{"id":510762,"date":"2026-08-17T17:26:17","date_gmt":"2026-08-17T07:26:17","guid":{"rendered":"https:\/\/www.railfreight.com\/?p=73541"},"modified":"2026-08-17T17:26:17","modified_gmt":"2026-08-17T07:26:17","slug":"oxfordshire-rail-freight-interchange-accepted-for-examination","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=510762","title":{"rendered":"Oxfordshire rail freight interchange accepted for examination"},"content":{"rendered":"<p><strong>The proposed \u00a31.5 billion (\u20ac1.76bn) Oxfordshire Strategic Rail Freight Interchange (OxSRFI) has been accepted for examination under the formal Development Consent Order (DCO) examination process. This is a high-level planning permission used for a project considered large and important enough to be a Nationally Significant Infrastructure Project (NSIP). <\/strong><br \/>\n<span id=\"more-73541\"><\/span>Following the UK Government\u2019s Planning Inspectorate\u2019s acceptance of the application in April 2026, the project has now moved into this critical phase of scrutiny. The scheme, promoted by Oxfordshire Railfreight Limited (a special-purpose vehicle established by the developers, Mountpark), aims to deliver a large-scale rail-connected distribution hub. The overall development remains a significant infrastructure proposal within the competitive UK logistics market.<\/p>\n<p>A new intermodal terminal just north of Bicester and the East West Rail has taken another step towards being realised. There are, however, diverse views on the development &#8211; both in favour and in opposition. Mountpark argues that the interchange will deliver substantial economic benefits to the Oxford-Cambridge Growth Corridor. Mountpark anticipates the project could generate over 9,000 jobs and contribute \u00a3361.2 million annually to the national economy.<\/p>\n<p>The proposal includes a terminal linked to the Chiltern Main Line, alongside 603,850 square metres of distribution space. Supporters claim this infrastructure is essential for moving freight from road to rail, supporting a low-carbon transport network. However, that support is far from universal, as is almost always the case with large-scale logistics developments.<\/p>\n<h2>Planning authorities and formal scrutiny<\/h2>\n<p>The planning committee of the local administration, <a href=\"https:\/\/modgov.cherwell.gov.uk\/ieListDocuments.aspx?CId=117&amp;MeetingId=4475&amp;utm\"  rel=\"noopener\">Cherwell District Council<\/a>, has submitted a Relevant Representation and requested registration as an Interested Party in the Examination. While the Council remains broadly supportive of the principle of rail-led economic growth, it has formally highlighted several environmental and landscape concerns. The Council\u2019s participation ensures these issues will be robustly tested throughout the upcoming six-month examination period.<\/p>\n<figure style=\"max-width: 100%; margin: 20px auto; border-radius: 6px; overflow: hidden; box-shadow: 0 2px 8px rgba(0, 0, 0, 0.1);\"><img fetchpriority=\"high\" decoding=\"async\" class=\"fluid alignnone wp-image-42486\" style=\"width: 100%; height: auto; display: block;\" src=\"https:\/\/www.railfreight.com\/wp-content\/uploads\/2023\/04\/OxSRFI-OpenStreetMap-scaled.jpg\" alt=\"Map showing location of the Oxford SRFI proposals\" width=\"960\" height=\"640\" srcset=\"https:\/\/www.railfreight.com\/wp-content\/uploads\/2023\/04\/OxSRFI-OpenStreetMap-scaled.jpg 2560w, https:\/\/www.railfreight.com\/wp-content\/uploads\/2023\/04\/OxSRFI-OpenStreetMap-336x224.jpg 336w, https:\/\/www.railfreight.com\/wp-content\/uploads\/2023\/04\/OxSRFI-OpenStreetMap-480x320.jpg 480w, https:\/\/www.railfreight.com\/wp-content\/uploads\/2023\/04\/OxSRFI-OpenStreetMap-768x512.jpg 768w, https:\/\/www.railfreight.com\/wp-content\/uploads\/2023\/04\/OxSRFI-OpenStreetMap-1536x1023.jpg 1536w, https:\/\/www.railfreight.com\/wp-content\/uploads\/2023\/04\/OxSRFI-OpenStreetMap-2048x1364.jpg 2048w, https:\/\/www.railfreight.com\/wp-content\/uploads\/2023\/04\/OxSRFI-OpenStreetMap-1024x682.jpg 1024w\" sizes=\"(max-width: 960px) 100vw, 960px\" \/><figcaption style=\"padding: 10px 15px; font-size: 14px; background: #f8f8f8; text-align: left; color: #555;\">OpenStreetMap showing location of the Oxford SRFI proposals. Image: \u00a9 OpenStreetMap<\/figcaption><\/figure>\n<p>The proposed site covers a substantial area. In addition to any new rail tracks, the logistics development would include significant road infrastructure works. The Council has also raised concerns regarding the preservation of historic landscape character and the impacts on local tranquil areas.<\/p>\n<h2>Environmental opposition intensifies<\/h2>\n<p>Environmental campaigners have also moved to challenge the scale and necessity of the project. The Oxfordshire branch of the influential <a href=\"https:\/\/www.cpre.org.uk\/\"  rel=\"noopener\">Campaign for the Protection of Rural England<\/a> (CPRE) has formally registered its opposition. CPRE has questioned the fundamental justification for the scheme. The organisation argues that the proposal functions primarily as a massive warehousing and road-development project. While they support the principle of rail freight, they contend that this specific application does not provide sufficient environmental justification for the loss of agricultural land and veteran trees.<\/p>\n<p>The debate underscores a growing tension between national logistics requirements and local environmental protection. Critics argue that the proposed mitigation measures and potential for modal shift are inadequately assessed against the project&#8217;s physical impact. The examination phase will now require the developer to defend these technical projections. Stakeholders are particularly focused on the effectiveness of highway mitigation and the long-term impact on the surrounding countryside, as well as the scheme\u2019s actual carbon reduction credentials.