{"id":580608,"date":"2026-10-19T17:00:00","date_gmt":"2026-10-19T07:00:00","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=580608"},"modified":"2026-10-19T14:40:12","modified_gmt":"2026-10-19T04:40:12","slug":"nextdc-shares-halted-as-power-delays-and-community-pushback-hit-west-footscray-data-centre","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=580608","title":{"rendered":"NextDC Shares Halted as Power Delays and Community Pushback Hit West Footscray Data Centre"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Australia\u2019s largest listed data centre developer, <a href=\"https:\/\/www.vibewire.com.au\/?tag=nextdc\" target=\"_blank\" rel=\"noopener\">NextDC<\/a>, has <a href=\"https:\/\/www.vibewire.com.au\/?p=580438\" target=\"_blank\" rel=\"noopener\">requested an immediate trading halt for its ASX-listed shares<\/a>, warning investors that critical power supply delays at its flagship <a href=\"https:\/\/www.vibewire.com.au\/?tag=m3-data-centre\" target=\"_blank\" rel=\"noopener\">M3<\/a> facility in West Footscray will impact its development and potentially affect its FY27 financial guidance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">While NextDC\u2019s exchange filing\u2014signed by company secretary Michael Helmer\u2014did not explicitly state the root cause of the delay, market analysts point directly to an intense <a href=\"https:\/\/www.vibewire.com.au\/?p=556717\" target=\"_blank\" rel=\"noopener\">community blockade in Melbourne&#8217;s inner-west last month<\/a>. That grassroots action successfully stalled a multi-million-dollar high-voltage power line expansion project by electricity distributor Jemena.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Grid Constraints Meet Grassroots Resistance<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The M3 campus\u2014designed to span a 10-hectare industrial site directly adjacent to residential homes\u2014is currently undergoing a $750 million expansion from its existing 5 hectares. However, feeding the power-hungry artificial intelligence infrastructure required network operator Jemena to replace standard wooden poles with towering 15-metre concrete structures carrying 66,000 volts down residential streets in West Footscray and neighbouring Yarraville.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The rollout ground to a halt last month when local residents launched direct action, blockading contractor trucks with parked cars, ignoring door-knocks, and filling excavation pits to stop high-voltage lines from reaching the NextDC site. Bowing to public pressure, Jemena paused work in Yarraville to allow for community consultation, leaving the high-capacity energy route unfinished\u2014though many of the high-voltage poles through West Footscray had already been erected.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Political and Market Fallout<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Neither Jemena nor NextDC has formally confirmed that the power pole pause directly caused the supply bottleneck. However, Citigroup analyst Siraj Ahmed confirmed in a client briefing that the trading halt is heavily linked to Jemena&#8217;s suspension of the infrastructure project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The crisis marks a critical turning point, serving as the clearest evidence yet that Victoria&#8217;s rapid push to attract energy-intensive artificial intelligence infrastructure is colliding head-on with severe grid constraints and local suburban resistance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The standoff also presents a major political headache for the government heading into the November state election, as leaders attempt to balance the aggressive pursuit of international tech investment against rising community pushback over data centre footprints.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">NextDC&#8217;s trading halt will remain in place until Wednesday or until a full market update is released.<sup><\/sup><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Neither Jemena nor NextDC has formally confirmed that the power pole pause directly caused the supply bottleneck. However, Citigroup analyst Siraj Ahmed confirmed in a client briefing that the trading halt is heavily linked to Jemena&#8217;s suspension of the infrastructure project.<\/p>\n","protected":false},"author":22,"featured_media":556725,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[18607,35,12785],"tags":[993,17789],"class_list":["post-580608","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ai-news","category-breaking-news","category-data-centre","tag-melbourne","tag-nextdc"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.3 - aioseo.com -->\n\t<meta name=\"description\" content=\"Neither Jemena nor NextDC has formally confirmed that the power pole pause directly caused the supply bottleneck. However, Citigroup analyst Siraj Ahmed confirmed in a client briefing that the trading halt is heavily linked to Jemena&#039;s suspension of the infrastructure project.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Helen Carrie\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=580608\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.3\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"NextDC Shares Halted as Power Delays and Community Pushback Hit West Footscray Data Centre\" \/>\n\t\t<meta property=\"og:description\" content=\"Neither Jemena nor NextDC has formally confirmed that the power pole pause directly caused the supply bottleneck. However, Citigroup analyst Siraj Ahmed confirmed in a client briefing that the trading halt is heavily linked to Jemena&#039;s suspension of the infrastructure project.