{"id":52873,"date":"2024-05-24T22:37:36","date_gmt":"2024-05-24T12:37:36","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=52873"},"modified":"2024-05-24T22:37:36","modified_gmt":"2024-05-24T12:37:36","slug":"milestone-reached-as-midland-main-line-prepares-to-turn-power-on-to-new-electric-wires","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=52873","title":{"rendered":"Milestone reached as Midland Main Line prepares to turn power on to new electric wires"},"content":{"rendered":"<p>A milestone has been reached for the electrification of the Midland Main Line after the final bridge was demolished on the Kettering to Wigston stretch to prepare for new overhead wires to be powered up.<\/p>\n<p>Over the weekend of 18 and 19 May, engineers successfully demolished the Three Arches bridge near Market Harborough to allow for new wires to be installed between Kettering and Wigston.<\/p>\n<p>Along the Kettering to Wigston stretch, there have been 18 bridges which have seen vital upgrade work to prepare for the new wires.<\/p>\n<p>Video credit: Network Rail<\/p>\n<p>This includes two bridges demolished and 16 bridges either reconstructed, altered, or lowered.<\/p>\n<p>The installation of the new wires is part of the wider electrification project on the Midland Main Line, and it will deliver greener, faster, and more reliable journeys for passengers across the route.<\/p>\n<p>Electrification of the route also allows for the introduction of East Midlands Railway\u2019s new fleet of bi-mode trains.<\/p>\n<p>Three Arches bridge will be re-built in the future once the electrification is complete.<\/p>\n<p>James Spencer, Project Manager for Network Rail said: \u201cThe final bridge to be demolished in this section marks a significant milestone for the Midland Main Line electrification project as we prepare to power up the route.<\/p>\n<p>\u201cThis work means passengers travelling along the Kettering to Wigston line will soon see faster, cleaner, and more reliable journeys.<\/p>\n<p>\u201cWe would like to thank local residents for their patience and understanding while work has taken place through the area, and for the further electrification work due to take place.\u201d<\/p>\n<p>Tim Legg, Head of Operations for Story Contracting said:\u00a0\u201cThe Network Rail and Story Contracting team have worked extremely hard to reach this important stage in the Midland Main Line programme and I am extremely proud of what they have achieved.<\/p>\n<p>\u00a0\u201cThe Three Arch bridge demolition and other structure works are essential in supporting Network Rail\u2019s aims to deliver a greener, more reliable railway to connect passengers right the way between London and Sheffield, via Nottingham and Derby.\u201d<\/p>","protected":false},"excerpt":{"rendered":"<p>A milestone has been reached for the electrification of the Midland Main Line after the final bridge was demolished on the Kettering to Wigston stretch [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":52874,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[47],"tags":[7,11],"class_list":["post-52873","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-rail-news","tag-transport","tag-usa"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.0.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"A milestone has been reached for the electrification of the Midland Main Line after the final bridge was demolished on the Kettering to Wigston stretch to prepare for new overhead wires to be powered up. Over the weekend of 18 and 19 May, engineers successfully demolished the Three Arches bridge near Market Harborough to allow\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=52873\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.0.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Milestone reached as Midland Main Line prepares to turn power on to new electric wires - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"A milestone has been reached for the electrification of the Midland Main Line after the final bridge was demolished on the Kettering to Wigston stretch to prepare for new overhead wires to be powered up. Over the weekend of 18 and 19 May, engineers successfully demolished the Three Arches bridge near Market Harborough to allow\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=52873\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-05-24T12:37:36+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-05-24T12:37:36+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Milestone reached as Midland Main Line prepares to turn power on to new electric wires - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"A milestone has been reached for the electrification of the Midland Main Line after the final bridge was demolished on the Kettering to Wigston stretch to prepare for new overhead wires to be powered up. Over the weekend of 18 and 19 May, engineers successfully demolished the Three Arches bridge near Market Harborough to allow\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=52873#blogposting\",\"name\":\"Milestone reached as Midland Main Line prepares to turn power on to new electric wires - VibeWire Magazine\",\"headline\":\"Milestone reached as Midland Main Line prepares to turn power on to new electric wires\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/NR-Midland-GuqdLi.jpeg\",\"width\":1598,\"height\":998},\"datePublished\":\"2024-05-24T22:37:36+10:00\",\"dateModified\":\"2024-05-24T22:37:36+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=52873#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=52873#webpage\"},\"articleSection\":\"Rail News, transport, USA\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=52873#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=52873#listItem\",\"name\":\"Milestone reached as Midland Main Line prepares to turn power on to new electric wires\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=52873#listItem\",\"position\":3,\"name\":\"Milestone reached as Midland Main Line prepares to turn power on to new electric