{"id":577359,"date":"2026-10-14T19:50:50","date_gmt":"2026-10-14T09:50:50","guid":{"rendered":"https:\/\/www.railfreight.com\/?p=75028"},"modified":"2026-10-14T19:50:50","modified_gmt":"2026-10-14T09:50:50","slug":"egypt-plans-new-corridors-to-create-a-suez-canal-on-rails","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=577359","title":{"rendered":"Egypt plans new corridors to create a \u2018Suez Canal on rails\u2019"},"content":{"rendered":"<p><strong>Egypt has begun building eight logistics corridors linking the Red Sea and the Mediterranean in an attempt to turn into a global hub. Rail is a key part of the initiative and gathered significant international support, especially from countries in eastern Africa.<\/strong><br \/>\n<span id=\"more-75028\"><\/span>\u201cIn addition to implementing giant national projects within the framework of planning and establishing 8 integrated international development logistics corridors with the aim of transforming Egypt into a regional centre for transport, logistics and transit trade,\u201d Egypt\u2019s Minister of Transport, Lieutenant General Engineer Kamel El-Wazir, said at the beginning of the month.<\/p>\n<p>Tellingly, the remarks were made in front of Egypt\u2019s President Abdel Fattah El-Sisi, and what the ministry referred to as \u201ca number of heads of brotherly and friendly African states.\u201d The eight logistics corridors have both top-level political domestic support and African markets in their sights with regular references to East Africa and the Nile Basin countries.<\/p>\n<h2>The eight corridors<\/h2>\n<p>The government sees the corridors as not only moving goods across Egypt and onwards \u2013 thereby easing pressure on the Suez Canal \u2013 but to linking the country\u2019s industrial, agricultural, and mining areas with maritime ports on the Red Sea and Mediterranean, Prime Minister Mostafa Madbouly said.<\/p>\n<p>&#8220;We want corridors that link the farm to the factory, the factory to the port, and the port to the markets; that connect cities with energy, production with finance, and markets with producers; and that allow landlocked countries and coastal countries able to benefit from continental economic integration,&#8221; Madbouly said via the MENA news agency.<\/p>\n<p>Madbouly also called for the corridors to be digital and use single-window systems, and affirmed Egypt&#8217;s readiness to collaborate with African nations and other partners to turn them into drivers of continental integration and prosperity, the MENA report added. &#8220;Our vision in Egypt is that corridors should be corridors for development before they are corridors for transport,&#8221; Madbouly added.<\/p>\n<div style=\"border: 2px solid #0a4e7f; padding: 15px 20px 20px 20px; border-radius: 10px; background-color: #e7f1f8; margin: 20px 0;\">\n<p><strong>The eight major corridors linking production zones with seaports are<\/strong><\/p>\n<ul style=\"margin-top: 10px; padding-left: 20px; list-style-type: disc;\">\n<li>Al-Arish \u2013 Taba<\/li>\n<li>Sokhna \u2013 Alexandria<\/li>\n<li>Cairo \u2013 Alexandria \u2013 Abu Tartour<\/li>\n<li>Tanta \u2013 Mansoura \u2013 Damietta<\/li>\n<li>Jargoub \u2013 Salloum<\/li>\n<li>Safaga \u2013 Qena \u2013 Abu Tartour<\/li>\n<li>Cairo \u2013 Aswan \u2013 Abu Simbel (running to Sudan)<\/li>\n<li>Bernice \u2013 Aswan \u2013 Toshka \u2013 East Oweinat \u2013 Kufra (Lybia) \u2013 N&#8217;Djamena (Chad) \u2013 Douala (Cameroon)<\/li>\n<\/ul>\n<p><strong>The last two are the most important ones as they connect to other countries according to the ministry.<\/strong><\/p>\n<\/div>\n<h2>Supporting infrastructure<\/h2>\n<p>What will help Egypt as an exporter and a transit zone are the plans for an extensive ecosystem supporting it. A comprehensive plan has been implemented to develop the rolling stock fleet, infrastructure, signaling and control systems, production workshops and human resources, to raise the levels of safety, efficiency and quality of service, while increasing the capacity to transport passengers and goods, the ministry added.<\/p>\n<p>Helping Egypt\u2019s role as exporter and transit country is extensive development of the port infrastructure. This includes the establishment of multi-purpose terminals, and the deepening of berths for 19 ports, five of which will be new. This is in parallel with the establishment and development of land and dry ports and logistics zones, with a total of nine border crossings, 33 dry ports and logistics zones across the country.<\/p>\n<figure class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"fluid wp-image-75038 size-full\" src=\"https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/10\/shutterstock_605605712-scaled.jpg\" alt=\"Alexandria is Egypt's largest port. Image: Shutterstock \u00a9 GTS Productions\" width=\"2560\" height=\"1707\" srcset=\"https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/10\/shutterstock_605605712-scaled.jpg 2560w, https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/10\/shutterstock_605605712-336x224.jpg 336w, https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/10\/shutterstock_605605712-480x320.jpg 480w, https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/10\/shutterstock_605605712-768x512.jpg 768w, https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/10\/shutterstock_605605712-1536x1024.jpg 1536w, https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/10\/shutterstock_605605712-2048x1365.jpg 2048w, https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/10\/shutterstock_605605712-1024x683.jpg 1024w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><figcaption class=\"wp-caption-text\">Alexandria is Egypt&#8217;s largest port. Image: Shutterstock \u00a9 GTS Productions<\/figcaption><\/figure>\n<h2>High-speed freight?