{"id":533393,"date":"2026-09-08T19:08:20","date_gmt":"2026-09-08T09:08:20","guid":{"rendered":"https:\/\/railuk.com\/?p=199624"},"modified":"2026-09-08T19:08:20","modified_gmt":"2026-09-08T09:08:20","slug":"first-new-state-of-the-art-dlr-train-returns-to-service-following-enhancements-and-testing","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=533393","title":{"rendered":"First new state-of-the-art DLR train returns to service following enhancements and testing"},"content":{"rendered":"<p class=\"wp-block-paragraph\">The first of the new DLR trains has returned to customer service following the completion of modifications and a comprehensive programme of testing and assurance.<\/p>\n<p class=\"wp-block-paragraph\">This is the first of 54 trains which will be gradually introduced to the network, with their performance closely monitored. These state-of-the-art trains will include spacious walk-through carriages, live travel information, air conditioning, enhanced accessibility features including three multi-use areas and three dedicated wheelchair spaces, and mobile charging points.<\/p>\n<p class=\"wp-block-paragraph\">The walk-through design increases train capacity by 10 per cent, which will also help support further growth in London, particularly in areas such as Stratford, Woolwich Arsenal and the Isle of Dogs. The new fleet will ultimately replace the DLR&#8217;s oldest trains, some of which are more than 30 years old.<\/p>\n<p class=\"wp-block-paragraph\">The new trains were withdrawn from service in November 2025 after an issue affecting train performance in low adhesion conditions was identified on one train. Safety is always TfL&#8217;s top priority, and all trains were removed from service as a precaution while TfL and manufacturer CAF investigated the issue and developed a solution.<\/p>\n<div class=\"wp-block-image\">\n<figure class=\"alignright size-large is-resized\"><a href=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/08100530\/TfL-Image-New-DLR-train-in-service-today-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/08100530\/TfL-Image-New-DLR-train-in-service-today-1024x683.jpg\" alt=\"\" class=\"wp-image-199627\" style=\"width:415px;height:auto\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/08100530\/TfL-Image-New-DLR-train-in-service-today-1024x683.jpg 1024w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/08100530\/TfL-Image-New-DLR-train-in-service-today-300x200.jpg 300w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/08100530\/TfL-Image-New-DLR-train-in-service-today-768x512.jpg 768w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/08100530\/TfL-Image-New-DLR-train-in-service-today-1536x1024.jpg 1536w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/08100530\/TfL-Image-New-DLR-train-in-service-today-2048x1365.jpg 2048w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/08100530\/TfL-Image-New-DLR-train-in-service-today-324x216.jpg 324w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/08100530\/TfL-Image-New-DLR-train-in-service-today-1068x712.jpg 1068w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/08100530\/TfL-Image-New-DLR-train-in-service-today-696x464.jpg 696w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/08100530\/TfL-Image-New-DLR-train-in-service-today-1920x1280.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n<\/div>\n<p class=\"wp-block-paragraph\">A number of enhancements have now been made to improve train performance in low adhesion conditions, following extensive testing and assurance work. These include changes to the trains&#8217; braking systems, the installation of equipment to improve grip between the wheels and the track, and additional measures to reduce the impact of low adhesion conditions in key locations across the network.<\/p>\n<p class=\"wp-block-paragraph\">Following these modifications and a comprehensive programme of testing in a range of operating conditions, the first train has now returned to customer service.\u00a0 The phased reintroduction of the fleet will begin on the Stratford International to Woolwich Arsenal route. The number of trains in service will increase gradually through the carefully controlled introduction of additional trains.<\/p>\n<p class=\"wp-block-paragraph\">TfL is currently working with CAF and its suppliers to finalise the full rollout plan for the new trains, with further details to be confirmed in due course.<\/p>\n<p class=\"wp-block-paragraph\">Stuart Harvey, TfL\u2019s chief capital officer, said: &#8220;We&#8217;re pleased that the first of our new DLR trains has returned to customer service following the completion of a thorough programme of modifications, testing and assurance.<\/p>\n<p class=\"wp-block-paragraph\">\u201cSafety is always our top priority, and we took the decision to remove the trains from service as a precaution while we worked with CAF to investigate the issue and implement a solution.<\/p>\n<p class=\"wp-block-paragraph\">\u201cI apologise for the delay in reintroducing the trains but am pleased this marks an important milestone in delivering a modern new fleet for the DLR. As we begin the phased reintroduction of the trains, customers will start to benefit from more spacious and accessible journeys, while we continue to monitor performance and introduce further trains into service.&#8221;<\/p>\n<p class=\"wp-block-paragraph\">The DLR fleet replacement programme will see 54 new trains introduced across the network, supporting growth in east and south-east London and helping meet increasing customer demand.