wires\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=52873\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=52873\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=52873#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=52873\",\"name\":\"Milestone reached as Midland Main Line prepares to turn power on to new electric wires - VibeWire Magazine\",\"description\":\"A milestone has been reached for the electrification of the Midland Main Line after the final bridge was demolished on the Kettering to Wigston stretch to prepare for new overhead wires to be powered up. Over the weekend of 18 and 19 May, engineers successfully demolished the Three Arches bridge near Market Harborough to allow\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=52873#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/NR-Midland-GuqdLi.jpeg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=52873\\\/#mainImage\",\"width\":1598,\"height\":998},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=52873#mainImage\"},\"datePublished\":\"2024-05-24T22:37:36+10:00\",\"dateModified\":\"2024-05-24T22:37:36+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Milestone reached as Midland Main Line prepares to turn power on to new electric wires - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Milestone reached as Midland Main Line prepares to turn power on to new electric wires - VibeWire Magazine","description":"A milestone has been reached for the electrification of the Midland Main Line after the final bridge was demolished on the Kettering to Wigston stretch to prepare for new overhead wires to be powered up. Over the weekend of 18 and 19 May, engineers successfully demolished the Three Arches bridge near Market Harborough to allow","canonical_url":"https:\/\/www.vibewire.com.au\/?p=52873","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=52873#blogposting","name":"Milestone reached as Midland Main Line prepares to turn power on to new electric wires - VibeWire Magazine","headline":"Milestone reached as Midland Main Line prepares to turn power on to new electric wires","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/NR-Midland-GuqdLi.jpeg","width":1598,"height":998},"datePublished":"2024-05-24T22:37:36+10:00","dateModified":"2024-05-24T22:37:36+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=52873#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=52873#webpage"},"articleSection":"Rail News, transport, USA"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=52873#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=52873#listItem","name":"Milestone reached as Midland Main Line prepares to turn power on to new electric wires"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=52873#listItem","position":3,"name":"Milestone reached as Midland Main Line prepares to turn power on to new electric wires","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=52873\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=52873\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=52873#webpage","url":"https:\/\/www.vibewire.com.au\/?p=52873","name":"Milestone reached as Midland Main Line prepares to turn power on to new electric wires - VibeWire Magazine","description":"A milestone has been reached for the electrification of the Midland Main Line after the final bridge was demolished on the Kettering to Wigston stretch to prepare for new overhead wires to be powered up. Over the weekend of 18 and 19 May, engineers successfully demolished the Three Arches bridge near Market Harborough to allow","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=52873#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/NR-Midland-GuqdLi.jpeg","@id":"https:\/\/www.vibewire.com.au\/?p=52873\/#mainImage","width":1598,"height":998},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=52873#mainImage"},"datePublished":"2024-05-24T22:37:36+10:00","dateModified":"2024-05-24T22:37:36+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Milestone reached as Midland Main Line prepares to turn power on to new electric wires - VibeWire Magazine","og:description":"A milestone has been reached for the electrification of the Midland Main Line after the final bridge was demolished on the Kettering to Wigston stretch to prepare for new overhead wires to be powered up. Over the weekend of 18 and 19 May, engineers successfully demolished the Three Arches bridge near Market Harborough to allow","og:url":"https:\/\/www.vibewire.com.au\/?p=52873","article:published_time":"2024-05-24T12:37:36+00:00","article:modified_time":"2024-05-24T12:37:36+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Milestone reached as Midland Main Line prepares to turn power on to new electric wires - VibeWire Magazine","twitter:description":"A milestone has been reached for the electrification of the Midland Main Line after the final bridge was demolished on the Kettering to Wigston stretch to prepare for new overhead wires to be powered up. Over the weekend of 18 and 19 May, engineers successfully demolished the Three Arches bridge near Market Harborough to allow","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"52873","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-06-20 22:28:12","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-05-24 22:40:38","updated":"2026-06-20 22:28:12","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tMilestone reached as Midland Main Line prepares to turn power on to new electric wires\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"Milestone reached as Midland Main Line prepares to turn power on to new electric wires","link":"https:\/\/www.vibewire.com.au\/?p=52873"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/52873","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=52873"}],"version-history":[{"count":0,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/52873\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/media\/52874"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=52873"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=52873"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=52873"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}