{"id":520759,"date":"2026-08-26T18:39:42","date_gmt":"2026-08-26T08:39:42","guid":{"rendered":"https:\/\/www.railfreight.com\/?p=73778"},"modified":"2026-08-26T18:39:42","modified_gmt":"2026-08-26T08:39:42","slug":"first-tube-of-brenner-base-tunnel-is-now-fully-excavated","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=520759","title":{"rendered":"First tube of Brenner Base Tunnel is now fully excavated"},"content":{"rendered":"<p><strong>The western main tube of the future Brenner Base Tunnel (BBT), running between Italy and Austria, has been dug all the way from Fortezza to the Sill Gorge near Innsbruck. With the final work carried out, \u201cnumerous individual tunnel sections have now been joined to form one continuous main tunnel\u201d, BBT said.<\/strong><br \/>\n<span id=\"more-73778\"><\/span>The protagonist of this story was Wilma, the tunnel-boring machine (TBM) that was deployed to dig 7.5 kilometres of tunnel in the H53 Pfons-Brenner lot. This beast, deployed in September 2024, is made up of 80,000 individual components for a total weight of 2,700 tonnes and 180 metres in length.<\/p>\n<h2>Excavations almost complete<\/h2>\n<p>The completion of the 55-kilometre west tube follows another recent milestone. At the end of July, the Austrian and Italian teams <a href=\"https:\/\/www.railfreight.com\/infrastructure\/2026\/07\/29\/italy-and-austria-meet-under-the-alps-as-brenner-tunnel-excavations-near-end\/\"  rel=\"noopener\">met under the mountain<\/a> with the destruction of the last rocks separating the two countries. Now, only a short stretch in the east tunnel still remains to be dug.<\/p>\n<p>Highlighting the complexity of this project is the fact that it took over 700 days to complete the excavation. In other words, the TBM excavated around 10 metres per day on average. Still, TBMs are much faster than the traditional blasting method, which usually allows for a daily progress of 5 metres.<\/p>\n<figure style=\"max-width: 100%; margin: 20px auto; border-radius: 6px; overflow: hidden; box-shadow: 0 2px 8px rgba(0, 0, 0, 0.1);\"><img fetchpriority=\"high\" decoding=\"async\" class=\"fluid alignnone wp-image-73781\" style=\"width: 100%; height: auto; display: block;\" src=\"https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/08\/BBT-programme.jpeg\" alt=\"In green, the section of the east tunnel that still needs to be excavated. Image: \u00a9 BBT\" width=\"1920\" height=\"681\" srcset=\"https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/08\/BBT-programme.jpeg 1920w, https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/08\/BBT-programme-480x170.jpeg 480w, https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/08\/BBT-programme-768x272.jpeg 768w, https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/08\/BBT-programme-1536x545.jpeg 1536w, https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/08\/BBT-programme-1024x363.jpeg 1024w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><figcaption style=\"padding: 10px 15px; font-size: 14px; background: #f8f8f8; text-align: left; color: #555;\">In green, the section of the east tunnel that still needs to be excavated. Image: \u00a9 BBT-SE<\/figcaption><\/figure>\n<p>TBMs were mostly used in the Italian section. Their advantage is that the lining of the tubes can be installed directly after digging, while the blasting method entails more steps making the process longer. \u201cThe tubbing segments, each weighing around ten tonnes, were transported by rail to the construction site via the Wolf rail link and then made ready for installation in the tunnel boring machine\u201d, BBT explained.<\/p>\n<h2>A much needed infrastructure<\/h2>\n<p>The Brenner Base Tunnel should be ready to welcome its first trains in 2032. Currently, convoys have to run along the historical line, which is one of the steepest in Europe and comes with speed and weight restrictions. The BBT will create a flatter link beneath the Alps, allowing trains to be heavier and travel faster.<\/p>\n<p>Rail freight should significantly benefit from the new infrastructure, as the tunnel is part of the TEN-T Scandinavian-Mediterranean Corridor, running from southern Italy to Sweden and Norway. However, a hiccup remains. Germany does not seem too interested in creating <a href=\"https:\/\/www.railfreight.com\/infrastructure\/2026\/08\/05\/germany-proposes-brenner-access-routes-completion-in-2043\/\"  rel=\"noopener\">access routes to the BBT<\/a> before the mid-2040s, 10 years after the tunnel is expected to open.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The western main tube of the future Brenner Base Tunnel (BBT), running between Italy and Austria, has been dug all the way from Fortezza to\u2026<\/p>\n","protected":false},"author":9,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[343,471,47],"tags":[12634],"class_list":["post-520759","post","type-post","status-publish","format-standard","hentry","category-infrastructure","category-news","category-rail-news","tag-railfreight"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"The western main tube of the future Brenner Base Tunnel (BBT), running between Italy and Austria, has been dug all the way from Fortezza to\u2026\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Marco Raimondi\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=520759\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"First tube of Brenner Base Tunnel is now fully excavated - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"The western main tube of the future Brenner Base Tunnel (BBT), running between Italy and Austria, has been dug all the way from Fortezza to\u2026\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=520759\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-08-26T08:39:42+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-08-26T08:39:42+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"First tube of Brenner Base Tunnel is now fully excavated - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The western main tube of the future Brenner Base Tunnel (BBT), running between Italy and Austria, has been dug all the way from Fortezza to\u2026\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=520759#blogposting\",\"name\":\"First tube of Brenner Base Tunnel is now fully excavated - VibeWire Magazine\",\"headline\":\"First tube of Brenner Base Tunnel is now fully excavated\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.railfreight.