{"id":550479,"date":"2026-09-24T22:25:48","date_gmt":"2026-09-24T12:25:48","guid":{"rendered":"https:\/\/www.railfreight.com\/?p=74527"},"modified":"2026-09-24T22:25:48","modified_gmt":"2026-09-24T12:25:48","slug":"catalan-terminal-plan-faces-nimby-headwinds","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=550479","title":{"rendered":"Catalan terminal plan faces \u2018NIMBY\u2019 headwinds"},"content":{"rendered":"<p><strong>The government of Catalonia has announced plans to build four new rail freight terminals. Around a week after the announcement, the first one of these terminals is facing opposition. Local parties do not want the terminal in their neighbourhood. They fear that the area will serve as merely a logistical and industrial zone for the rest of Catalonia.<\/strong><br \/>\n<span id=\"more-74527\"><\/span>The <a href=\"https:\/\/www.railfreight.com\/railfreight\/2026\/09\/16\/catalonia-approves-e127m-plan-for-four-rail-freight-terminals\/\"  rel=\"noopener\">terminal plan<\/a>, originally revealed in June, covers four sites: Empord\u00e0 in the northeast near the French border, Pened\u00e8s between Barcelona and Tarragona, Terres de l\u2019Ebre in the south, and Lleida in western Catalonia.<\/p>\n<p>Local organisations in Pened\u00e8s are now planning to take to the streets to stop the plan, write local media. They fear that the 20 to 30-hectare facility will turn the area into just a transit and consolidation location for containers from Barcelona and Tarragona.<\/p>\n<p>The Pro Vegueria Pened\u00e8s association, for instance, argues that Catalonia should not build all its infrastructure between the local highway and the coast. The terminal would impact commuter rail lines and local residents, it says. Moreover, they oppose the movement of hazardous goods on rail in the area. An earlier logistics hub project, Logis Pened\u00e8s, was abandoned due to similar opposition.<\/p>\n<p>Rather, the Pro Vegueria Pened\u00e8s calls for the separation of freight from passenger traffic on the east-west railway through Catalonia. This should help decongest the route. Additionally, the local political party ERC laments a lack of clarity on the environmental, territorial, economic, and infrastructure impacts of Catalonia\u2019s plan.<\/p>\n<h2>From 4% to 21% rail freight modal share?<\/h2>\n<p>The Catalan government previously argued that the infrastructure investments are necessary in order to boost the share of rail in freight transportation. Catalonia currently has one of the lowest rail freight shares in Europe, according to the government\u2019s economic and social impact assessment.<\/p>\n<p>Rail accounted for just 3.94% of inland freight in 2024, with only 8.1 million tonnes of around 337 million tonnes transported by land moving by rail. The terminal plan could boost this to around 21%, says the Catalan government.<\/p>\n<p>Terminal capacity remains one of the key modal shift bottlenecks according to the government. The terminal in Empord\u00e0 would strengthen rail-road intermodal connections close to the French border, while Pened\u00e8s is intended to act as a major consolidation and distribution hub between the ports of Barcelona and Tarragona. Terres de l\u2019Ebre would connect southern Catalonia with the Mediterranean Corridor, while Lleida would support freight flows from the inland industrial and agricultural economy.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The government of Catalonia has announced plans to build four new rail freight terminals. Around a week after the announcement, the first one of these\u2026<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[20531,12082,343,12083,471,12084,47,1024,21193],"tags":[12634],"class_list":["post-550479","post","type-post","status-publish","format-standard","hentry","category-catalonia","category-emporda-intermodal-terminal","category-infrastructure","category-lleida","category-news","category-penedes","category-rail-news","category-spain","category-terres-de-lebre","tag-railfreight"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.2 - aioseo.com -->\n\t<meta name=\"description\" content=\"The government of Catalonia has announced plans to build four new rail freight terminals. Around a week after the announcement, the first one of these\u2026\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=550479\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.2\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Catalan terminal plan faces \u2018NIMBY\u2019 headwinds - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"The government of Catalonia has announced plans to build four new rail freight terminals. Around a week after the announcement, the first one of these\u2026\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=550479\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-09-24T12:25:48+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-09-24T12:25:48+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Catalan terminal plan faces \u2018NIMBY\u2019 headwinds - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The government of Catalonia has announced plans to build four new rail freight terminals. Around a week after the announcement, the first one of these\u2026\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=550479#blogposting\",\"name\":\"Catalan terminal plan faces \\u2018NIMBY\\u2019 headwinds - VibeWire Magazine\",\"headline\":\"Catalan terminal plan faces \\u2018NIMBY\\u2019 