{"id":580426,"date":"2026-10-19T12:56:53","date_gmt":"2026-10-19T02:56:53","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=580426"},"modified":"2026-10-19T12:56:57","modified_gmt":"2026-10-19T02:56:57","slug":"nextdc-warns-of-melbourne-m3-data-centre-delay-due-to-power-supply-crunch","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=580426","title":{"rendered":"NextDC warns of Melbourne M3 data centre delay due to power supply crunch"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">NextDC announced on Monday that power supply delays have hit its controversial M3 data centre expansion in Melbourne, prompting a temporary halt in the company&#8217;s share trading pending an evaluation of the financial impact.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Situated in West Footscray just 15 metres from residential properties, the M3 facility\u2014which supports artificial intelligence workloads\u2014has previously drawn scrutiny from local residents regarding noise and emissions. Currently, the ASX-listed data centre operator has established 42 megawatts of operational power capacity at the site, with plans to scale production up to 225 megawatts by late 2027.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">During its August financial results presentation, NextDC assured investors that the development of an additional 165 megawatts remained on schedule. The facility hosts key infrastructure for Nasdaq-listed customer CoreWeave (via Sharon AI), which is constructing an advanced Nvidia chip cluster to deliver client processing capabilities.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Barrenjoey analyst Eric Choi noted that up to 220 megawatts of capacity at the M3 site could face delays, highlighting broader industry challenges concerning power consumption and the social license required to operate large-scale data facilities.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Power supplies to NextDC\u2019s controversial M3 data centre expansion in Melbourne had been delayed, the developer said on Monday, as trading in its shares was halted pending an update on the potential hit to its balance sheet.<\/p>\n","protected":false},"author":90574,"featured_media":378951,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[35,12785],"tags":[993,17789],"class_list":["post-580426","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-breaking-news","category-data-centre","tag-melbourne","tag-nextdc"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.3 - aioseo.com -->\n\t<meta name=\"description\" content=\"Power supplies to NextDC\u2019s controversial M3 data centre expansion in Melbourne had been delayed, the developer said on Monday, as trading in its shares was halted pending an update on the potential hit to its balance sheet.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Telco Analyst\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=580426\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.3\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"NextDC warns of Melbourne M3 data centre delay due to power supply crunch\" \/>\n\t\t<meta property=\"og:description\" content=\"Power supplies to NextDC\u2019s controversial M3 data centre expansion in Melbourne had been delayed, the developer said on Monday, as trading in its shares was halted pending an update on the potential hit to its balance sheet.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=580426\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/03\/image_2026-03-02_203308839-e1788136492891.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/03\/image_2026-03-02_203308839-e1788136492891.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"900\" \/>\n\t\t<meta property=\"og:image:height\" content=\"506\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-10-19T02:56:53+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-10-19T02:56:57+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"NextDC warns of Melbourne M3 data centre delay due to power supply crunch\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Power supplies to NextDC\u2019s controversial M3 data centre expansion in Melbourne had been delayed, the developer said on Monday, as trading in its shares was halted pending an update on the potential hit to its balance sheet.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/03\/image_2026-03-02_203308839-e1788136492891.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=580426#blogposting\",\"name\":\"NextDC warns of Melbourne M3 data centre delay due to power supply crunch\",\"headline\":\"NextDC warns of Melbourne M3 data centre delay due to power supply crunch\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=90574#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/image_2026-03-02_203308839-e1788136492891.png\",\"width\":900,\"height\":506},\"datePublished\":\"2026-10-19T12:56:53+10:00\",\"dateModified\":\"2026-10-19T12:56:57+10:00\",\"inLanguage\":\"en-AU\",\"commentCount\":2,\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=580426#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=580426#webpage\"},\"articleSection\":\"Breaking News, Data Centre, Melbourne, NextDC\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=580426#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=35#listItem\",\"name\":\"Breaking News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=35#listItem\",\"position\":2,\"name\":\"Breaking News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=35\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=580426#listItem\",\"name\":\"NextDC warns of Melbourne M3 data centre delay due to power supply crunch\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=580426#listItem\",\"position\":3,\"name\":\"NextDC warns of Melbourne M3 data centre delay due to power supply crunch\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=35#listItem\",\"name\":\"Breaking News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=580426\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=580426\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=90574#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=90574\",\"name\":\"Telco Analyst\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=580426#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/223a29ff455a766a9ceca4c2dc0352aa8baef27c37eba4cf388f9d8bb7abff7e?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Telco Analyst\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=580426#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=580426\",\"name\":\"NextDC warns of Melbourne M3 data centre delay due to power supply crunch\",\"description\":\"Power supplies to NextDC\\u2019s controversial M3 data centre expansion in Melbourne had been delayed, the developer said on Monday, as trading in its shares was halted pending an update on the potential hit to its balance sheet.\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=580426#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=90574#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=90574#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/image_2026-03-02_203308839-e1788136492891.