<\/h2>\n<p>What is catching the interest of many in the logistics sector is the freight component in Egypt\u2019s development of high-speed rail, which is planning is to build four lines. The first line (Sokhna \u2013 El Alamein \u2013 Marsa Matrouh) would be 660 km long with 21 stations and a control center.<\/p>\n<p>Its assets will include 14 freight locomotives and around 50 passenger trains, according to the National Authority for Tunnels, responsible for the project. Transport Minister El-Wazir was much more candid, saying that the first line of this network, connecting the Red Sea and the Mediterranean by land, was like \u201ccreating a new Suez Canal on rails\u201d.<\/p>\n<p>The second line will connect Greater Cairo to Abu Simbel, on the way to Sudan. This will be some 1,100 kilometres length and will have some forty freight locomotives on it. By contrast, the third route will be an east-west service linking the ports of Hurghada and Safaga on the Red Sea with Luxor, along the Nile. It will have some 20 freight locomotives.<\/p>\n<aside class=\"readmore\">\n<div class=\"readmore-item\"><a href=\"https:\/\/www.railfreight.com\/infrastructure\/2025\/09\/08\/egypt-plans-to-boost-its-rail-freight-capacity-by-46\/\"><img decoding=\"async\" src=\"https:\/\/www.railfreight.com\/wp-content\/uploads\/2025\/09\/shutterstock_2398066853-128x128.jpg\" alt=\"\" class=\"readmore-thumbnail\" \/><\/a><\/p>\n<div class=\"readmore-info\"><a href=\"https:\/\/www.railfreight.com\/infrastructure\/2025\/09\/08\/egypt-plans-to-boost-its-rail-freight-capacity-by-46\/\" class=\"readmore-title\">Egypt plans to boost its rail freight capacity by 46%<\/a><\/div>\n<\/div>\n<\/aside>\n<h2>Untapped markets<\/h2>\n<p>For Egypt, there may be opportunities for its export amid all these plans. There is significant mineral wealth (including coal, iron ore, phosphate, limestone and gypsum) waiting to be tapped. In terms of processed products agricultural exports are very much in the frame too, with Egyptian food exports worth $6.9 billion last year. Ready made garments might also benefit. These exports increased 14% year-on-year during the first seven months of 2026, reaching $2.14 billion, according to data from the Ready-Made Garments Export Council.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Egypt has begun building eight logistics corridors linking the Red Sea and the Mediterranean in an attempt to turn into a global hub. Rail is\u2026<\/p>\n","protected":false},"author":9,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[14748,21350,982,343,65,471,47],"tags":[12634],"class_list":["post-577359","post","type-post","status-publish","format-standard","hentry","category-alexandria","category-cairo","category-egypt","category-infrastructure","category-intermodal","category-news","category-rail-news","tag-railfreight"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.3 - aioseo.com -->\n\t<meta name=\"description\" content=\"Egypt has begun building eight logistics corridors linking the Red Sea and the Mediterranean in an attempt to turn into a global hub. Rail is\u2026\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Marco Raimondi\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=577359\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.3\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Egypt plans new corridors to create a \u2018Suez Canal on rails\u2019 - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Egypt has begun building eight logistics corridors linking the Red Sea and the Mediterranean in an attempt to turn into a global hub. Rail is\u2026\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=577359\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-10-14T09:50:50+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-10-14T09:50:50+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Egypt plans new corridors to create a \u2018Suez Canal on rails\u2019 - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Egypt has begun building eight logistics corridors linking the Red Sea and the Mediterranean in an attempt to turn into a global hub. Rail is\u2026\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=577359#blogposting\",\"name\":\"Egypt plans new corridors to create a \\u2018Suez Canal on rails\\u2019 - VibeWire Magazine\",\"headline\":\"Egypt plans new corridors to create a \\u2018Suez Canal on rails\\u2019\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.railfreight.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/shutterstock_605605712-scaled.jpg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=577359\\\/#articleImage\"},\"datePublished\":\"2026-10-14T19:50:50+10:00\",\"dateModified\":\"2026-10-14T19:50:50+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=577359#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=577359#webpage\"},\"articleSection\":\"Alexandria, Cairo, Egypt, Infrastructure, Intermodal, News, Rail News, RailFreight\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=577359#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=577359#listItem\",\"name\":\"Egypt plans new corridors to create a \\u2018Suez Canal on rails\\u2019\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=577359#listItem\",\"position\":3,\"name\":\"Egypt plans new corridors to create a \\u2018Suez Canal on rails\\u2019\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=577359\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=577359\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9\",\"name\":\"Marco Raimondi\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=577359#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fc241b4d8352e3e7ca08ec32c4ebd712ae862e0499265d83515e97acb5510625?