{"id":547611,"date":"2026-09-22T18:05:27","date_gmt":"2026-09-22T08:05:27","guid":{"rendered":"https:\/\/railuk.com\/?p=200241"},"modified":"2026-09-22T18:05:27","modified_gmt":"2026-09-22T08:05:27","slug":"hs2-completes-massive-m42-bridge-lifts-during-weekend-closure","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=547611","title":{"rendered":"HS2 completes massive M42 bridge lifts during weekend closure"},"content":{"rendered":"<p class=\"wp-block-paragraph\">HS2 engineers have lifted the last of six enormous viaduct spans that will carry high speed trains over the M42 in the West Midlands, during a weekend closure of the motorway.<\/p>\n<p class=\"wp-block-paragraph\">The complex multi-stage operation at the Water Orton viaduct site was completed in the early hours of this morning (Monday, 21 September), with the motorway reopening at around 4am as planned.<\/p>\n<p class=\"wp-block-paragraph\">To take full advantage of the closure, a separate team &#8211; three miles to the south \u2013 spent the weekend lifting the last beams that will support another major HS2 bridge known as the \u2018twin box\u2019.<\/p>\n<p class=\"wp-block-paragraph\">The 300-metre-long structure near the NEC is formed of two boxes that will support the railway as it passes over the carriageways. This approach has been chosen because of the angle at which the railway must cross the motorway.<\/p>\n<p class=\"wp-block-paragraph\">The operations at both sites \u2013 which builds on progress over four weekends this summer &#8211; was led by HS2\u2019s West Midlands construction partner, Balfour Beatty VINCI (BBV).<\/p>\n<div class=\"wp-block-image\">\n<figure class=\"alignright size-large is-resized\"><a href=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/22085953\/Deck-beams-being-lifted-at-the-M42-twin-box-site-during-the-september-weekend-closure-scaled.png\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"575\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/22085953\/Deck-beams-being-lifted-at-the-M42-twin-box-site-during-the-september-weekend-closure-1024x575.png\" alt=\"\" class=\"wp-image-200247\" style=\"aspect-ratio:1.7809391814772542;width:407px;height:auto\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/22085953\/Deck-beams-being-lifted-at-the-M42-twin-box-site-during-the-september-weekend-closure-1024x575.png 1024w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/22085953\/Deck-beams-being-lifted-at-the-M42-twin-box-site-during-the-september-weekend-closure-768x431.png 768w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/22085953\/Deck-beams-being-lifted-at-the-M42-twin-box-site-during-the-september-weekend-closure-1536x862.png 1536w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/22085953\/Deck-beams-being-lifted-at-the-M42-twin-box-site-during-the-september-weekend-closure-300x168.png 300w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/22085953\/Deck-beams-being-lifted-at-the-M42-twin-box-site-during-the-september-weekend-closure-322x181.png 322w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/22085953\/Deck-beams-being-lifted-at-the-M42-twin-box-site-during-the-september-weekend-closure-695x390.png 695w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/22085953\/Deck-beams-being-lifted-at-the-M42-twin-box-site-during-the-september-weekend-closure-1067x599.png 1067w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/22085953\/Deck-beams-being-lifted-at-the-M42-twin-box-site-during-the-september-weekend-closure-2048x1150.png 2048w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/22085953\/Deck-beams-being-lifted-at-the-M42-twin-box-site-during-the-september-weekend-closure-1919x1077.png 1919w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Deck beams being lifted at the M42 twin box site.<\/figcaption><\/figure>\n<\/div>\n<p class=\"wp-block-paragraph\">Engineers can now proceed to the final stages of construction \u2013 installing the remaining parapets along the sides of the Water Orton viaducts, and the final concrete pours on the twin box ready for railway tracks to be laid.<\/p>\n<p class=\"wp-block-paragraph\">Agnes Usciak, HS2 Ltd\u2019s senior project manager said: \u201cI\u2019d like to thank motorists and local residents for their patience during this huge programme of work \u2013 our biggest yet over the motorway network.<\/p>\n<p class=\"wp-block-paragraph\">\u201cSplitting a huge construction programme into four separate weekends requires meticulous planning, and our engineers executed the entire operation with pin-point precision, ensuring the motorway reopened on time, every time.<\/p>\n<p class=\"wp-block-paragraph\">\u201cStructural completion of the Water Orton viaducts and the twin box means the end is in sight for our bumper programme of motorway works this year.\u201d<\/p>\n<p class=\"wp-block-paragraph\">The construction programme was meticulously planned into four weekends, spaced across the summer months, with engineers working on all three structures at the same time to reduce the number of closures.