{"id":518424,"date":"2026-08-24T18:55:24","date_gmt":"2026-08-24T08:55:24","guid":{"rendered":"https:\/\/www.railfreight.com\/?p=73731"},"modified":"2026-08-24T18:55:24","modified_gmt":"2026-08-24T08:55:24","slug":"european-rail-freight-has-reached-disruption-limit","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=518424","title":{"rendered":"\u2018European rail freight has reached disruption limit\u2019"},"content":{"rendered":"<p><strong>All across Europe, countries are working to improve their rail infrastructure. This also means that there are many closures, capacity restrictions and associated effects on businesses. Even though European rail freight recognises the need for infrastructure works, the industry has had enough of the large number of simultaneous hindrances. \u201cThe limit has been reached\u201d.<\/strong><br \/>\n<span id=\"more-73731\"><\/span>Railway undertakings and operators are currently facing severe capacity restrictions on European networks. This is the result of a combination of last-minute changes to line closures, low-quality or a complete lack of alternative routes, simultaneous works and poor cross-border coordination, says industry association ERFA.<\/p>\n<p>As a consequence, operating reliably on the rail network is becoming increasingly difficult, says ERFA. For customers, trusting rail is also proving to be a challenge. \u201cThis is no longer an operational problem for railway undertakings\u201d, adds ERFA. \u201cIt is a threat to European supply chains, industrial competitiveness, the Single Market and Europe&#8217;s ambition to shift freight from road to rail.<\/p>\n<p>Rail undertakings acknowledge that infrastructure works are a necessity in order to maintain network performance and upgrade it. Still, their method of implementation remains a problem, according to ERFA.<\/p>\n<figure style=\"max-width: 100%; margin: 20px auto; border-radius: 6px; overflow: hidden; box-shadow: 0 2px 8px rgba(0, 0, 0, 0.1);\"><img fetchpriority=\"high\" decoding=\"async\" class=\"fluid alignnone\" style=\"width: 100%; height: auto; display: block;\" src=\"https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/08\/unnamed-2.jpeg\" alt=\"Rail (TEN-T) map of Europe, with recent closures as of the summer of 2026.\" width=\"816\" height=\"720\" \/><figcaption style=\"padding: 10px 15px; font-size: 14px; background: #f8f8f8; text-align: left; color: #555;\">Rail (TEN-T) map of Europe, with recent closures as of the summer of 2026. Image: \u00a9 ERFA<\/figcaption><\/figure>\n<h2>Rail freight cannot stretch it any further<\/h2>\n<p>The association points out that rail businesses are already under pressure to deliver reliable, punctual and climate-friendly services. They face strong competition from other modes of transport. The ongoing infrastructure works are not helping in that regard. Rather, some businesses are risking bankruptcy due to the challenging operational environment. \u201cThere is a limit to how much disruption and losses the sector can absorb. That limit has been reached\u201d, says ERFA.<\/p>\n<p>The rail-road Combined Transport association UIRR paints a similar picture. It laments the uncoordinated infrastructure works and underperforming alternative routes. This, according to UIRR, leads to higher costs and lower transport quality. Moreover, with the energy crisis, chaos on the German network and extreme local weather factored in, the summer of 2026 has turned out highly complicated for both rail and combined transport.<\/p>\n<div style=\"border: 2px solid #0a4e7f; padding: 15px 20px 20px 20px; border-radius: 10px; background-color: #e7f1f8; margin: 20px 0;\">\n<h2>Inadequate alternative routes<\/h2>\n<p>One of the most often-heard concerns surrounding the infrastructure works is the quality of diversionary routes. ERFA cites some particular cases from Romania and Bulgaria: a diversionary route on the Vidin\u2013Golen\u021bi\u2013Craiova railway has a maximum speed of 30 km\/h due to the poor infrastructure condition. The Kardam\u2013Negru Vod\u0103 and Medgidia\u2013Negru Vod\u0103 detours cannot accommodate intermodal trains because of a weight restriction of 1,000 tonnes.<\/p>\n<\/div>\n<p>The list of issues is long: inadequate alternative routes, the need for more locomotives, additional staff training, more track charges to be paid, border delays, compromised supply chain security, and the resulting ever-feared reverse modal shift back to the road sector.<\/p>\n<h2>Four ideas to soften the blows<\/h2>\n<p>ERFA proposes four concrete measures to curb the impact of the many infrastructure disruptions. The association wants rail infrastructure managers to adopt a more customer-oriented approach. In practice, this means that they should involve the impact on rail freight much earlier in their planning process.<\/p>\n<p>Second, ERFA reiterates an often-heard wish among rail freight businesses: infrastructure managers should coordinate internationally in order to prevent simultaneous corridor closures.<\/p>\n<p>Third, the rail freight association believes that railway undertakings should receive monetary compensation for their additionally incurred costs. \u201cFreight RUs have to bear significant extra costs due to longer alternative routes and subsequent higher TACs while they lose clients due to poor reliability of the network. They should benefit from TAC reduction and dedicated support schemes to compensate for these higher costs\u201d, ERFA states.<\/p>\n<p>The EU\u2019s new State aid Land and Multimodal Transport Guidelines (LMTG), which has been applicable since 30 March 2026, allows this.<\/p>\n<p>Lastly, ERFA wants the expected positive impact from the EU\u2019s Capacity Regulation to come sooner. Currently, the first rail timetable under the <a href=\"https:\/\/www.railfreight.com\/policy\/2026\/05\/20\/european-parliament-gives-final-green-light-to-the-capacity-management-regulation\/\"  rel=\"noopener\">Capacity Regulation<\/a> is planned for 2031, but rail freight cannot wait that long, <a href=\"https:\/\/erfarail.eu\/news\/erfa-statement-on-closure-of-lines\"  rel=\"noopener\">says<\/a> ERFA. \u201cThey cannot wait another five years for meaningful improvements whereas they struggle for their survival and the financial equilibrium of their operators at this very moment. Progress is needed now.