorists and pedestrians to remain vigilant for altered traffic conditions near the rail corridor and to obey all road rules at level crossings, with rail machinery and other movements still occurring on the rail line.<\/p>\n<p>Clinton Crump, Acting ARTC Group Executive, Operations explained the importance of this work.<\/p>\n<p>\u201cThe North Coast Line is an important part of the ARTC network, and regular maintenance ensures that this corridor will continue to operate as a vital part of the economic supply chain and provide travel connections to communities,&#8221; he said.<\/p>\n<p>\u201cWith no freight or passenger trains running in this period our crews will be able to complete structural inspections and other work that is not possible when trains are running.<\/p>\n<p>\u201cARTC would like to thank the community for its patience while these critical, long-term improvements take place.\u201d<\/p>\n<p>NSW TrainLink services will be replaced by coaches. Customers are encouraged to check the <a href=\"https:\/\/transportnsw.info\/\">website<\/a> or call 13 22 32 for travel advice. Information on road closures and alternative routes can be found at\u00a0<a href=\"https:\/\/www.livetraffic.com\/\">livetraffic.com<\/a><\/p>\n<p>Up to date information regarding any changes to these works can be found on the\u00a0<a href=\"https:\/\/www.artc.com.au\/community\/track-work\/\">ARTC Trackwork website<\/a>\u00a0and for additional information community members can contact ARTC Community Line on 1300 550 402.<\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/north-coast-trackwork-to-improve-rail-network-reliability\/\">North Coast trackwork to improve rail network reliability<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/06\/AdobeStock_250998737.jpeg\" alt=\"\"><figcaption>Image: totajla\/stock.adobe.com<\/figcaption><\/figure>\n<p>The Australian Rail Track Corporation (ARTC) will carry out essential maintenance and improvement works next weekend along the North Coast \u2026 <\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/north-coast-trackwork-to-improve-rail-network-reliability\/\">North Coast trackwork to improve rail network reliability<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[170,165,166,163,58],"tags":[7465],"class_list":["post-58631","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-freight-rail","category-industry-infrastructure","category-operations-and-maintenance","category-rail-industry-news-australia-new-zealand","category-track-construction","tag-queensland"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Image: totajla\/stock.adobe.comThe Australian Rail Track Corporation (ARTC) will carry out essential maintenance and improvement works next weekend along the North Coast \u2026 The post North Coast trackwork to improve rail network reliability appeared first on Rail Express.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=58631\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"North Coast trackwork to improve rail network reliability - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Image: totajla\/stock.adobe.comThe Australian Rail Track Corporation (ARTC) will carry out essential maintenance and improvement works next weekend along the North Coast \u2026 The post North Coast trackwork to improve rail network reliability appeared first on Rail Express.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=58631\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-06-02T23:25:13+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-06-02T23:25:13+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"North Coast trackwork to improve rail network reliability - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Image: totajla\/stock.adobe.comThe Australian Rail Track Corporation (ARTC) will carry out essential maintenance and improvement works next weekend along the North Coast \u2026 The post North Coast trackwork to improve rail network reliability appeared first on Rail Express.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=58631#blogposting\",\"name\":\"North Coast trackwork to improve rail network reliability - VibeWire Magazine\",\"headline\":\"North Coast trackwork to improve rail network reliability\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1},\"datePublished\":\"2024-06-03T09:25:13+10:00\",\"dateModified\":\"2024-06-03T09:25:13+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=58631#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=58631#webpage\"},\"articleSection\":\"Freight Rail, Industry Infrastructure, Operations and Maintenance, Rail industry news (Australia, New Zealand), Track Construction, Queensland\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=58631#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=58#listItem\",\"name\":\"Track Construction\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=58#listItem\",\"position\":2,\"name\":\"Track Construction\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=58\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=58631#listItem\",\"name\":\"North Coast trackwork to improve rail network reliability\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=58631#listItem\",\"position\":3,\"name\":\"North Coast trackwork to improve rail network reliability\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=58#listItem\",\"name\":\"Track Construction\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=58631\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=58631\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=58631#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=58631#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=58631\",\"name\":\"North Coast trackwork to improve rail network reliability - VibeWire Magazine\",\"description\":\"Image: totajla\\\/stock.adobe.comThe Australian Rail Track Corporation (ARTC) will carry out essential maintenance and improvement works next weekend along the North Coast \\u2026 The post North Coast trackwork to improve rail network reliability appeared first on Rail Express.