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Marco Raimondi\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=577359#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=577359\",\"name\":\"Egypt plans new corridors to create a \\u2018Suez Canal on rails\\u2019 - VibeWire Magazine\",\"description\":\"Egypt has begun building eight logistics corridors linking the Red Sea and the Mediterranean in an attempt to turn into a global hub. Rail is\\u2026\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=577359#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9#author\"},\"datePublished\":\"2026-10-14T19:50:50+10:00\",\"dateModified\":\"2026-10-14T19:50:50+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Egypt plans new corridors to create a \u2018Suez Canal on rails\u2019 - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Egypt plans new corridors to create a \u2018Suez Canal on rails\u2019 - VibeWire Magazine","description":"Egypt has begun building eight logistics corridors linking the Red Sea and the Mediterranean in an attempt to turn into a global hub. Rail is\u2026","canonical_url":"https:\/\/www.vibewire.com.au\/?p=577359","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=577359#blogposting","name":"Egypt plans new corridors to create a \u2018Suez Canal on rails\u2019 - VibeWire Magazine","headline":"Egypt plans new corridors to create a \u2018Suez Canal on rails\u2019","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=9#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/10\/shutterstock_605605712-scaled.jpg","@id":"https:\/\/www.vibewire.com.au\/?p=577359\/#articleImage"},"datePublished":"2026-10-14T19:50:50+10:00","dateModified":"2026-10-14T19:50:50+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=577359#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=577359#webpage"},"articleSection":"Alexandria, Cairo, Egypt, Infrastructure, Intermodal, News, Rail News, RailFreight"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=577359#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=577359#listItem","name":"Egypt plans new corridors to create a \u2018Suez Canal on rails\u2019"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=577359#listItem","position":3,"name":"Egypt plans new corridors to create a \u2018Suez Canal on rails\u2019","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=577359\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=577359\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=9#author","url":"https:\/\/www.vibewire.com.au\/?author=9","name":"Marco Raimondi","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=577359#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/fc241b4d8352e3e7ca08ec32c4ebd712ae862e0499265d83515e97acb5510625?s=96&d=mm&r=g","width":96,"height":96,"caption":"Marco Raimondi"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=577359#webpage","url":"https:\/\/www.vibewire.com.au\/?p=577359","name":"Egypt plans new corridors to create a \u2018Suez Canal on rails\u2019 - VibeWire Magazine","description":"Egypt has begun building eight logistics corridors linking the Red Sea and the Mediterranean in an attempt to turn into a global hub. Rail is\u2026","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=577359#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=9#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=9#author"},"datePublished":"2026-10-14T19:50:50+10:00","dateModified":"2026-10-14T19:50:50+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Egypt plans new corridors to create a \u2018Suez Canal on rails\u2019 - VibeWire Magazine","og:description":"Egypt has begun building eight logistics corridors linking the Red Sea and the Mediterranean in an attempt to turn into a global hub. Rail is\u2026","og:url":"https:\/\/www.vibewire.com.au\/?p=577359","article:published_time":"2026-10-14T09:50:50+00:00","article:modified_time":"2026-10-14T09:50:50+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Egypt plans new corridors to create a \u2018Suez Canal on rails\u2019 - VibeWire Magazine","twitter:description":"Egypt has begun building eight logistics corridors linking the Red Sea and the Mediterranean in an attempt to turn into a global hub. Rail is\u2026","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"577359","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-10-14 10:38:44","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2026-10-14 10:28:41","updated":"2026-10-14 10:38:44","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\tEgypt plans new corridors to create a \u2018Suez Canal on rails\u2019\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au\/"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"Egypt plans new corridors to create a \u2018Suez Canal on rails\u2019","link":"https:\/\/www.vibewire.com.au\/?p=577359"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/577359","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=577359"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/577359\/revisions"}],"predecessor-version":[{"id":577527,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/577359\/revisions\/577527"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=577359"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=577359"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=577359"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}