{"id":557923,"date":"2026-09-30T14:53:04","date_gmt":"2026-09-30T04:53:04","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=557923"},"modified":"2026-09-30T14:53:51","modified_gmt":"2026-09-30T04:53:51","slug":"keilor-east-station-to-open-by-2031-as-second-stage-of-airport-rail-begins","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=557923","title":{"rendered":"Keilor East station to open by 2031 as second stage of airport rail begins"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">A new station at <a href=\"https:\/\/www.vibewire.com.au\/?tag=keilor-east\" target=\"_blank\" rel=\"noopener\">Keilor East<\/a> will be built by 2031 as part of the next stage of Melbourne&#8217;s airport rail line, the Prime Minister and Victorian government are set to announce. Early work on the 7.4-kilometre line running from Albion toward the airport via Keilor East will start within weeks, though major construction won&#8217;t begin until 2028. A timeline for the final stretch between Keilor East and the airport itself has not yet been set.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The line will connect directly to the <a href=\"https:\/\/www.vibewire.com.au\/?cat=1168\" target=\"_blank\" rel=\"noopener\">Metro Tunnel<\/a> and include a 500-metre rail bridge over the Maribyrnong River, according to the state and federal governments. It will be delivered alongside the first stage of the project, the $4.1 billion, six-platform Sunshine Superhub.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The announcement comes as <a href=\"https:\/\/www.vibewire.com.au\/?cat=513\" target=\"_blank\" rel=\"noopener\">Melbourne Airport<\/a> prepares to end a 56-year tradition of its own: from October 6, new drop-off and pick-up zones will replace the departures ramp passengers have used since the airport opened.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"alignleft size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"919\" height=\"1018\" src=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/09\/image-3.png\" alt=\"\" class=\"wp-image-558053\" style=\"aspect-ratio:0.9027509115497201;width:391px;height:auto\" srcset=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/09\/image-3.png 919w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/09\/image-3-271x300.png 271w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/09\/image-3-767x850.png 767w\" sizes=\"auto, (max-width: 919px) 100vw, 919px\" \/><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">The rail project&#8217;s timeline has shifted repeatedly. The Victorian government first said the line would be running by 2029, then pushed that to 2033, and has since gone quiet on a firm completion date. Delays have included a dispute over where the station should be built and disagreement between the airport and the state over an underground versus above-ground line, which was resolved in July 2024 when the airport dropped its preference for the costlier underground option to get the project moving.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Prime Minister Anthony Albanese said the government was &#8220;building Victoria&#8217;s future, unlocking capacity to run more trains, more often, and ensuring we have a train line to Melbourne Airport&#8221;. Premier Ben Carroll said Melbourne Airport was &#8220;getting on and delivering&#8221; a direct rail link. A Melbourne Airport spokesperson said discussions with both levels of government remain productive, and that while timing and delivery are a matter for government, the airport&#8217;s draft 2027 Master Plan protects for the state&#8217;s elevated rail solution and anticipates construction at the airport site beginning within five years.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Community frustration over the delays has been longstanding. In 2023, then-Moonee Valley mayor Pierce Tyson said residents had waited decades for the Keilor East station and called the repeated delays &#8220;deeply distressing&#8221;.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The line will connect directly to the Metro Tunnel and include a 500-metre rail bridge over the Maribyrnong River.<\/p>\n","protected":false},"author":21,"featured_media":557924,"comment_status":"open","ping_status":"open","sticky":true,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[35,47],"tags":[21236,10958,8],"class_list":["post-557923","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-breaking-news","category-rail-news","tag-keilor-east","tag-melbourne-airport-rail-link","tag-victoria"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.2 - aioseo.com -->\n\t<meta name=\"description\" content=\"The line will connect directly to the Metro Tunnel and include a 500-metre rail bridge over the Maribyrnong River.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Bardy Bigglesworth\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=557923\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.2\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Keilor East station to open by 2031 as second stage of airport rail begins\" \/>\n\t\t<meta property=\"og:description\" content=\"The line will connect directly to the Metro Tunnel and include a 500-metre rail bridge over the Maribyrnong River.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=557923\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/09\/image_2026-09-30_113533395.