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=580608\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/09\/Image-5.jpeg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/09\/Image-5.jpeg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"862\" \/>\n\t\t<meta property=\"og:image:height\" content=\"575\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-10-19T07:00:00+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-10-19T04:40:12+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"NextDC Shares Halted as Power Delays and Community Pushback Hit West Footscray Data Centre\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Neither Jemena nor NextDC has formally confirmed that the power pole pause directly caused the supply bottleneck. However, Citigroup analyst Siraj Ahmed confirmed in a client briefing that the trading halt is heavily linked to Jemena&#039;s suspension of the infrastructure project.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/09\/Image-5.jpeg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=580608#blogposting\",\"name\":\"NextDC Shares Halted as Power Delays and Community Pushback Hit West Footscray Data Centre\",\"headline\":\"NextDC Shares Halted as Power Delays and Community Pushback Hit West Footscray Data Centre\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=22#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Image-5.jpeg\",\"width\":862,\"height\":575},\"datePublished\":\"2026-10-19T17:00:00+10:00\",\"dateModified\":\"2026-10-19T14:40:12+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=580608#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=580608#webpage\"},\"articleSection\":\"AI News, Breaking News, Data Centre, Melbourne, NextDC\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=580608#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=35#listItem\",\"name\":\"Breaking News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=35#listItem\",\"position\":2,\"name\":\"Breaking News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=35\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=580608#listItem\",\"name\":\"NextDC Shares Halted as Power Delays and Community Pushback Hit West Footscray Data Centre\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=580608#listItem\",\"position\":3,\"name\":\"NextDC Shares Halted as Power Delays and Community Pushback Hit West Footscray Data Centre\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=35#listItem\",\"name\":\"Breaking News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=580608\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=580608\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=22#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=22\",\"name\":\"Helen Carrie\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=580608#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8fa4504f646d6c3563fb762351857160e1b5e98f05880587b518a4ffe18cc9bc?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Helen Carrie\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=580608#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=580608\",\"name\":\"NextDC Shares Halted as Power Delays and Community Pushback Hit West Footscray Data Centre\",\"description\":\"Neither Jemena nor NextDC has formally confirmed that the power pole pause directly caused the supply bottleneck. However, Citigroup analyst Siraj Ahmed confirmed in a client briefing that the trading halt is heavily linked to Jemena's suspension of the infrastructure project.\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=580608#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=22#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=22#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Image-5.jpeg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=580608\\\/#mainImage\",\"width\":862,\"height\":575},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=580608#mainImage\"},\"datePublished\":\"2026-10-19T17:00:00+10:00\",\"dateModified\":\"2026-10-19T14:40:12+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>NextDC Shares Halted as Power Delays and Community Pushback Hit West Footscray Data Centre<\/title>\n\n","aioseo_head_json":{"title":"NextDC Shares Halted as Power Delays and Community Pushback Hit West Footscray Data Centre","description":"Neither Jemena nor NextDC has formally confirmed that the power pole pause directly caused the supply bottleneck. However, Citigroup analyst Siraj Ahmed confirmed in a client briefing that the trading halt is heavily linked to Jemena's suspension of the infrastructure project.","canonical_url":"https:\/\/www.vibewire.com.au\/?p=580608","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=580608#blogposting","name":"NextDC Shares Halted as Power Delays and Community Pushback Hit West Footscray Data Centre","headline":"NextDC Shares Halted as Power Delays and Community Pushback Hit West Footscray Data Centre","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=22#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/09\/Image-5.jpeg","width":862,"height":575},"datePublished":"2026-10-19T17:00:00+10:00","dateModified":"2026-10-19T14:40:12+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=580608#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=580608#webpage"},"articleSection":"AI News, Breaking News, Data Centre, Melbourne, NextDC"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=580608#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=35#listItem","name":"Breaking News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=35#listItem","position":2,"name":"Breaking News","item":"https:\/\/www.vibewire.com.au\/?cat=35","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=580608#listItem","name":"NextDC Shares Halted as Power Delays and Community Pushback Hit West Footscray Data Centre"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=580608#listItem","position":3,"name":"NextDC Shares Halted as Power Delays and Community Pushback Hit West Footscray Data Centre","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=35#listItem","name":"Breaking