<\/p>\n<p class=\"wp-block-paragraph\">National Highways seized the opportunity to conduct their own programme of works while the motorway was closed \u2013 including demolition of the Bickenhill Bridge at the northern side of the M42 junction 6 roundabout.<\/p>\n<p class=\"wp-block-paragraph\">During the September closure, a 150-strong-team installed the final 44 beams over the southbound carriageway, completing the roof which will carry trains over the M42 near the NEC.<\/p>\n<p class=\"wp-block-paragraph\">The twin box roof is formed of 175 individual beams, which weigh between 56 and 92 tonnes. A 300-tonne crawler crane lifted and lowered each of the 23-metre-long beams into position, bridging the gap between the supporting walls and columns either side of the carriageway and inside the central reservation<\/p>\n<p class=\"wp-block-paragraph\">The completed structure now stands 10-metres-high, with two 145-metre-long walls and 46 internal columns supporting the 9,800-tonne beamed roof.<\/p>\n<p class=\"wp-block-paragraph\">The two Water Orton viaducts form the top of the triangular \u2018delta junction\u2019, linking Birmingham with the mainline heading north. They cross the M42, A446, the Birmingham \u2013 Peterborough railway line, and the River Tame.<\/p>\n<p class=\"wp-block-paragraph\">A separate team of 75 men and women have now installed the final two spans of Water Orton Viaduct number 2 over the southbound carriageway \u2013 replicating the successful extension of Water Orton 1 in August.<\/p>\n<p class=\"wp-block-paragraph\">Each 45-metre-long span was built using 18 pre-cast segments, which were manufactured locally at BBV\u2019s concrete batching plant in Kingsbury.<\/p>\n<div class=\"wp-block-image\">\n<figure class=\"alignleft size-large is-resized\"><a href=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/22090032\/Water-Orton-viaduct-span-on-an-SPMT-ahead-of-a-weekend-lifting-operation-July-2026-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/22090032\/Water-Orton-viaduct-span-on-an-SPMT-ahead-of-a-weekend-lifting-operation-July-2026-1024x683.jpg\" alt=\"\" class=\"wp-image-200248\" style=\"aspect-ratio:1.4992793575987737;width:381px;height:auto\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/22090032\/Water-Orton-viaduct-span-on-an-SPMT-ahead-of-a-weekend-lifting-operation-July-2026-1024x683.jpg 1024w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/22090032\/Water-Orton-viaduct-span-on-an-SPMT-ahead-of-a-weekend-lifting-operation-July-2026-300x200.jpg 300w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/22090032\/Water-Orton-viaduct-span-on-an-SPMT-ahead-of-a-weekend-lifting-operation-July-2026-768x512.jpg 768w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/22090032\/Water-Orton-viaduct-span-on-an-SPMT-ahead-of-a-weekend-lifting-operation-July-2026-1536x1025.jpg 1536w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/22090032\/Water-Orton-viaduct-span-on-an-SPMT-ahead-of-a-weekend-lifting-operation-July-2026-324x216.jpg 324w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/22090032\/Water-Orton-viaduct-span-on-an-SPMT-ahead-of-a-weekend-lifting-operation-July-2026-2048x1366.jpg 2048w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/22090032\/Water-Orton-viaduct-span-on-an-SPMT-ahead-of-a-weekend-lifting-operation-July-2026-1067x712.jpg 1067w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/22090032\/Water-Orton-viaduct-span-on-an-SPMT-ahead-of-a-weekend-lifting-operation-July-2026-696x464.jpg 696w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/22090032\/Water-Orton-viaduct-span-on-an-SPMT-ahead-of-a-weekend-lifting-operation-July-2026-1919x1280.jpg 1919w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Water Orton viaduct span on an SPMT.<\/figcaption><\/figure>\n<\/div>\n<p class=\"wp-block-paragraph\">Once assembled, the 1,000-tonne spans were driven into position using self-propelled modular transporters. They were then locked in place using tensioning cables inside the hollow centre of the viaduct.<\/p>\n<p class=\"wp-block-paragraph\">The structural design has been carried out by Balfour Beatty VINCI\u2019s Design Joint Venture (DJV), made up of Mott MacDonald and SYSTRA, with WW+P Architects.<\/p>\n<p class=\"wp-block-paragraph\">Oliver Shore, Project Director for Balfour Beatty VINCI, said: \u201cThe twin box and Water Orton Viaducts are three major structures that cross the busy M42 motorway. In just four weekends, we\u2019ve completed the bridging works on each of them, closing the gap over the north and southbound carriageways.<\/p>\n<p class=\"wp-block-paragraph\">\u201cThis was a huge engineering challenge and I\u2019m so proud of the way our teams have responded. Their skill, dedication and hard work throughout the summer means we can move forward to the next exciting phase of our work.\u201d<\/p>\n<p class=\"wp-block-paragraph\">In the coming days, BBV\u2019s engineers will extend Water Orton 2 by a further 40-metres, closing the final gap above Gilson Road.