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/09\/image_2026-09-30_113533395.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"862\" \/>\n\t\t<meta property=\"og:image:height\" content=\"485\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-09-30T04:53:04+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-09-30T04:53:51+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Keilor East station to open by 2031 as second stage of airport rail begins\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The line will connect directly to the Metro Tunnel and include a 500-metre rail bridge over the Maribyrnong River.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/09\/image_2026-09-30_113533395.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=557923#blogposting\",\"name\":\"Keilor East station to open by 2031 as second stage of airport rail begins\",\"headline\":\"Keilor East station to open by 2031 as second stage of airport rail begins\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=21#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/image_2026-09-30_113533395.png\",\"width\":862,\"height\":485},\"datePublished\":\"2026-09-30T14:53:04+10:00\",\"dateModified\":\"2026-09-30T14:53:51+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=557923#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=557923#webpage\"},\"articleSection\":\"Breaking News, Rail News, Keilor East, Melbourne Airport Rail Link, victoria\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=557923#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=35#listItem\",\"name\":\"Breaking News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=35#listItem\",\"position\":2,\"name\":\"Breaking News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=35\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=557923#listItem\",\"name\":\"Keilor East station to open by 2031 as second stage of airport rail begins\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=557923#listItem\",\"position\":3,\"name\":\"Keilor East station to open by 2031 as second stage of airport rail begins\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=35#listItem\",\"name\":\"Breaking News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=557923\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=557923\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=21#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=21\",\"name\":\"Bardy Bigglesworth\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=557923#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e3d1fce2fc3f81c2cf0bda5fbfee560ac033389e9a3983a9ee462907c5ca5c9d?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Bardy Bigglesworth\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=557923#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=557923\",\"name\":\"Keilor East station to open by 2031 as second stage of airport rail begins\",\"description\":\"The line will connect directly to the Metro Tunnel and include a 500-metre rail bridge over the Maribyrnong River.\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=557923#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=21#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=21#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/image_2026-09-30_113533395.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=557923\\\/#mainImage\",\"width\":862,\"height\":485},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=557923#mainImage\"},\"datePublished\":\"2026-09-30T14:53:04+10:00\",\"dateModified\":\"2026-09-30T14:53:51+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Keilor East station to open by 2031 as second stage of airport rail begins<\/title>\n\n","aioseo_head_json":{"title":"Keilor East station to open by 2031 as second stage of airport rail begins","description":"The line will connect directly to the Metro Tunnel and include a 500-metre rail bridge over the Maribyrnong River.","canonical_url":"https:\/\/www.vibewire.com.au\/?p=557923","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=557923#blogposting","name":"Keilor East station to open by 2031 as second stage of airport rail begins","headline":"Keilor East station to open by 2031 as second stage of airport rail begins","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=21#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/09\/image_2026-09-30_113533395.png","width":862,"height":485},"datePublished":"2026-09-30T14:53:04+10:00","dateModified":"2026-09-30T14:53:51+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=557923#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=557923#webpage"},"articleSection":"Breaking News, Rail News, Keilor East, Melbourne Airport Rail Link, victoria"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=557923#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=35#listItem","name":"Breaking News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=35#listItem","position":2,"name":"Breaking News","item":"https:\/\/www.vibewire.com.au\/?cat=35","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=557923#listItem","name":"Keilor East station to open by 2031 as second stage of airport rail begins"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=557923#listItem","position":3,"name":"Keilor East station to open by 2031 as second stage of airport