News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=580608\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=580608\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=22#author","url":"https:\/\/www.vibewire.com.au\/?author=22","name":"Helen Carrie","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=580608#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/8fa4504f646d6c3563fb762351857160e1b5e98f05880587b518a4ffe18cc9bc?s=96&d=mm&r=g","width":96,"height":96,"caption":"Helen Carrie"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=580608#webpage","url":"https:\/\/www.vibewire.com.au\/?p=580608","name":"NextDC Shares Halted as Power Delays and Community Pushback Hit West Footscray Data Centre","description":"Neither Jemena nor NextDC has formally confirmed that the power pole pause directly caused the supply bottleneck. However, Citigroup analyst Siraj Ahmed confirmed in a client briefing that the trading halt is heavily linked to Jemena's suspension of the infrastructure project.","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=580608#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=22#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=22#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/09\/Image-5.jpeg","@id":"https:\/\/www.vibewire.com.au\/?p=580608\/#mainImage","width":862,"height":575},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=580608#mainImage"},"datePublished":"2026-10-19T17:00:00+10:00","dateModified":"2026-10-19T14:40:12+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"NextDC Shares Halted as Power Delays and Community Pushback Hit West Footscray Data Centre","og:description":"Neither Jemena nor NextDC has formally confirmed that the power pole pause directly caused the supply bottleneck. However, Citigroup analyst Siraj Ahmed confirmed in a client briefing that the trading halt is heavily linked to Jemena's suspension of the infrastructure project.","og:url":"https:\/\/www.vibewire.com.au\/?p=580608","og:image":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/09\/Image-5.jpeg","og:image:secure_url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/09\/Image-5.jpeg","og:image:width":"862","og:image:height":"575","article:published_time":"2026-10-19T07:00:00+00:00","article:modified_time":"2026-10-19T04:40:12+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"NextDC Shares Halted as Power Delays and Community Pushback Hit West Footscray Data Centre","twitter:description":"Neither Jemena nor NextDC has formally confirmed that the power pole pause directly caused the supply bottleneck. However, Citigroup analyst Siraj Ahmed confirmed in a client briefing that the trading halt is heavily linked to Jemena's suspension of the infrastructure project.","twitter:creator":"@VibewireCentral","twitter:image":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/09\/Image-5.jpeg"},"aioseo_meta_data":{"post_id":"580608","title":"#post_title","description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"M3 Data Centre","score":0,"analysis":[]},"additional":[{"keyphrase":"NextDC","score":0},{"keyphrase":"Melbourne","score":0},{"keyphrase":"ASX","score":0},{"keyphrase":"Jemena","score":0}]},"primary_term":null,"canonical_url":null,"og_title":"#post_title","og_description":"#post_excerpt","og_object_type":"default","og_image_type":"featured","og_image_url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/09\/Image-5.jpeg","og_image_width":"862","og_image_height":"575","og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":true,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"seo_analyzer_scan_date":"2026-10-19 07:02:56","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-10-19 04:07:37","updated":"2026-10-19 07:02:56","focus_keyword":"M3 Data Centre","additional_keywords":[{"word":"NextDC","score":89,"items":{"introductionKeyword":{"score":9},"keyphraseLength":{"score":9},"keyphraseDensity":{"score":9},"functionWordsInKeyphrase":{"score":9},"textCompetingLinks":{"score":9},"imageKeyphrase":{"score":3}}},{"word":"Melbourne","score":69,"items":{"introductionKeyword":{"score":3},"keyphraseLength":{"score":9},"keyphraseDensity":{"score":4},"functionWordsInKeyphrase":{"score":9},"textCompetingLinks":{"score":9},"imageKeyphrase":{"score":3}}},{"word":"ASX","score":80,"items":{"introductionKeyword":{"score":9},"keyphraseLength":{"score":9},"keyphraseDensity":{"score":4},"functionWordsInKeyphrase":{"score":9},"textCompetingLinks":{"score":9},"imageKeyphrase":{"score":3}}},{"word":"Jemena","score":78,"items":{"introductionKeyword":{"score":3},"keyphraseLength":{"score":9},"keyphraseDensity":{"score":9},"functionWordsInKeyphrase":{"score":9},"textCompetingLinks":{"score":9},"imageKeyphrase":{"score":3}}}],"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=35\" title=\"Breaking News\">Breaking News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\tNextDC Shares Halted as Power Delays and Community Pushback Hit West Footscray Data Centre\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au\/"},{"label":"Breaking News","link":"https:\/\/www.vibewire.com.au\/?cat=35"},{"label":"NextDC Shares Halted as Power Delays and Community Pushback Hit West Footscray Data Centre","link":"https:\/\/www.vibewire.com.au\/?p=580608"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/580608","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=580608"}],"version-history":[{"count":3,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/580608\/revisions"}],"predecessor-version":[{"id":580611,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/580608\/revisions\/580611"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/media\/556725"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=580608"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=580608"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=580608"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}