{"id":554587,"date":"2026-09-28T15:45:42","date_gmt":"2026-09-28T05:45:42","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=554587"},"modified":"2026-09-28T15:46:05","modified_gmt":"2026-09-28T05:46:05","slug":"six-confidential-data-centre-projects-are-on-the-table-in-tasmania","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=554587","title":{"rendered":"Six confidential data centre projects are on the table in Tasmania"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">A document tabled in state parliament has revealed that unnamed companies are exploring six new data centres in Tasmania. The government has not said whether one company or several are behind the proposals.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Two of the six are at the feasibility stage, with a preferred site chosen and further assessment under way. One of these is planned for the north-west and would need 200 to 300 megawatts of power, which could make it the state&#8217;s largest data centre depending on where in that range it lands. A second project of the same size is still at the concept stage. A separate 50MW concept has reportedly expressed interest in Liberty Bell Bay, the closed manganese smelter in northern Tasmania.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If all six go ahead, they would draw at least 500MW.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The proposals come on top of <a href=\"https:\/\/www.vibewire.com.au\/?tag=firmus\">Firmus Technologies<\/a>&#8216; three AI data centres. One is under construction in Launceston, another has approval at the Bell Bay Advanced Manufacturing Zone, and a <a href=\"https:\/\/www.vibewire.com.au\/?p=554450\" target=\"_blank\" rel=\"noopener\">third awaits approval at Wesley Vale<\/a> in the north-west. Together they need 444MW, putting Firmus on track to become the state&#8217;s biggest power user. Firmus has confirmed it is not behind the six new proposals.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Separately, VIRIDIS has council approval for a small 1MW data centre in Burnie.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Separately, VIRIDIS has council approval for a small 1MW data centre in Burnie.<\/p>\n","protected":false},"author":90574,"featured_media":522856,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[35,12785],"tags":[14211,21027,942],"class_list":["post-554587","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-breaking-news","category-data-centre","tag-burnie","tag-firmus","tag-tasmania"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.2 - aioseo.com -->\n\t<meta name=\"description\" content=\"Separately, VIRIDIS has council approval for a small 1MW data centre in Burnie.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Telco Analyst\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=554587\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.2\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Six confidential data centre projects are on the table in Tasmania\" \/>\n\t\t<meta property=\"og:description\" content=\"Separately, VIRIDIS has council approval for a small 1MW data centre in Burnie.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=554587\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/08\/image_2026-08-28_121625866.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/08\/image_2026-08-28_121625866.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-09-28T05:45:42+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-09-28T05:46:05+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Six confidential data centre projects are on the table in Tasmania\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Separately, VIRIDIS has council approval for a small 1MW data centre in Burnie.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/08\/image_2026-08-28_121625866.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=554587#blogposting\",\"name\":\"Six confidential data centre projects are on the table in Tasmania\",\"headline\":\"Six confidential data centre projects are on the table in Tasmania\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=90574#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/image_2026-08-28_121625866.png\",\"width\":1200,\"height\":800},\"datePublished\":\"2026-09-28T15:45:42+10:00\",\"dateModified\":\"2026-09-28T15:46:05+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=554587#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=554587#webpage\"},\"articleSection\":\"Breaking News, Data Centre, Burnie, Firmus, tasmania\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=554587#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=35#listItem\",\"name\":\"Breaking News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=35#listItem\",\"position\":2,\"name\":\"Breaking News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=35\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=554587#listItem\",\"name\":\"Six confidential data centre projects are on the table in Tasmania\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=554587#listItem\",\"position\":3,\"name\":\"Six confidential data centre projects are on the table in Tasmania\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=35#listItem\",\"name\":\"Breaking News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=554587\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=554587\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=90574#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=90574\",\"name\":\"Telco Analyst\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=554587#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/223a29ff455a766a9ceca4c2dc0352aa8baef27c37eba4cf388f9d8bb7abff7e?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Telco Analyst\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=554587#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=554587\",\"name\":\"Six confidential data centre projects are on the table in Tasmania\",\"description\":\"Separately, VIRIDIS has council approval for a small 1MW data centre in Burnie.\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=554587#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=90574#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=90574#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/image_2026-08-28_121625866.