<\/p>\n<h2>Operational focus and future milestones<\/h2>\n<p>The application reveals a deep integration with industry partners. The developers specifically identify <a href=\"https:\/\/oxsrfi.co.uk\/wp-content\/upload\/2025\/09\/Doc-7.2B-GBRF-Statement.pdf\"  rel=\"noopener\">GB Railfreight\u2019s involvement<\/a> in the design and approach to the terminal. GB Railfreight, which is currently testing its smart new <a href=\"https:\/\/www.railfreight.com\/railfreight\/2026\/07\/30\/gb-railfreights-class-99-electro-diesel-locos-begin-entering-commercial-service\/\"  rel=\"noopener\">Class 99 locomotives<\/a>, has been closely involved in the terminal&#8217;s design, and its supporting statement says it has an agreement with Oxfordshire Railfreight Limited to operate <a href=\"https:\/\/www.railfreight.com\/railfreight\/2026\/04\/07\/missed-opportunity-for-oxsrfi-heyford-park-town-status-proposal-dropped\/\"  rel=\"noopener\">the proposed terminal<\/a>. Operational details remain a focal point, with the project noting links to deep-sea ports like Felixstowe and London Gateway. Network Rail&#8217;s assessment of network capacity and the proposed connection will also be important to the terminal&#8217;s eventual operation.<\/p>\n<p>The Planning Inspectorate is now coordinating the programme for the examination, with a formal schedule expected to begin later this summer. Following the conclusion of the six-month examination, the Inspectorate will spend up to three months forming a recommendation. The final decision rests with the Secretary of State, but Mountpark anticipates a conclusion in mid-2027. This process will ultimately decide if the project meets the required standards for a Nationally Significant Infrastructure Project.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The proposed \u00a31.5 billion (\u20ac1.76bn) Oxfordshire Strategic Rail Freight Interchange (OxSRFI) has been accepted for examination under the formal Development Consent Order (DCO) examination process.\u2026<\/p>\n","protected":false},"author":10,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[2491,20890,343,65,20892,15155,471,3051,20030,18387,47],"tags":[12634],"class_list":["post-510762","post","type-post","status-publish","format-standard","hentry","category-bicester","category-cherwell-district-council","category-infrastructure","category-intermodal","category-mountpark","category-nationally-significant-infrastructure-project","category-news","category-oxfordshire","category-oxfordshire-railfreight-limited","category-oxsrfi","category-rail-news","tag-railfreight"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.0.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"The proposed \u00a31.5 billion (\u20ac1.76bn) Oxfordshire Strategic Rail Freight Interchange (OxSRFI) has been accepted for examination under the formal Development Consent Order (DCO) examination process.\u2026\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Simon Walton\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=510762\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.0.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Oxfordshire rail freight interchange accepted for examination - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"The proposed \u00a31.5 billion (\u20ac1.76bn) Oxfordshire Strategic Rail Freight Interchange (OxSRFI) has been accepted for examination under the formal Development Consent Order (DCO) examination process.\u2026\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=510762\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-08-17T07:26:17+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-08-17T07:26:17+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Oxfordshire rail freight interchange accepted for examination - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The proposed \u00a31.5 billion (\u20ac1.76bn) Oxfordshire Strategic Rail Freight Interchange (OxSRFI) has been accepted for examination under the formal Development Consent Order (DCO) examination process.\u2026\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=510762#blogposting\",\"name\":\"Oxfordshire rail freight interchange accepted for examination - VibeWire Magazine\",\"headline\":\"Oxfordshire rail freight interchange accepted for examination\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=10#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.railfreight.com\\\/wp-content\\\/uploads\\\/2023\\\/04\\\/OxSRFI-OpenStreetMap-scaled.jpg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=510762\\\/#articleImage\"},\"datePublished\":\"2026-08-17T17:26:17+10:00\",\"dateModified\":\"2026-08-17T17:26:17+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=510762#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=510762#webpage\"},\"articleSection\":\"Bicester, Cherwell District Council, Infrastructure, Intermodal, Mountpark, Nationally Significant Infrastructure Project, News, Oxfordshire, Oxfordshire Railfreight Limited, OxSRFI, Rail News, RailFreight\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=510762#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=510762#listItem\",\"name\":\"Oxfordshire rail freight interchange accepted for examination\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=510762#listItem\",\"position\":3,\"name\":\"Oxfordshire rail freight interchange accepted for examination\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=510762\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=510762\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=10#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=10\",\"name\":\"Simon Walton\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=510762#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/020b8a5d94269d301ba7cb66728514654913e0230c15145597cadc788b705bf2?