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=580426\\\/#mainImage\",\"width\":900,\"height\":506},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=580426#mainImage\"},\"datePublished\":\"2026-10-19T12:56:53+10:00\",\"dateModified\":\"2026-10-19T12:56:57+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>NextDC warns of Melbourne M3 data centre delay due to power supply crunch<\/title>\n\n","aioseo_head_json":{"title":"NextDC warns of Melbourne M3 data centre delay due to power supply crunch","description":"Power supplies to NextDC\u2019s controversial M3 data centre expansion in Melbourne had been delayed, the developer said on Monday, as trading in its shares was halted pending an update on the potential hit to its balance sheet.","canonical_url":"https:\/\/www.vibewire.com.au\/?p=580426","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=580426#blogposting","name":"NextDC warns of Melbourne M3 data centre delay due to power supply crunch","headline":"NextDC warns of Melbourne M3 data centre delay due to power supply crunch","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=90574#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/03\/image_2026-03-02_203308839-e1788136492891.png","width":900,"height":506},"datePublished":"2026-10-19T12:56:53+10:00","dateModified":"2026-10-19T12:56:57+10:00","inLanguage":"en-AU","commentCount":2,"mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=580426#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=580426#webpage"},"articleSection":"Breaking News, Data Centre, Melbourne, NextDC"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=580426#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=35#listItem","name":"Breaking News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=35#listItem","position":2,"name":"Breaking News","item":"https:\/\/www.vibewire.com.au\/?cat=35","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=580426#listItem","name":"NextDC warns of Melbourne M3 data centre delay due to power supply crunch"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=580426#listItem","position":3,"name":"NextDC warns of Melbourne M3 data centre delay due to power supply crunch","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=35#listItem","name":"Breaking News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=580426\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=580426\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=90574#author","url":"https:\/\/www.vibewire.com.au\/?author=90574","name":"Telco Analyst","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=580426#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/223a29ff455a766a9ceca4c2dc0352aa8baef27c37eba4cf388f9d8bb7abff7e?s=96&d=mm&r=g","width":96,"height":96,"caption":"Telco Analyst"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=580426#webpage","url":"https:\/\/www.vibewire.com.au\/?p=580426","name":"NextDC warns of Melbourne M3 data centre delay due to power supply crunch","description":"Power supplies to NextDC\u2019s controversial M3 data centre expansion in Melbourne had been delayed, the developer said on Monday, as trading in its shares was halted pending an update on the potential hit to its balance sheet.","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=580426#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=90574#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=90574#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/03\/image_2026-03-02_203308839-e1788136492891.png","@id":"https:\/\/www.vibewire.com.au\/?p=580426\/#mainImage","width":900,"height":506},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=580426#mainImage"},"datePublished":"2026-10-19T12:56:53+10:00","dateModified":"2026-10-19T12:56:57+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"NextDC warns of Melbourne M3 data centre delay due to power supply crunch","og:description":"Power supplies to NextDC\u2019s controversial M3 data centre expansion in Melbourne had been delayed, the developer said on Monday, as trading in its shares was halted pending an update on the potential hit to its balance sheet.","og:url":"https:\/\/www.vibewire.com.au\/?p=580426","og:image":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/03\/image_2026-03-02_203308839-e1788136492891.png","og:image:secure_url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/03\/image_2026-03-02_203308839-e1788136492891.png","og:image:width":"900","og:image:height":"506","article:published_time":"2026-10-19T02:56:53+00:00","article:modified_time":"2026-10-19T02:56:57+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"NextDC warns of Melbourne M3 data centre delay due to power supply crunch","twitter:description":"Power supplies to NextDC\u2019s controversial M3 data centre expansion in Melbourne had been delayed, the developer said on Monday, as trading in its shares was halted pending an update on the potential hit to its balance sheet.","twitter:creator":"@VibewireCentral","twitter:image":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/03\/image_2026-03-02_203308839-e1788136492891.png"},"aioseo_meta_data":{"post_id":"580426","title":"#post_title","description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"NextDC","score":0,"analysis":[]},"additional":[{"keyphrase":"Melbourne","score":0},{"keyphrase":"M3 Data Centre","score":0},{"keyphrase":"Eric Choi","score":0},{"keyphrase":"Core Weave","score":0}]},"primary_term":null,"canonical_url":null,"og_title":"#post_title","og_description":"#post_excerpt","og_object_type":"default","og_image_type":"featured","og_image_url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/03\/image_2026-03-02_203308839-e1788136492891.png","og_image_width":"900","og_image_height":"506","og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":true,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"seo_analyzer_scan_date":"2026-10-19 02:59:47","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-10-19 02:08:36","updated":"2026-10-19 02:59:47","focus_keyword":"NextDC","additional_keywords":[{"word":"Melbourne","score":80,"items":{"introductionKeyword":{"score":9},"keyphraseLength":{"score":9},"keyphraseDensity":{"score":4},"functionWordsInKeyphrase":{"score":9},"textCompetingLinks":{"score":9},"imageKeyphrase":{"score":3}}},{"word":"M3 Data Centre","score":80,"items":{"introductionKeyword":{"score":9},"keyphraseLength":{"score":9},"keyphraseDensity":{"score":4},"functionWordsInKeyphrase":{"score":9},"textCompetingLinks":{"score":9},"imageKeyphrase":{"score":3}}},{"word":"Eric Choi","score":69,"items":{"introductionKeyword":{"score":3},"keyphraseLength":{"score":9},"keyphraseDensity":{"score":4},"functionWordsInKeyphrase":{"score":9},"textCompetingLinks":{"score":9},"imageKeyphrase":{"score":3}}},{"word":"Core Weave","score":69,"items":{"introductionKeyword":{"score":3},"keyphraseLength":{"score":9},"keyphraseDensity":{"score":4},"functionWordsInKeyphrase":{"score":9},"textCompetingLinks":{"score":9},"imageKeyphrase":{"score":3}}}],"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=35\" title=\"Breaking News\">Breaking News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\tNextDC warns of Melbourne M3 data centre delay due to power supply crunch\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au\/"},{"label":"Breaking News","link":"https:\/\/www.vibewire.com.au\/?cat=35"},{"label":"NextDC warns of Melbourne M3 data centre delay due to power supply crunch","link":"https:\/\/www.vibewire.com.au\/?p=580426"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/580426","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/90574"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=580426"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/580426\/revisions"}],"predecessor-version":[{"id":580428,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/580426\/revisions\/580428"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/media\/378951"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=580426"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=580426"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=580426"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}