<\/p>\n<p class=\"wp-block-paragraph\">Image credit: TfL<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The first of the new DLR trains has returned to customer service following the completion of modifications and a comprehensive programme of testing and assurance. This is the first of 54 trains which will be gradually introduced to the network, with their performance closely monitored. These state-of-the-art trains will include spacious walk-through carriages, live travel [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[16017,47,180,43,913,85],"tags":[],"class_list":["post-533393","post","type-post","status-publish","format-standard","hentry","category-industry-news","category-rail-news","category-rolling-stock","category-safety","category-travel","category-uk"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.1.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"The first of the new DLR trains has returned to customer service following the completion of modifications and a comprehensive programme of testing and assurance. This is the first of 54 trains which will be gradually introduced to the network, with their performance closely monitored. These state-of-the-art trains will include spacious walk-through carriages, live travel [\u2026]\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=533393\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.1.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"First new state-of-the-art DLR train returns to service following enhancements and testing - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"The first of the new DLR trains has returned to customer service following the completion of modifications and a comprehensive programme of testing and assurance. This is the first of 54 trains which will be gradually introduced to the network, with their performance closely monitored. These state-of-the-art trains will include spacious walk-through carriages, live travel [\u2026]\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=533393\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-09-08T09:08:20+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-09-08T09:08:20+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"First new state-of-the-art DLR train returns to service following enhancements and testing - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The first of the new DLR trains has returned to customer service following the completion of modifications and a comprehensive programme of testing and assurance. This is the first of 54 trains which will be gradually introduced to the network, with their performance closely monitored. These state-of-the-art trains will include spacious walk-through carriages, live travel [\u2026]\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=533393#blogposting\",\"name\":\"First new state-of-the-art DLR train returns to service following enhancements and testing - VibeWire Magazine\",\"headline\":\"First new state-of-the-art DLR train returns to service following enhancements and testing\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/cdn.railuk.co\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/08100530\\\/TfL-Image-New-DLR-train-in-service-today-1024x683.jpg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=533393\\\/#articleImage\"},\"datePublished\":\"2026-09-08T19:08:20+10:00\",\"dateModified\":\"2026-09-08T19:08:20+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=533393#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=533393#webpage\"},\"articleSection\":\"Industry News, Rail News, Rolling Stock, Safety, Travel, UK\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=533393#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=43#listItem\",\"name\":\"Safety\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=43#listItem\",\"position\":2,\"name\":\"Safety\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=43\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=533393#listItem\",\"name\":\"First new state-of-the-art DLR train returns to service following enhancements and testing\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=533393#listItem\",\"position\":3,\"name\":\"First new state-of-the-art DLR train returns to service following enhancements and testing\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=43#listItem\",\"name\":\"Safety\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=533393\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=533393\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=533393#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=533393#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=533393\",\"name\":\"First new state-of-the-art DLR train returns to service following enhancements and testing - VibeWire Magazine\",\"description\":\"The first of the new DLR trains has returned to customer service following the completion of modifications and a comprehensive programme of testing and assurance. This is the first of 54 trains which will be gradually introduced to the network, with their performance closely monitored. These state-of-the-art trains will include spacious walk-through carriages, live travel [\\u2026]\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=533393#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"datePublished\":\"2026-09-08T19:08:20+10:00\",\"dateModified\":\"2026-09-08T19:08:20+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>First new state-of-the-art DLR train returns to service following enhancements and testing - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"First new state-of-the-art DLR train returns