{"id":527582,"date":"2026-09-03T10:43:39","date_gmt":"2026-09-03T00:43:39","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=527582"},"modified":"2026-09-03T10:43:50","modified_gmt":"2026-09-03T00:43:50","slug":"tasmanias-ai-data-centre-pipeline-reaches-400mw","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=527582","title":{"rendered":"Tasmania&#8217;s AI data centre pipeline reaches 400MW"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Victoria isn&#8217;t the only state making a case for AI infrastructure. <a href=\"https:\/\/www.vibewire.com.au\/?tag=tasmania\" target=\"_blank\" rel=\"noopener\">Tasmania<\/a> has quietly built a competing pitch to become Australia&#8217;s AI factory location, built on two natural advantages no mainland state can fully replicate: climate and clean power. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/firmus.co\" target=\"_blank\" rel=\"noopener\">Firmus Technologies<\/a> \u2014 the same company partnering with Nvidia on Melbourne&#8217;s <a href=\"https:\/\/firmus.co\/infrastructure\/southgate\" target=\"_blank\" rel=\"noopener\">Project Southgate<\/a> \u2014 chose Tasmania specifically for its cool climate, which lets AI hardware run with minimal or no active water cooling for most of the year, and its access to abundant hydro and wind generation via state-owned Hydro Tasmania. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That advantage has drawn roughly A$2.1 billion of AI factory construction to Launceston alone, with two further sites proposed in the state&#8217;s north and around 400 megawatts of combined load across the three \u2014 enough, on some estimates, to draw close to 20% of the state&#8217;s total power capacity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That scale of demand has now triggered formal scrutiny. Tasmania&#8217;s Parliament opened a House of Assembly inquiry into AI data centres on 18 August 2026, after the Government Administration Committee A resolved to launch it on 5 August, with submissions open until 21 September. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Chaired by Labor MP <a href=\"https:\/\/www.parliament.tas.gov.au\/house-of-assembly\/currentmembers\/brian-mitchell\" target=\"_blank\" rel=\"noopener\">Brian Mitchell<\/a> with Greens MP <a href=\"https:\/\/www.parliament.tas.gov.au\/house-of-assembly\/currentmembers\/tabatha-badger\" target=\"_blank\" rel=\"noopener\">Tabatha Badger<\/a> as deputy chair, the committee has the power to recommend actual legislation and regulation \u2014 covering how power and water get allocated, what proponents must disclose, and what tangible benefit Tasmanians receive in return. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That matters because Tasmania currently has no dedicated data centre policy framework: its only relevant document is the Data Centre Action Strategy, an investment-attraction paper last updated by the Office of the Coordinator-General back in 2018, long before AI-scale gigawatt loads were a consideration. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">By contrast, NSW, South Australia and Victoria have each already published their own frameworks addressing these same questions. Tasmania&#8217;s inquiry is effectively writing the state&#8217;s first real rulebook for AI-scale load after the investment has already arrived \u2014 precisely the sequencing risk that critics of fast-moving data centre approvals across the country, including in Victoria&#8217;s own Geelong corridor, have been warning about.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Tasmania&#8217;s data centre policy to date is the\u00a0Data Centre Action Strategy, an investment attraction document last updated in 2018 by the Office of the Coordinator-General.<\/p>\n","protected":false},"author":90574,"featured_media":467392,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[18607,273,12785],"tags":[21027,10454],"class_list":["post-527582","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ai-news","category-australia","category-data-centre","tag-firmus","tag-launceston"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.1.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Tasmania&#039;s data centre policy to date is the Data Centre Action Strategy, an investment attraction document last updated in 2018 by the Office of the Coordinator-General.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Telco Analyst\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=527582\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.1.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Tasmania\u2019s AI data centre pipeline reaches 400MW\" \/>\n\t\t<meta property=\"og:description\" content=\"Tasmania&#039;s data centre policy to date is the Data Centre Action Strategy, an investment attraction document last updated in 2018 by the Office of the Coordinator-General.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=527582\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/07\/image_2026-07-01_154538233.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/07\/image_2026-07-01_154538233.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t\t<meta property=\"og:image:height\" content=\"531\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-09-03T00:43:39+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-09-03T00:43:50+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Tasmania\u2019s AI data centre pipeline reaches 400MW\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Tasmania&#039;s data centre policy to date is the Data Centre Action Strategy, an investment attraction document last updated in 2018 by the Office of the Coordinator-General.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/07\/image_2026-07-01_154538233.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=527582#blogposting\",\"name\":\"Tasmania\\u2019s AI data centre pipeline reaches 400MW\",\"headline\":\"Tasmania&#8217;s AI data centre pipeline reaches 400MW\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=90574#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/image_2026-07-01_154538233.png\",\"width\":800,\"height\":531,\"caption\":\"Under-construction data centre with cranes overhead and a lit building marked 'DATA CENTRE' at sunset\\\/dusk.\"},\"datePublished\":\"2026-09-03T10:43:39+10:00\",\"dateModified\":\"2026-09-03T10:43:50+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=527582#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=527582#webpage\"},\"articleSection\":\"AI News, Australia, Data Centre, Firmus, Launceston\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=527582#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=273#listItem\",\"name\":\"Australia\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=273#listItem\",\"position\":2,\"name\":\"Australia\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=273\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=527582#listItem\",\"name\":\"Tasmania&#8217;s AI data centre pipeline reaches 400MW\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=527582#listItem\",\"position\":3,\"name\":\"Tasmania&#8217;s AI data centre pipeline reaches 400MW\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=273#listItem\",\"name\":\"Australia\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=527582\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=527582\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=90574#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=90574\",\"name\":\"Telco Analyst\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=527582#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/223a29ff455a766a9ceca4c2dc0352aa8baef27c37eba4cf388f9d8bb7abff7e?