{"id":5825,"date":"2024-01-26T23:00:00","date_gmt":"2024-01-26T13:00:00","guid":{"rendered":"http:\/\/www.vibewire.com.au\/?guid=1b4965b148e8d1e894e4c821d23ffb28"},"modified":"2024-01-26T23:00:00","modified_gmt":"2024-01-26T13:00:00","slug":"wokingham-to-see-diversions-for-motorists-starting-today-26th-jan-as-network-rail-carries-out-reliability-upgrades-2","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=5825","title":{"rendered":"Wokingham to see diversions for motorists starting today (26th Jan) as Network Rail carries out reliability upgrades"},"content":{"rendered":"<p><img width=\"1080\" height=\"720\" src=\"https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2024\/01\/Arial-view-of-Star-Lane-level-crossing-900x600-c-1080x720.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"Arial view of Star Lane level crossing\" style=\"display: block; margin: auto; margin-bottom: 10px; max-width: 100%;\" decoding=\"async\" loading=\"lazy\" \/>Level crossings at Wokingham station and Easthampstead Road (Star Lane) will be temporarily closed whilst the upgrade work takes place<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Level crossings at Wokingham station and Easthampstead Road (Star Lane) will be temporarily closed whilst the upgrade work takes place<\/p>\n","protected":false},"author":13,"featured_media":12803,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[2416,2417,2418,2392,2419,2420,2306,2421,2422,2423,343,2424,113,2425,2307,2426,2427,2428,2429,2430,2431,2432],"tags":[],"class_list":["post-5825","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aldershot","category-ascot","category-bracknell","category-disruption","category-feltham","category-gatwick-airport","category-great-western-railway","category-guildford","category-half-term","category-hounslow","category-infrastructure","category-level-crossing","category-network-rail","category-north-downs-line","category-reading","category-resignalling","category-shepperton","category-south-western-railway","category-twickenham","category-weybridge","category-windsor","category-wokingham"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/5825","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5825"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/5825\/revisions"}],"predecessor-version":[{"id":5826,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/5825\/revisions\/5826"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/media\/12803"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5825"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5825"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5825"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}