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/BBT-programme.jpeg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=520759\\\/#articleImage\"},\"datePublished\":\"2026-08-26T18:39:42+10:00\",\"dateModified\":\"2026-08-26T18:39:42+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=520759#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=520759#webpage\"},\"articleSection\":\"Infrastructure, News, Rail News, RailFreight\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=520759#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=520759#listItem\",\"name\":\"First tube of Brenner Base Tunnel is now fully excavated\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=520759#listItem\",\"position\":3,\"name\":\"First tube of Brenner Base Tunnel is now fully excavated\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=520759\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=520759\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9\",\"name\":\"Marco Raimondi\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=520759#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fc241b4d8352e3e7ca08ec32c4ebd712ae862e0499265d83515e97acb5510625?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Marco Raimondi\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=520759#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=520759\",\"name\":\"First tube of Brenner Base Tunnel is now fully excavated - VibeWire Magazine\",\"description\":\"The western main tube of the future Brenner Base Tunnel (BBT), running between Italy and Austria, has been dug all the way from Fortezza to\\u2026\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=520759#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9#author\"},\"datePublished\":\"2026-08-26T18:39:42+10:00\",\"dateModified\":\"2026-08-26T18:39:42+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>First tube of Brenner Base Tunnel is now fully excavated - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"First tube of Brenner Base Tunnel is now fully excavated - VibeWire Magazine","description":"The western main tube of the future Brenner Base Tunnel (BBT), running between Italy and Austria, has been dug all the way from Fortezza to\u2026","canonical_url":"https:\/\/www.vibewire.com.au\/?p=520759","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=520759#blogposting","name":"First tube of Brenner Base Tunnel is now fully excavated - VibeWire Magazine","headline":"First tube of Brenner Base Tunnel is now fully excavated","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=9#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/08\/BBT-programme.jpeg","@id":"https:\/\/www.vibewire.com.au\/?p=520759\/#articleImage"},"datePublished":"2026-08-26T18:39:42+10:00","dateModified":"2026-08-26T18:39:42+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=520759#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=520759#webpage"},"articleSection":"Infrastructure, News, Rail News, RailFreight"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=520759#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=520759#listItem","name":"First tube of Brenner Base Tunnel is now fully excavated"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=520759#listItem","position":3,"name":"First tube of Brenner Base Tunnel is now fully excavated","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=520759\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=520759\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=9#author","url":"https:\/\/www.vibewire.com.au\/?author=9","name":"Marco Raimondi","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=520759#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/fc241b4d8352e3e7ca08ec32c4ebd712ae862e0499265d83515e97acb5510625?s=96&d=mm&r=g","width":96,"height":96,"caption":"Marco Raimondi"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=520759#webpage","url":"https:\/\/www.vibewire.com.au\/?p=520759","name":"First tube of Brenner Base Tunnel is now fully excavated - VibeWire Magazine","description":"The western main tube of the future Brenner Base Tunnel (BBT), running between Italy and Austria, has been dug all the way from Fortezza to\u2026","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=520759#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=9#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=9#author"},"datePublished":"2026-08-26T18:39:42+10:00","dateModified":"2026-08-26T18:39:42+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"First tube of Brenner Base Tunnel is now fully excavated - VibeWire Magazine","og:description":"The western main tube of the future Brenner Base Tunnel (BBT), running between Italy and Austria, has been dug all the way from Fortezza to\u2026","og:url":"https:\/\/www.vibewire.com.au\/?p=520759","article:published_time":"2026-08-26T08:39:42+00:00","article:modified_time":"2026-08-26T08:39:42+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"First tube of Brenner Base Tunnel is now fully excavated - VibeWire Magazine","twitter:description":"The western main tube of the future Brenner Base Tunnel (BBT), running between Italy and Austria, has been dug all the way from Fortezza to\u2026","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"520759","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-08-26 08:50:37","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2026-08-26 08:50:17","updated":"2026-08-26 08:50:37","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tFirst tube of Brenner Base Tunnel is now fully excavated\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"First tube of Brenner Base Tunnel is now fully excavated","link":"https:\/\/www.vibewire.com.au\/?p=520759"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/520759","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=520759"}],"version-history":[{"count":5,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/520759\/revisions"}],"predecessor-version":[{"id":520796,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/520759\/revisions\/520796"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=520759"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=520759"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=520759"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}