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Telco Analyst\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=527582#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=527582\",\"name\":\"Tasmania\\u2019s AI data centre pipeline reaches 400MW\",\"description\":\"Tasmania's data centre policy to date is the Data Centre Action Strategy, an investment attraction document last updated in 2018 by the Office of the Coordinator-General.\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=527582#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=90574#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=90574#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/image_2026-07-01_154538233.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=527582\\\/#mainImage\",\"width\":800,\"height\":531,\"caption\":\"Under-construction data centre with cranes overhead and a lit building marked 'DATA CENTRE' at sunset\\\/dusk.\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=527582#mainImage\"},\"datePublished\":\"2026-09-03T10:43:39+10:00\",\"dateModified\":\"2026-09-03T10:43:50+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Tasmania\u2019s AI data centre pipeline reaches 400MW<\/title>\n\n","aioseo_head_json":{"title":"Tasmania\u2019s AI data centre pipeline reaches 400MW","description":"Tasmania's data centre policy to date is the Data Centre Action Strategy, an investment attraction document last updated in 2018 by the Office of the Coordinator-General.","canonical_url":"https:\/\/www.vibewire.com.au\/?p=527582","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=527582#blogposting","name":"Tasmania\u2019s AI data centre pipeline reaches 400MW","headline":"Tasmania&#8217;s AI data centre pipeline reaches 400MW","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=90574#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/07\/image_2026-07-01_154538233.png","width":800,"height":531,"caption":"Under-construction data centre with cranes overhead and a lit building marked 'DATA CENTRE' at sunset\/dusk."},"datePublished":"2026-09-03T10:43:39+10:00","dateModified":"2026-09-03T10:43:50+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=527582#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=527582#webpage"},"articleSection":"AI News, Australia, Data Centre, Firmus, Launceston"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=527582#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=273#listItem","name":"Australia"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=273#listItem","position":2,"name":"Australia","item":"https:\/\/www.vibewire.com.au\/?cat=273","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=527582#listItem","name":"Tasmania&#8217;s AI data centre pipeline reaches 400MW"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=527582#listItem","position":3,"name":"Tasmania&#8217;s AI data centre pipeline reaches 400MW","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=273#listItem","name":"Australia"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=527582\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=527582\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=90574#author","url":"https:\/\/www.vibewire.com.au\/?author=90574","name":"Telco Analyst","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=527582#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/223a29ff455a766a9ceca4c2dc0352aa8baef27c37eba4cf388f9d8bb7abff7e?s=96&d=mm&r=g","width":96,"height":96,"caption":"Telco Analyst"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=527582#webpage","url":"https:\/\/www.vibewire.com.au\/?p=527582","name":"Tasmania\u2019s AI data centre pipeline reaches 400MW","description":"Tasmania's data centre policy to date is the Data Centre Action Strategy, an investment attraction document last updated in 2018 by the Office of the Coordinator-General.","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=527582#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=90574#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=90574#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/07\/image_2026-07-01_154538233.png","@id":"https:\/\/www.vibewire.com.au\/?p=527582\/#mainImage","width":800,"height":531,"caption":"Under-construction data centre with cranes overhead and a lit building marked 'DATA CENTRE' at sunset\/dusk."},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=527582#mainImage"},"datePublished":"2026-09-03T10:43:39+10:00","dateModified":"2026-09-03T10:43:50+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Tasmania\u2019s AI data centre pipeline reaches 400MW","og:description":"Tasmania's data centre policy to date is the Data Centre Action Strategy, an investment attraction document last updated in 2018 by the Office of the Coordinator-General.","og:url":"https:\/\/www.vibewire.com.au\/?p=527582","og:image":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/07\/image_2026-07-01_154538233.png","og:image:secure_url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/07\/image_2026-07-01_154538233.png","og:image:width":"800","og:image:height":"531","article:published_time":"2026-09-03T00:43:39+00:00","article:modified_time":"2026-09-03T00:43:50+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Tasmania\u2019s AI data centre pipeline reaches 400MW","twitter:description":"Tasmania's data centre policy to date is the Data Centre Action Strategy, an investment attraction document last updated in 2018 by the Office of the Coordinator-General.","twitter:creator":"@VibewireCentral","twitter:image":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/07\/image_2026-07-01_154538233.png"},"aioseo_meta_data":{"post_id":"527582","title":"#post_title","description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":"#post_title","og_description":"#post_excerpt","og_object_type":"default","og_image_type":"featured","og_image_url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/07\/image_2026-07-01_154538233.png","og_image_width":"800","og_image_height":"531","og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":true,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"seo_analyzer_scan_date":"2026-09-03 00:50:28","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-09-02 07:27:24","updated":"2026-09-03 00:50:28","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=273\" title=\"Australia\">Australia<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tTasmania\u2019s AI data centre pipeline reaches 400MW\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Australia","link":"https:\/\/www.vibewire.com.au\/?cat=273"},{"label":"Tasmania&#8217;s AI data centre pipeline reaches 400MW","link":"https:\/\/www.vibewire.com.au\/?p=527582"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/527582","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/90574"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=527582"}],"version-history":[{"count":3,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/527582\/revisions"}],"predecessor-version":[{"id":528488,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/527582\/revisions\/528488"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/media\/467392"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=527582"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=527582"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=527582"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}