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=554587\\\/#mainImage\",\"width\":1200,\"height\":800},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=554587#mainImage\"},\"datePublished\":\"2026-09-28T15:45:42+10:00\",\"dateModified\":\"2026-09-28T15:46:05+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Six confidential data centre projects are on the table in Tasmania<\/title>\n\n","aioseo_head_json":{"title":"Six confidential data centre projects are on the table in Tasmania","description":"Separately, VIRIDIS has council approval for a small 1MW data centre in Burnie.","canonical_url":"https:\/\/www.vibewire.com.au\/?p=554587","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=554587#blogposting","name":"Six confidential data centre projects are on the table in Tasmania","headline":"Six confidential data centre projects are on the table in Tasmania","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=90574#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/08\/image_2026-08-28_121625866.png","width":1200,"height":800},"datePublished":"2026-09-28T15:45:42+10:00","dateModified":"2026-09-28T15:46:05+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=554587#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=554587#webpage"},"articleSection":"Breaking News, Data Centre, Burnie, Firmus, tasmania"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=554587#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=35#listItem","name":"Breaking News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=35#listItem","position":2,"name":"Breaking News","item":"https:\/\/www.vibewire.com.au\/?cat=35","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=554587#listItem","name":"Six confidential data centre projects are on the table in Tasmania"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=554587#listItem","position":3,"name":"Six confidential data centre projects are on the table in Tasmania","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=35#listItem","name":"Breaking News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=554587\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=554587\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=90574#author","url":"https:\/\/www.vibewire.com.au\/?author=90574","name":"Telco Analyst","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=554587#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/223a29ff455a766a9ceca4c2dc0352aa8baef27c37eba4cf388f9d8bb7abff7e?s=96&d=mm&r=g","width":96,"height":96,"caption":"Telco Analyst"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=554587#webpage","url":"https:\/\/www.vibewire.com.au\/?p=554587","name":"Six confidential data centre projects are on the table in Tasmania","description":"Separately, VIRIDIS has council approval for a small 1MW data centre in Burnie.","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=554587#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=90574#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=90574#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/08\/image_2026-08-28_121625866.png","@id":"https:\/\/www.vibewire.com.au\/?p=554587\/#mainImage","width":1200,"height":800},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=554587#mainImage"},"datePublished":"2026-09-28T15:45:42+10:00","dateModified":"2026-09-28T15:46:05+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Six confidential data centre projects are on the table in Tasmania","og:description":"Separately, VIRIDIS has council approval for a small 1MW data centre in Burnie.","og:url":"https:\/\/www.vibewire.com.au\/?p=554587","og:image":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/08\/image_2026-08-28_121625866.png","og:image:secure_url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/08\/image_2026-08-28_121625866.png","og:image:width":"1200","og:image:height":"800","article:published_time":"2026-09-28T05:45:42+00:00","article:modified_time":"2026-09-28T05:46:05+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Six confidential data centre projects are on the table in Tasmania","twitter:description":"Separately, VIRIDIS has council approval for a small 1MW data centre in Burnie.","twitter:creator":"@VibewireCentral","twitter:image":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/08\/image_2026-08-28_121625866.png"},"aioseo_meta_data":{"post_id":"554587","title":"#post_title","description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"Firmus","score":0,"analysis":[]},"additional":[{"keyphrase":"Data Centre","score":0},{"keyphrase":"Launceston","score":0},{"keyphrase":"Burnie","score":0},{"keyphrase":"Liberty Bell Bay","score":0},{"keyphrase":"Tasmania","score":0}]},"primary_term":null,"canonical_url":null,"og_title":"#post_title","og_description":"#post_excerpt","og_object_type":"default","og_image_type":"featured","og_image_url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/08\/image_2026-08-28_121625866.png","og_image_width":"1200","og_image_height":"800","og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":true,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"seo_analyzer_scan_date":"2026-09-28 05:49:49","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-09-28 04:32:43","updated":"2026-09-28 05:49:49","focus_keyword":"Firmus","additional_keywords":[{"word":"Data Centre","score":78,"items":{"introductionKeyword":{"score":3},"keyphraseLength":{"score":9},"keyphraseDensity":{"score":9},"functionWordsInKeyphrase":{"score":9},"textCompetingLinks":{"score":9},"imageKeyphrase":{"score":3}}},{"word":"Launceston","score":69,"items":{"introductionKeyword":{"score":3},"keyphraseLength":{"score":9},"keyphraseDensity":{"score":4},"functionWordsInKeyphrase":{"score":9},"textCompetingLinks":{"score":9},"imageKeyphrase":{"score":3}}},{"word":"Burnie","score":69,"items":{"introductionKeyword":{"score":3},"keyphraseLength":{"score":9},"keyphraseDensity":{"score":4},"functionWordsInKeyphrase":{"score":9},"textCompetingLinks":{"score":9},"imageKeyphrase":{"score":3}}},{"word":"Liberty Bell Bay","score":69,"items":{"introductionKeyword":{"score":3},"keyphraseLength":{"score":9},"keyphraseDensity":{"score":4},"functionWordsInKeyphrase":{"score":9},"textCompetingLinks":{"score":9},"imageKeyphrase":{"score":3}}},{"word":"Tasmania","score":89,"items":{"introductionKeyword":{"score":9},"keyphraseLength":{"score":9},"keyphraseDensity":{"score":9},"functionWordsInKeyphrase":{"score":9},"textCompetingLinks":{"score":9},"imageKeyphrase":{"score":3}}}],"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=35\" title=\"Breaking News\">Breaking News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\tSix confidential data centre projects are on the table in Tasmania\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au\/"},{"label":"Breaking News","link":"https:\/\/www.vibewire.com.au\/?cat=35"},{"label":"Six confidential data centre projects are on the table in Tasmania","link":"https:\/\/www.vibewire.com.au\/?p=554587"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/554587","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/90574"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=554587"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/554587\/revisions"}],"predecessor-version":[{"id":554777,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/554587\/revisions\/554777"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/media\/522856"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=554587"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=554587"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=554587"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}