headwinds\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#articleImage\",\"width\":1028,\"height\":930},\"datePublished\":\"2026-09-24T22:25:48+10:00\",\"dateModified\":\"2026-09-24T22:25:48+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=550479#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=550479#webpage\"},\"articleSection\":\"Catalonia, Empord\\u00e0 Intermodal Terminal, Infrastructure, Lleida, News, Pened\\u00e8s, Rail News, Spain, Terres de l'Ebre, RailFreight\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=550479#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=550479#listItem\",\"name\":\"Catalan terminal plan faces \\u2018NIMBY\\u2019 headwinds\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=550479#listItem\",\"position\":3,\"name\":\"Catalan terminal plan faces \\u2018NIMBY\\u2019 headwinds\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=550479\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=550479\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=550479#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=550479#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=550479\",\"name\":\"Catalan terminal plan faces \\u2018NIMBY\\u2019 headwinds - VibeWire Magazine\",\"description\":\"The government of Catalonia has announced plans to build four new rail freight terminals. Around a week after the announcement, the first one of these\\u2026\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=550479#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"datePublished\":\"2026-09-24T22:25:48+10:00\",\"dateModified\":\"2026-09-24T22:25:48+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Catalan terminal plan faces \u2018NIMBY\u2019 headwinds - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Catalan terminal plan faces \u2018NIMBY\u2019 headwinds - VibeWire Magazine","description":"The government of Catalonia has announced plans to build four new rail freight terminals. Around a week after the announcement, the first one of these\u2026","canonical_url":"https:\/\/www.vibewire.com.au\/?p=550479","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=550479#blogposting","name":"Catalan terminal plan faces \u2018NIMBY\u2019 headwinds - VibeWire Magazine","headline":"Catalan terminal plan faces \u2018NIMBY\u2019 headwinds","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/#articleImage","width":1028,"height":930},"datePublished":"2026-09-24T22:25:48+10:00","dateModified":"2026-09-24T22:25:48+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=550479#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=550479#webpage"},"articleSection":"Catalonia, Empord\u00e0 Intermodal Terminal, Infrastructure, Lleida, News, Pened\u00e8s, Rail News, Spain, Terres de l'Ebre, RailFreight"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=550479#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=550479#listItem","name":"Catalan terminal plan faces \u2018NIMBY\u2019 headwinds"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=550479#listItem","position":3,"name":"Catalan terminal plan faces \u2018NIMBY\u2019 headwinds","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=550479\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=550479\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=550479#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=550479#webpage","url":"https:\/\/www.vibewire.com.au\/?p=550479","name":"Catalan terminal plan faces \u2018NIMBY\u2019 headwinds - VibeWire Magazine","description":"The government of Catalonia has announced plans to build four new rail freight terminals. Around a week after the announcement, the first one of these\u2026","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=550479#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"datePublished":"2026-09-24T22:25:48+10:00","dateModified":"2026-09-24T22:25:48+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Catalan terminal plan faces \u2018NIMBY\u2019 headwinds - VibeWire Magazine","og:description":"The government of Catalonia has announced plans to build four new rail freight terminals. Around a week after the announcement, the first one of these\u2026","og:url":"https:\/\/www.vibewire.com.au\/?p=550479","article:published_time":"2026-09-24T12:25:48+00:00","article:modified_time":"2026-09-24T12:25:48+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Catalan terminal plan faces \u2018NIMBY\u2019 headwinds - VibeWire Magazine","twitter:description":"The government of Catalonia has announced plans to build four new rail freight terminals. Around a week after the announcement, the first one of these\u2026","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"550479","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-09-24 13:18:37","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2026-09-24 13:17:36","updated":"2026-09-24 13:18:37","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\tCatalan terminal plan faces \u2018NIMBY\u2019 headwinds\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au\/"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"Catalan terminal plan faces \u2018NIMBY\u2019 headwinds","link":"https:\/\/www.vibewire.com.au\/?p=550479"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/550479","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=550479"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/550479\/revisions"}],"predecessor-version":[{"id":550484,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/550479\/revisions\/550484"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=550479"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=550479"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=550479"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}