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Simon Walton\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=510762#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=510762\",\"name\":\"Oxfordshire rail freight interchange accepted for examination - VibeWire Magazine\",\"description\":\"The proposed \\u00a31.5 billion (\\u20ac1.76bn) Oxfordshire Strategic Rail Freight Interchange (OxSRFI) has been accepted for examination under the formal Development Consent Order (DCO) examination process.\\u2026\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=510762#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=10#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=10#author\"},\"datePublished\":\"2026-08-17T17:26:17+10:00\",\"dateModified\":\"2026-08-17T17:26:17+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Oxfordshire rail freight interchange accepted for examination - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Oxfordshire rail freight interchange accepted for examination - VibeWire Magazine","description":"The proposed \u00a31.5 billion (\u20ac1.76bn) Oxfordshire Strategic Rail Freight Interchange (OxSRFI) has been accepted for examination under the formal Development Consent Order (DCO) examination process.\u2026","canonical_url":"https:\/\/www.vibewire.com.au\/?p=510762","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=510762#blogposting","name":"Oxfordshire rail freight interchange accepted for examination - VibeWire Magazine","headline":"Oxfordshire rail freight interchange accepted for examination","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=10#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.railfreight.com\/wp-content\/uploads\/2023\/04\/OxSRFI-OpenStreetMap-scaled.jpg","@id":"https:\/\/www.vibewire.com.au\/?p=510762\/#articleImage"},"datePublished":"2026-08-17T17:26:17+10:00","dateModified":"2026-08-17T17:26:17+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=510762#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=510762#webpage"},"articleSection":"Bicester, Cherwell District Council, Infrastructure, Intermodal, Mountpark, Nationally Significant Infrastructure Project, News, Oxfordshire, Oxfordshire Railfreight Limited, OxSRFI, Rail News, RailFreight"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=510762#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=510762#listItem","name":"Oxfordshire rail freight interchange accepted for examination"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=510762#listItem","position":3,"name":"Oxfordshire rail freight interchange accepted for examination","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=510762\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=510762\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=10#author","url":"https:\/\/www.vibewire.com.au\/?author=10","name":"Simon Walton","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=510762#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/020b8a5d94269d301ba7cb66728514654913e0230c15145597cadc788b705bf2?s=96&d=mm&r=g","width":96,"height":96,"caption":"Simon Walton"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=510762#webpage","url":"https:\/\/www.vibewire.com.au\/?p=510762","name":"Oxfordshire rail freight interchange accepted for examination - VibeWire Magazine","description":"The proposed \u00a31.5 billion (\u20ac1.76bn) Oxfordshire Strategic Rail Freight Interchange (OxSRFI) has been accepted for examination under the formal Development Consent Order (DCO) examination process.\u2026","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=510762#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=10#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=10#author"},"datePublished":"2026-08-17T17:26:17+10:00","dateModified":"2026-08-17T17:26:17+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Oxfordshire rail freight interchange accepted for examination - VibeWire Magazine","og:description":"The proposed \u00a31.5 billion (\u20ac1.76bn) Oxfordshire Strategic Rail Freight Interchange (OxSRFI) has been accepted for examination under the formal Development Consent Order (DCO) examination process.\u2026","og:url":"https:\/\/www.vibewire.com.au\/?p=510762","article:published_time":"2026-08-17T07:26:17+00:00","article:modified_time":"2026-08-17T07:26:17+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Oxfordshire rail freight interchange accepted for examination - VibeWire Magazine","twitter:description":"The proposed \u00a31.5 billion (\u20ac1.76bn) Oxfordshire Strategic Rail Freight Interchange (OxSRFI) has been accepted for examination under the formal Development Consent Order (DCO) examination process.\u2026","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"510762","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-08-17 07:34:49","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2026-08-17 07:34:00","updated":"2026-08-17 07:34:49","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tOxfordshire rail freight interchange accepted for examination\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"Oxfordshire rail freight interchange accepted for examination","link":"https:\/\/www.vibewire.com.au\/?p=510762"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/510762","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=510762"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/510762\/revisions"}],"predecessor-version":[{"id":510766,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/510762\/revisions\/510766"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=510762"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=510762"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=510762"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}