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>All across Europe, countries are working to improve their rail infrastructure. This also means that there are many closures, capacity restrictions and associated effects on\u2026<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[72,555,471,78,47,560],"tags":[12634],"class_list":["post-518424","post","type-post","status-publish","format-standard","hentry","category-business","category-erfa","category-news","category-rail-freight","category-rail-news","category-uirr","tag-railfreight"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"All across Europe, countries are working to improve their rail infrastructure. This also means that there are many closures, capacity restrictions and associated effects on\u2026\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=518424\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"\u2018European rail freight has reached disruption limit\u2019 - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"All across Europe, countries are working to improve their rail infrastructure. This also means that there are many closures, capacity restrictions and associated effects on\u2026\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=518424\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-08-24T08:55:24+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-08-24T08:55:24+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"\u2018European rail freight has reached disruption limit\u2019 - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"All across Europe, countries are working to improve their rail infrastructure. This also means that there are many closures, capacity restrictions and associated effects on\u2026\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=518424#blogposting\",\"name\":\"\\u2018European rail freight has reached disruption limit\\u2019 - VibeWire Magazine\",\"headline\":\"\\u2018European rail freight has reached disruption limit\\u2019\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.railfreight.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/unnamed-2.jpeg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=518424\\\/#articleImage\"},\"datePublished\":\"2026-08-24T18:55:24+10:00\",\"dateModified\":\"2026-08-24T18:55:24+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=518424#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=518424#webpage\"},\"articleSection\":\"Business, ERFA, News, Rail freight, Rail News, UIRR, RailFreight\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=518424#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=518424#listItem\",\"name\":\"\\u2018European rail freight has reached disruption limit\\u2019\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=518424#listItem\",\"position\":3,\"name\":\"\\u2018European rail freight has reached disruption limit\\u2019\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=518424\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=518424\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=518424#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=518424#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=518424\",\"name\":\"\\u2018European rail freight has reached disruption limit\\u2019 - VibeWire Magazine\",\"description\":\"All across Europe, countries are working to improve their rail infrastructure. This also means that there are many closures, capacity restrictions and associated effects on\\u2026\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=518424#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"datePublished\":\"2026-08-24T18:55:24+10:00\",\"dateModified\":\"2026-08-24T18:55:24+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>\u2018European rail freight has reached disruption limit\u2019 - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"\u2018European rail freight has reached disruption limit\u2019 - VibeWire Magazine","description":"All across Europe, countries are working to improve their rail infrastructure. This also means that there are many closures, capacity restrictions and associated effects on\u2026","canonical_url":"https:\/\/www.vibewire.com.au\/?p=518424","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=518424#blogposting","name":"\u2018European rail freight has reached disruption limit\u2019 - VibeWire Magazine","headline":"\u2018European rail freight has reached disruption limit\u2019","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/08\/unnamed-2.jpeg","@id":"https:\/\/www.vibewire.com.au\/?p=518424\/#articleImage"},"datePublished":"2026-08-24T18:55:24+10:00","dateModified":"2026-08-24T18:55:24+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=518424#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=518424#webpage"},"articleSection":"Business, ERFA, News, Rail freight, Rail News, UIRR, RailFreight"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=518424#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=518424#listItem","name":"\u2018European rail freight has reached disruption limit\u2019"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=518424#listItem","position":3,"name":"\u2018European rail freight has reached disruption limit\u2019","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=518424\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=518424\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=518424#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=518424#webpage","url":"https:\/\/www.vibewire.com.au\/?p=518424","name":"\u2018European rail freight has reached disruption limit\u2019 - VibeWire Magazine","description":"All across Europe, countries are working to improve their rail infrastructure. This also means that there are many closures, capacity restrictions and associated effects on\u2026","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=518424#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"datePublished":"2026-08-24T18:55:24+10:00","dateModified":"2026-08-24T18:55:24+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"\u2018European rail freight has reached disruption limit\u2019 - VibeWire Magazine","og:description":"All across Europe, countries are working to improve their rail infrastructure. This also means that there are many closures, capacity restrictions and associated effects on\u2026","og:url":"https:\/\/www.vibewire.com.au\/?p=518424","article:published_time":"2026-08-24T08:55:24+00:00","article:modified_time":"2026-08-24T08:55:24+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"\u2018European rail freight has reached disruption limit\u2019 - VibeWire Magazine","twitter:description":"All across Europe, countries are working to improve their rail infrastructure. This also means that there are many closures, capacity restrictions and associated effects on\u2026","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"518424","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-08-24 09:27:10","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2026-08-24 09:26:51","updated":"2026-08-24 09:27:10","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\u2018European rail freight has reached disruption limit\u2019\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"\u2018European rail freight has reached disruption limit\u2019","link":"https:\/\/www.vibewire.com.au\/?p=518424"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/518424","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=518424"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/518424\/revisions"}],"predecessor-version":[{"id":518425,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/518424\/revisions\/518425"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=518424"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=518424"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=518424"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}