<\/p>\n<p class=\"wp-block-paragraph\">There will be a further closure of the M42 from 9pm on Friday, 23rd October to 5am on Monday, 26th October to install the viaduct\u2019s parapets on the sections directly above the motorway.<\/p>\n<p class=\"wp-block-paragraph\">To make full use of the closure, that the same weekend engineers will also carry out the fourth and final slide of the M6 South Viaduct West deck. The M6 carriageway will stay open during these works &#8211; only the M42 North to M6 North connector road will be closed.<\/p>\n<p class=\"wp-block-paragraph\">Image credit: HS2<\/p>\n","protected":false},"excerpt":{"rendered":"<p>HS2 engineers have lifted the last of six enormous viaduct spans that will carry high speed trains over the M42 in the West Midlands, during a weekend closure of the motorway. The complex multi-stage operation at the Water Orton viaduct site was completed in the early hours of this morning (Monday, 21 September), with the [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[53,1089,343,47,16148,16031,85],"tags":[],"class_list":["post-547611","post","type-post","status-publish","format-standard","hentry","category-high-speed-rail","category-hs2","category-infrastructure","category-rail-news","category-rail-projects","category-structures","category-uk"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.2 - aioseo.com -->\n\t<meta name=\"description\" content=\"HS2 engineers have lifted the last of six enormous viaduct spans that will carry high speed trains over the M42 in the West Midlands, during a weekend closure of the motorway. The complex multi-stage operation at the Water Orton viaduct site was completed in the early hours of this morning (Monday, 21 September), with the [\u2026]\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=547611\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.2\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"HS2 completes massive M42 bridge lifts during weekend closure - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"HS2 engineers have lifted the last of six enormous viaduct spans that will carry high speed trains over the M42 in the West Midlands, during a weekend closure of the motorway. The complex multi-stage operation at the Water Orton viaduct site was completed in the early hours of this morning (Monday, 21 September), with the [\u2026]\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=547611\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-09-22T08:05:27+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-09-22T08:05:27+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"HS2 completes massive M42 bridge lifts during weekend closure - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"HS2 engineers have lifted the last of six enormous viaduct spans that will carry high speed trains over the M42 in the West Midlands, during a weekend closure of the motorway. The complex multi-stage operation at the Water Orton viaduct site was completed in the early hours of this morning (Monday, 21 September), with the [\u2026]\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=547611#blogposting\",\"name\":\"HS2 completes massive M42 bridge lifts during weekend closure - VibeWire Magazine\",\"headline\":\"HS2 completes massive M42 bridge lifts during weekend closure\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/cdn.railuk.co\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/22085953\\\/Deck-beams-being-lifted-at-the-M42-twin-box-site-during-the-september-weekend-closure-1024x575.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=547611\\\/#articleImage\"},\"datePublished\":\"2026-09-22T18:05:27+10:00\",\"dateModified\":\"2026-09-22T18:05:27+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=547611#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=547611#webpage\"},\"articleSection\":\"High-Speed Rail, HS2, Infrastructure, Rail News, Rail Projects, Structures, UK\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=547611#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=547611#listItem\",\"name\":\"HS2 completes massive M42 bridge lifts during weekend closure\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=547611#listItem\",\"position\":3,\"name\":\"HS2 completes massive M42 bridge lifts during weekend closure\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=547611\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=547611\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=547611#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=547611#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=547611\",\"name\":\"HS2 completes massive M42 bridge lifts during weekend closure - VibeWire Magazine\",\"description\":\"HS2 engineers have lifted the last of six enormous viaduct spans that will carry high speed trains over the M42 in the West Midlands, during a weekend closure of the motorway. The complex multi-stage operation at the Water Orton viaduct site was completed in the early hours of this morning (Monday, 21 September), with the [\\u2026]\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=547611#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"datePublished\":\"2026-09-22T18:05:27+10:00\",\"dateModified\":\"2026-09-22T18:05:27+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>HS2 completes massive M42 bridge lifts during weekend closure - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"HS2 completes massive M42 bridge lifts during weekend closure - VibeWire Magazine","description":"HS2 engineers have lifted the last of six enormous viaduct spans that will carry high speed trains over the M42 in the West Midlands, during a weekend closure of the motorway. The complex multi-stage operation at the Water Orton viaduct site was completed in the early hours of this morning (Monday, 21 September), with the [\u2026]","canonical_url":"https:\/\/www.vibewire.com.au\/?p=547611","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=547611#blogposting","name":"HS2 completes massive M42 bridge lifts during weekend closure - VibeWire Magazine","headline":"HS2 completes massive M42 bridge lifts during weekend closure","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/22085953\/Deck-beams-being-lifted-at-the-M42-twin-box-site-during-the-september-weekend-closure-1024x575.png","@id":"https:\/\/www.vibewire.com.au\/?p=547611\/#articleImage"},"datePublished":"2026-09-22T18:05:27+10:00","dateModified":"2026-09-22T18:05:27+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=547611#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=547611#webpage"},"articleSection":"High-Speed Rail, HS2, Infrastructure, Rail News, Rail Projects, Structures, UK"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=547611#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=547611#listItem","name":"HS2 completes massive M42 bridge lifts during weekend closure"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=547611#listItem","position":3,"name":"HS2 completes massive M42 bridge lifts during weekend closure","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=547611\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=547611\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=547611#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=547611#webpage","url":"https:\/\/www.vibewire.com.au\/?p=547611","name":"HS2 completes massive M42 bridge lifts during weekend closure - VibeWire Magazine","description":"HS2 engineers have lifted the last of six enormous viaduct spans that will carry high speed trains over the M42 in the West Midlands, during a weekend closure of the motorway. The complex multi-stage operation at the Water Orton viaduct site was completed in the early hours of this morning (Monday, 21 September), with the [\u2026]","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=547611#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"datePublished":"2026-09-22T18:05:27+10:00","dateModified":"2026-09-22T18:05:27+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"HS2 completes massive M42 bridge lifts during weekend closure - VibeWire Magazine","og:description":"HS2 engineers have lifted the last of six enormous viaduct spans that will carry high speed trains over the M42 in the West Midlands, during a weekend closure of the motorway. The complex multi-stage operation at the Water Orton viaduct site was completed in the early hours of this morning (Monday, 21 September), with the [\u2026]","og:url":"https:\/\/www.vibewire.com.au\/?p=547611","article:published_time":"2026-09-22T08:05:27+00:00","article:modified_time":"2026-09-22T08:05:27+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"HS2 completes massive M42 bridge lifts during weekend closure - VibeWire Magazine","twitter:description":"HS2 engineers have lifted the last of six enormous viaduct spans that will carry high speed trains over the M42 in the West Midlands, during a weekend closure of the motorway. The complex multi-stage operation at the Water Orton viaduct site was completed in the early hours of this morning (Monday, 21 September), with the [\u2026]","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"547611","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-09-22 09:20:44","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2026-09-22 09:17:22","updated":"2026-09-22 09:20:44","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\tHS2 completes massive M42 bridge lifts during weekend closure\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au\/"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"HS2 completes massive M42 bridge lifts during weekend closure","link":"https:\/\/www.vibewire.com.au\/?p=547611"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/547611","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=547611"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/547611\/revisions"}],"predecessor-version":[{"id":547614,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/547611\/revisions\/547614"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=547611"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=547611"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=547611"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}