to service following enhancements and testing - VibeWire Magazine","description":"The first of the new DLR trains has returned to customer service following the completion of modifications and a comprehensive programme of testing and assurance. This is the first of 54 trains which will be gradually introduced to the network, with their performance closely monitored. These state-of-the-art trains will include spacious walk-through carriages, live travel [\u2026]","canonical_url":"https:\/\/www.vibewire.com.au\/?p=533393","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=533393#blogposting","name":"First new state-of-the-art DLR train returns to service following enhancements and testing - VibeWire Magazine","headline":"First new state-of-the-art DLR train returns to service following enhancements and testing","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/09\/08100530\/TfL-Image-New-DLR-train-in-service-today-1024x683.jpg","@id":"https:\/\/www.vibewire.com.au\/?p=533393\/#articleImage"},"datePublished":"2026-09-08T19:08:20+10:00","dateModified":"2026-09-08T19:08:20+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=533393#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=533393#webpage"},"articleSection":"Industry News, Rail News, Rolling Stock, Safety, Travel, UK"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=533393#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=43#listItem","name":"Safety"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=43#listItem","position":2,"name":"Safety","item":"https:\/\/www.vibewire.com.au\/?cat=43","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=533393#listItem","name":"First new state-of-the-art DLR train returns to service following enhancements and testing"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=533393#listItem","position":3,"name":"First new state-of-the-art DLR train returns to service following enhancements and testing","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=43#listItem","name":"Safety"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=533393\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=533393\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=533393#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=533393#webpage","url":"https:\/\/www.vibewire.com.au\/?p=533393","name":"First new state-of-the-art DLR train returns to service following enhancements and testing - VibeWire Magazine","description":"The first of the new DLR trains has returned to customer service following the completion of modifications and a comprehensive programme of testing and assurance. This is the first of 54 trains which will be gradually introduced to the network, with their performance closely monitored. These state-of-the-art trains will include spacious walk-through carriages, live travel [\u2026]","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=533393#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"datePublished":"2026-09-08T19:08:20+10:00","dateModified":"2026-09-08T19:08:20+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"First new state-of-the-art DLR train returns to service following enhancements and testing - VibeWire Magazine","og:description":"The first of the new DLR trains has returned to customer service following the completion of modifications and a comprehensive programme of testing and assurance. This is the first of 54 trains which will be gradually introduced to the network, with their performance closely monitored. These state-of-the-art trains will include spacious walk-through carriages, live travel [\u2026]","og:url":"https:\/\/www.vibewire.com.au\/?p=533393","article:published_time":"2026-09-08T09:08:20+00:00","article:modified_time":"2026-09-08T09:08:20+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"First new state-of-the-art DLR train returns to service following enhancements and testing - VibeWire Magazine","twitter:description":"The first of the new DLR trains has returned to customer service following the completion of modifications and a comprehensive programme of testing and assurance. This is the first of 54 trains which will be gradually introduced to the network, with their performance closely monitored. These state-of-the-art trains will include spacious walk-through carriages, live travel [\u2026]","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"533393","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-09-08 10:17:32","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2026-09-08 10:14:44","updated":"2026-09-08 10:17:32","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=43\" title=\"Safety\">Safety<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tFirst new state-of-the-art DLR train returns to service following enhancements and testing\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Safety","link":"https:\/\/www.vibewire.com.au\/?cat=43"},{"label":"First new state-of-the-art DLR train returns to service following enhancements and testing","link":"https:\/\/www.vibewire.com.au\/?p=533393"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/533393","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=533393"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/533393\/revisions"}],"predecessor-version":[{"id":533394,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/533393\/revisions\/533394"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=533393"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=533393"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=533393"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}