\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=58631#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1,\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=58631\\\/#mainImage\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=58631#mainImage\"},\"datePublished\":\"2024-06-03T09:25:13+10:00\",\"dateModified\":\"2024-06-03T09:25:13+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>North Coast trackwork to improve rail network reliability - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"North Coast trackwork to improve rail network reliability - VibeWire Magazine","description":"Image: totajla\/stock.adobe.comThe Australian Rail Track Corporation (ARTC) will carry out essential maintenance and improvement works next weekend along the North Coast \u2026 The post North Coast trackwork to improve rail network reliability appeared first on Rail Express.","canonical_url":"https:\/\/www.vibewire.com.au\/?p=58631","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=58631#blogposting","name":"North Coast trackwork to improve rail network reliability - VibeWire Magazine","headline":"North Coast trackwork to improve rail network reliability","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":1},"datePublished":"2024-06-03T09:25:13+10:00","dateModified":"2024-06-03T09:25:13+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=58631#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=58631#webpage"},"articleSection":"Freight Rail, Industry Infrastructure, Operations and Maintenance, Rail industry news (Australia, New Zealand), Track Construction, Queensland"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=58631#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=58#listItem","name":"Track Construction"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=58#listItem","position":2,"name":"Track Construction","item":"https:\/\/www.vibewire.com.au\/?cat=58","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=58631#listItem","name":"North Coast trackwork to improve rail network reliability"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=58631#listItem","position":3,"name":"North Coast trackwork to improve rail network reliability","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=58#listItem","name":"Track Construction"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=58631\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=58631\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=58631#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=58631#webpage","url":"https:\/\/www.vibewire.com.au\/?p=58631","name":"North Coast trackwork to improve rail network reliability - VibeWire Magazine","description":"Image: totajla\/stock.adobe.comThe Australian Rail Track Corporation (ARTC) will carry out essential maintenance and improvement works next weekend along the North Coast \u2026 The post North Coast trackwork to improve rail network reliability appeared first on Rail Express.","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=58631#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"image":{"@type":"ImageObject","url":1,"@id":"https:\/\/www.vibewire.com.au\/?p=58631\/#mainImage"},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=58631#mainImage"},"datePublished":"2024-06-03T09:25:13+10:00","dateModified":"2024-06-03T09:25:13+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"North Coast trackwork to improve rail network reliability - VibeWire Magazine","og:description":"Image: totajla\/stock.adobe.comThe Australian Rail Track Corporation (ARTC) will carry out essential maintenance and improvement works next weekend along the North Coast \u2026 The post North Coast trackwork to improve rail network reliability appeared first on Rail Express.","og:url":"https:\/\/www.vibewire.com.au\/?p=58631","article:published_time":"2024-06-02T23:25:13+00:00","article:modified_time":"2024-06-02T23:25:13+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"North Coast trackwork to improve rail network reliability - VibeWire Magazine","twitter:description":"Image: totajla\/stock.adobe.comThe Australian Rail Track Corporation (ARTC) will carry out essential maintenance and improvement works next weekend along the North Coast \u2026 The post North Coast trackwork to improve rail network reliability appeared first on Rail Express.","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"58631","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2025-08-22 22:17:27","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-06-03 00:41:47","updated":"2025-08-22 22:17:27"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=58\" title=\"Track Construction\">Track Construction<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tNorth Coast trackwork to improve rail network reliability\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Track Construction","link":"https:\/\/www.vibewire.com.au\/?cat=58"},{"label":"North Coast trackwork to improve rail network reliability","link":"https:\/\/www.vibewire.com.au\/?p=58631"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/58631","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=58631"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/58631\/revisions"}],"predecessor-version":[{"id":58632,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/58631\/revisions\/58632"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=58631"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=58631"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=58631"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}