{"id":51678,"date":"2024-05-23T20:41:26","date_gmt":"2024-05-23T10:41:26","guid":{"rendered":"https:\/\/www.railfreight.com\/?p=52770"},"modified":"2024-05-23T20:41:26","modified_gmt":"2024-05-23T10:41:26","slug":"baku-tbilisi-kars-railway-is-officially-open-again-after-year-long-closure","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=51678","title":{"rendered":"Baku-Tbilisi-Kars railway is officially open again after year-long closure"},"content":{"rendered":"<p><strong>The Baku-Tbilisi-Kars railway was subject to significant upgrades targeting its capacity for roughly a year. With most work concluded in early March, the railway was expected to restart operations in late May 2024. The expectations turned into reality, and as a result, the BTK line saw its first freight train running after a long time.<\/strong><br \/>\n<span id=\"more-52770\"><\/span>For the record, the train inaugurating the upgraded BTK ran between Azerbaijan (Absheron Logistics Centre) and Georgia. It departed on 20 May and carried 20 containers.<\/p>\n<p>This is supposed to be the first of the many trains to transit the refurbished line. After all, according to Azerbaijan Railways, which was actively involved in the reconstruction, the line\u2019s capacity should now increase from 1 to 5 million tons of cargo per year, meaning that the total number of freight trains travelling along the BTK will increase substantially compared to the past.<\/p>\n<h2>Joint venture to manage operations<\/h2>\n<p>The line\u2019s upgrade included repair, reconstruction, and construction works along a 183-kilometre stretch, which is now complete. It should be noted that the project was split into five parts, all of which were located in Georgia.<br \/>\nThe fifth part of the project is not concerned with the line upgrade but rather the construction of a 110-hectare logistics complex in Akhalkalaki, near the Georgian-Turkish border.<\/p>\n<p>\u201cFollowing the project\u2019s completion, a joint venture should be established between Azerbaijan and Georgia to efficiently manage operations on the BTK and attract new cargo. Respective work has already begun, and the establishment of a joint venture is expected soon,\u201d commented Azerbaijan Railways chairman Rovshan Rustamov.<\/p>\n<p><strong>Also read:<\/strong><\/p>\n<ul>\n<li>\n<p class=\"summary-title\"><a class=\"summary-link\" href=\"https:\/\/www.railfreight.com\/railfreight\/2024\/05\/06\/baku-tblisi-kars-railway-to-open-for-traffic-in-two-weeks\/\">Baku-Tbilisi-Kars railway to open for traffic in two weeks<\/a><\/p>\n<\/li>\n<li>\n<p class=\"summary-title\"><a class=\"summary-link\" href=\"https:\/\/www.railfreight.com\/beltandroad\/2024\/03\/07\/baku-tbilisi-kars-railway-opens-in-april-after-major-refurbishment\/\">Baku-Tbilisi-Kars railway opens in April after major refurbishment<\/a><\/p>\n<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The Baku-Tbilisi-Kars railway was subject to significant upgrades targeting its capacity for roughly a year. With most work concluded in early March, the railway was expected to restart operations in late May 2024. The expectations turned into reality, and as a result, the BTK line saw its first freight train running after a long time.\u2026<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[1837,5859,5860,9630,5862,5863,343],"tags":[],"class_list":["post-51678","post","type-post","status-publish","format-standard","hentry","category-azerbaijan","category-azerbaijan-railways","category-baku-tblisi-kars-railway","category-btk-line","category-georgia","category-georgian-railways","category-infrastructure"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.9 - aioseo.com -->\n\t<meta name=\"description\" content=\"The Baku-Tbilisi-Kars railway was subject to significant upgrades targeting its capacity for roughly a year. With most work concluded in early March, the railway was expected to restart operations in late May 2024. The expectations turned into reality, and as a result, the BTK line saw its first freight train running after a long time.\u2026\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Nikos Papatolios\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=51678\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.9\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Baku-Tbilisi-Kars railway is officially open again after year-long closure - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"The Baku-Tbilisi-Kars railway was subject to significant upgrades targeting its capacity for roughly a year. With most work concluded in early March, the railway was expected to restart operations in late May 2024. The expectations turned into reality, and as a result, the BTK line saw its first freight train running after a long time.\u2026\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=51678\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-05-23T10:41:26+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-05-23T10:41:26+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Baku-Tbilisi-Kars railway is officially open again after year-long closure - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The Baku-Tbilisi-Kars railway was subject to significant upgrades targeting its capacity for roughly a year. With most work concluded in early March, the railway was expected to restart operations in late May 2024. The expectations turned into reality, and as a result, the BTK line saw its first freight train running after a long time.\u2026\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=51678#blogposting\",\"name\":\"Baku-Tbilisi-Kars railway is officially open again after year-long closure - VibeWire Magazine\",\"headline\":\"Baku-Tbilisi-Kars railway is officially open again after year-long closure\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=8#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#articleImage\",\"width\":1028,\"height\":930},\"datePublished\":\"2024-05-23T20:41:26+10:00\",\"dateModified\":\"2024-05-23T20:41:26+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=51678#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=51678#webpage\"},\"articleSection\":\"Azerbaijan, Azerbaijan Railways, Baku-Tblisi-Kars Railway, BTK Line, Georgia, Georgian Railways, Infrastructure\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=51678#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=343#listItem\",\"name\":\"Infrastructure\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=343#listItem\",\"position\":2,\"name\":\"Infrastructure\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=343\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=51678#listItem\",\"name\":\"Baku-Tbilisi-Kars railway is officially open again after year-long closure\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=51678#listItem\",\"position\":3,\"name\":\"Baku-Tbilisi-Kars railway is officially open again after year-long closure\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=343#listItem\",\"name\":\"Infrastructure\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=51678\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=51678\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=8#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=8\",\"name\":\"Nikos Papatolios\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=51678#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1a500194194ab0ba1c494278fc8e46b42cc4869fa16b45d69781e49fb589e8a6?