rail begins","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=35#listItem","name":"Breaking News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=557923\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=557923\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=21#author","url":"https:\/\/www.vibewire.com.au\/?author=21","name":"Bardy Bigglesworth","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=557923#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/e3d1fce2fc3f81c2cf0bda5fbfee560ac033389e9a3983a9ee462907c5ca5c9d?s=96&d=mm&r=g","width":96,"height":96,"caption":"Bardy Bigglesworth"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=557923#webpage","url":"https:\/\/www.vibewire.com.au\/?p=557923","name":"Keilor East station to open by 2031 as second stage of airport rail begins","description":"The line will connect directly to the Metro Tunnel and include a 500-metre rail bridge over the Maribyrnong River.","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=557923#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=21#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=21#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/09\/image_2026-09-30_113533395.png","@id":"https:\/\/www.vibewire.com.au\/?p=557923\/#mainImage","width":862,"height":485},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=557923#mainImage"},"datePublished":"2026-09-30T14:53:04+10:00","dateModified":"2026-09-30T14:53:51+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Keilor East station to open by 2031 as second stage of airport rail begins","og:description":"The line will connect directly to the Metro Tunnel and include a 500-metre rail bridge over the Maribyrnong River.","og:url":"https:\/\/www.vibewire.com.au\/?p=557923","og:image":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/09\/image_2026-09-30_113533395.png","og:image:secure_url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/09\/image_2026-09-30_113533395.png","og:image:width":"862","og:image:height":"485","article:published_time":"2026-09-30T04:53:04+00:00","article:modified_time":"2026-09-30T04:53:51+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Keilor East station to open by 2031 as second stage of airport rail begins","twitter:description":"The line will connect directly to the Metro Tunnel and include a 500-metre rail bridge over the Maribyrnong River.","twitter:creator":"@VibewireCentral","twitter:image":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/09\/image_2026-09-30_113533395.png"},"aioseo_meta_data":{"post_id":"557923","title":"#post_title","description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"Melbourne Airport","score":0,"analysis":[]},"additional":[{"keyphrase":"Melbourne Airport Rail Link","score":0},{"keyphrase":"Ben Carroll","score":0},{"keyphrase":"Keilor East Railway Station","score":0}]},"primary_term":null,"canonical_url":null,"og_title":"#post_title","og_description":"#post_excerpt","og_object_type":"default","og_image_type":"featured","og_image_url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/09\/image_2026-09-30_113533395.png","og_image_width":"862","og_image_height":"485","og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":true,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"seo_analyzer_scan_date":"2026-09-30 07:26:01","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-09-30 01:32:37","updated":"2026-09-30 07:26:01","focus_keyword":"Melbourne Airport","additional_keywords":[{"word":"Melbourne Airport Rail Link","score":74,"items":{"introductionKeyword":{"score":3},"keyphraseLength":{"score":9},"keyphraseDensity":{"score":4},"functionWordsInKeyphrase":{"score":9},"textCompetingLinks":{"score":9},"imageKeyphrase":{"score":6}}},{"word":"Ben Carroll","score":74,"items":{"introductionKeyword":{"score":3},"keyphraseLength":{"score":9},"keyphraseDensity":{"score":4},"functionWordsInKeyphrase":{"score":9},"textCompetingLinks":{"score":9},"imageKeyphrase":{"score":6}}},{"word":"Keilor East Railway Station","score":74,"items":{"introductionKeyword":{"score":3},"keyphraseLength":{"score":9},"keyphraseDensity":{"score":4},"functionWordsInKeyphrase":{"score":9},"textCompetingLinks":{"score":9},"imageKeyphrase":{"score":6}}}],"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=35\" title=\"Breaking News\">Breaking News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\tKeilor East station to open by 2031 as second stage of airport rail begins\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au\/"},{"label":"Breaking News","link":"https:\/\/www.vibewire.com.au\/?cat=35"},{"label":"Keilor East station to open by 2031 as second stage of airport rail begins","link":"https:\/\/www.vibewire.com.au\/?p=557923"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/557923","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=557923"}],"version-history":[{"count":4,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/557923\/revisions"}],"predecessor-version":[{"id":558056,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/557923\/revisions\/558056"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/media\/557924"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=557923"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=557923"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=557923"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}