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Nikos Papatolios\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=51678#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=51678\",\"name\":\"Baku-Tbilisi-Kars railway is officially open again after year-long closure - VibeWire Magazine\",\"description\":\"The Baku-Tbilisi-Kars railway was subject to significant upgrades targeting its capacity for roughly a year. With most work concluded in early March, the railway was expected to restart operations in late May 2024. The expectations turned into reality, and as a result, the BTK line saw its first freight train running after a long time.\\u2026\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=51678#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=8#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=8#author\"},\"datePublished\":\"2024-05-23T20:41:26+10:00\",\"dateModified\":\"2024-05-23T20:41:26+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Baku-Tbilisi-Kars railway is officially open again after year-long closure - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Baku-Tbilisi-Kars railway is officially open again after year-long closure - VibeWire Magazine","description":"The Baku-Tbilisi-Kars railway was subject to significant upgrades targeting its capacity for roughly a year. With most work concluded in early March, the railway was expected to restart operations in late May 2024. The expectations turned into reality, and as a result, the BTK line saw its first freight train running after a long time.\u2026","canonical_url":"https:\/\/www.vibewire.com.au\/?p=51678","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=51678#blogposting","name":"Baku-Tbilisi-Kars railway is officially open again after year-long closure - VibeWire Magazine","headline":"Baku-Tbilisi-Kars railway is officially open again after year-long closure","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=8#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/#articleImage","width":1028,"height":930},"datePublished":"2024-05-23T20:41:26+10:00","dateModified":"2024-05-23T20:41:26+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=51678#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=51678#webpage"},"articleSection":"Azerbaijan, Azerbaijan Railways, Baku-Tblisi-Kars Railway, BTK Line, Georgia, Georgian Railways, Infrastructure"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=51678#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=343#listItem","name":"Infrastructure"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=343#listItem","position":2,"name":"Infrastructure","item":"https:\/\/www.vibewire.com.au\/?cat=343","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=51678#listItem","name":"Baku-Tbilisi-Kars railway is officially open again after year-long closure"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=51678#listItem","position":3,"name":"Baku-Tbilisi-Kars railway is officially open again after year-long closure","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=343#listItem","name":"Infrastructure"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=51678\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=51678\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=8#author","url":"https:\/\/www.vibewire.com.au\/?author=8","name":"Nikos Papatolios","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=51678#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/1a500194194ab0ba1c494278fc8e46b42cc4869fa16b45d69781e49fb589e8a6?s=96&d=mm&r=g","width":96,"height":96,"caption":"Nikos Papatolios"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=51678#webpage","url":"https:\/\/www.vibewire.com.au\/?p=51678","name":"Baku-Tbilisi-Kars railway is officially open again after year-long closure - VibeWire Magazine","description":"The Baku-Tbilisi-Kars railway was subject to significant upgrades targeting its capacity for roughly a year. With most work concluded in early March, the railway was expected to restart operations in late May 2024. The expectations turned into reality, and as a result, the BTK line saw its first freight train running after a long time.\u2026","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=51678#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=8#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=8#author"},"datePublished":"2024-05-23T20:41:26+10:00","dateModified":"2024-05-23T20:41:26+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Baku-Tbilisi-Kars railway is officially open again after year-long closure - VibeWire Magazine","og:description":"The Baku-Tbilisi-Kars railway was subject to significant upgrades targeting its capacity for roughly a year. With most work concluded in early March, the railway was expected to restart operations in late May 2024. The expectations turned into reality, and as a result, the BTK line saw its first freight train running after a long time.\u2026","og:url":"https:\/\/www.vibewire.com.au\/?p=51678","article:published_time":"2024-05-23T10:41:26+00:00","article:modified_time":"2024-05-23T10:41:26+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Baku-Tbilisi-Kars railway is officially open again after year-long closure - VibeWire Magazine","twitter:description":"The Baku-Tbilisi-Kars railway was subject to significant upgrades targeting its capacity for roughly a year. With most work concluded in early March, the railway was expected to restart operations in late May 2024. The expectations turned into reality, and as a result, the BTK line saw its first freight train running after a long time.\u2026","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"51678","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-06-20 20:06:46","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-05-23 11:24:03","updated":"2026-06-20 20:06:46"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=343\" title=\"Infrastructure\">Infrastructure<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tBaku-Tbilisi-Kars railway is officially open again after year-long closure\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Infrastructure","link":"https:\/\/www.vibewire.com.au\/?cat=343"},{"label":"Baku-Tbilisi-Kars railway is officially open again after year-long closure","link":"https:\/\/www.vibewire.com.au\/?p=51678"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/51678","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=51678"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/51678\/revisions"}],"predecessor-version":[{"id":51679,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/51678\/revisions\/51679"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=51678"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=51678"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=51678"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}