{"id":507985,"date":"2026-08-14T14:45:55","date_gmt":"2026-08-14T04:45:55","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=507985"},"modified":"2026-08-14T14:47:04","modified_gmt":"2026-08-14T04:47:04","slug":"trains-resume-services-at-euroa-and-benalla-stations","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=507985","title":{"rendered":"Trains resume services at Euroa and Benalla stations"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Trains have not stopped at the stations in recent months as Inland Rail and construction partner, John Holland, transform the stations with new tracks and platforms, improved pedestrian and vehicle access, additional car parking, and community spaces.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As passenger train services resume at\u00a0<a href=\"https:\/\/www.vibewire.com.au\/?tag=benalla\" title=\"Benalla\">Benalla<\/a>, the existing V\/Line station building will temporarily close and passenger services will be offered from interim facilities on the opposite side of the tracks, off Railway Place.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The interim facilities will include a V\/Line ticketing office, toilets, carpark and a coach pickup and drop off zone.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Trains will stop at the new west platform on the Railway Place side of the station, which will be served by the new underpass, ramps and stairs. The full Benalla Station precinct is on track to be completed in the new year.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At&nbsp;<a href=\"https:\/\/inlandrail.com.au\/where-we-go\/projects\/beveridge-to-albury\/regions\/euroa\/\">Euroa<\/a>, trains will stop again at the upgraded platform in front of the old station building and the adjacent new station carpark off Railway Street will be opened to the public.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The carpark will include 50 spaces, two accessible car parks and four spots for a quick and safe drop off or pick up. The coach stop will remain at McGuinness Street until the end of the year.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Station works and the Anderson Street underpass are progressing well, with the full Euroa station precinct opening in the new year.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Inland Rail has ticked off another major milestone on the Beveridge to Albury Tranche 2 project, completing works at Benalla and Euroa stations.<\/p>\n","protected":false},"author":21,"featured_media":507987,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[326,47],"tags":[9999,10320,16832,8],"class_list":["post-507985","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-inland-rail","category-rail-news","tag-benalla","tag-beveridge","tag-euroa","tag-victoria"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.0.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Inland Rail has ticked off another major milestone on the Beveridge to Albury Tranche 2 project, completing works at Benalla and Euroa stations.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Bardy Bigglesworth\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=507985\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.0.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Trains resume services at Euroa and Benalla stations\" \/>\n\t\t<meta property=\"og:description\" content=\"Inland Rail has ticked off another major milestone on the Beveridge to Albury Tranche 2 project, completing works at Benalla and Euroa stations.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=507985\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/08\/image_2026-08-14_143531171.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/08\/image_2026-08-14_143531171.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t\t<meta property=\"og:image:height\" content=\"1281\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-08-14T04:45:55+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-08-14T04:47:04+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Trains resume services at Euroa and Benalla stations\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Inland Rail has ticked off another major milestone on the Beveridge to Albury Tranche 2 project, completing works at Benalla and Euroa stations.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/08\/image_2026-08-14_143531171.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=507985#blogposting\",\"name\":\"Trains resume services at Euroa and Benalla stations\",\"headline\":\"Trains resume services at Euroa and Benalla stations\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=21#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/image_2026-08-14_143531171.png\",\"width\":1920,\"height\":1281,\"caption\":\"Construction workers in orange vests on a platform under construction, with steel canopy and train tracks stretching into the distance and construction in the background.]','Railway construction site: workers on a platform beside steel framework, orange safety gear, and an active track yard.','Platform under construction with iron framework, orange cones, and workers near parallel railway tracks.\"},\"datePublished\":\"2026-08-14T14:45:55+10:00\",\"dateModified\":\"2026-08-14T14:47:04+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=507985#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=507985#webpage\"},\"articleSection\":\"Inland Rail, Rail News, Benalla, Beveridge, Euroa, victoria\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=507985#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=507985#listItem\",\"name\":\"Trains resume services at Euroa and Benalla stations\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=507985#listItem\",\"position\":3,\"name\":\"Trains resume services at Euroa and Benalla stations\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=507985\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=507985\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=21#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=21\",\"name\":\"Bardy Bigglesworth\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=507985#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e3d1fce2fc3f81c2cf0bda5fbfee560ac033389e9a3983a9ee462907c5ca5c9d?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Bardy Bigglesworth\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=507985#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=507985\",\"name\":\"Trains resume services at Euroa and Benalla stations\",\"description\":\"Inland Rail has ticked off another major milestone on the Beveridge to Albury Tranche 2 project, completing works at Benalla and Euroa stations.\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=507985#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=21#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=21#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/image_2026-08-14_143531171.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=507985\\\/#mainImage\",\"width\":1920,\"height\":1281,\"caption\":\"Construction workers in orange vests on a platform under construction, with steel canopy and train tracks stretching into the distance and construction in the background.]','Railway construction site: workers on a platform beside steel framework, orange safety gear, and an active track yard.','Platform under construction with iron framework, orange cones, and workers near parallel railway tracks.\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=507985#mainImage\"},\"datePublished\":\"2026-08-14T14:45:55+10:00\",\"dateModified\":\"2026-08-14T14:47:04+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Trains resume services at Euroa and Benalla stations<\/title>\n\n","aioseo_head_json":{"title":"Trains resume services at Euroa and Benalla stations","description":"Inland Rail has ticked off another major milestone on the Beveridge to Albury Tranche 2 project, completing works at Benalla and Euroa stations.","canonical_url":"https:\/\/www.vibewire.com.au\/?p=507985","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=507985#blogposting","name":"Trains resume services at Euroa and Benalla stations","headline":"Trains resume services at Euroa and Benalla stations","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=21#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/08\/image_2026-08-14_143531171.png","width":1920,"height":1281,"caption":"Construction workers in orange vests on a platform under construction, with steel canopy and train tracks stretching into the distance and construction in the background.]','Railway construction site: workers on a platform beside steel framework, orange safety gear, and an active track yard.','Platform under construction with iron framework, orange cones, and workers near parallel railway tracks."},"datePublished":"2026-08-14T14:45:55+10:00","dateModified":"2026-08-14T14:47:04+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=507985#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=507985#webpage"},"articleSection":"Inland Rail, Rail News, Benalla, Beveridge, Euroa, victoria"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=507985#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=507985#listItem","name":"Trains resume services at Euroa and Benalla stations"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=507985#listItem","position":3,"name":"Trains resume services at Euroa and Benalla stations","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=507985\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=507985\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=21#author","url":"https:\/\/www.vibewire.com.au\/?author=21","name":"Bardy Bigglesworth","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=507985#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/e3d1fce2fc3f81c2cf0bda5fbfee560ac033389e9a3983a9ee462907c5ca5c9d?s=96&d=mm&r=g","width":96,"height":96,"caption":"Bardy Bigglesworth"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=507985#webpage","url":"https:\/\/www.vibewire.com.au\/?p=507985","name":"Trains resume services at Euroa and Benalla stations","description":"Inland Rail has ticked off another major milestone on the Beveridge to Albury Tranche 2 project, completing works at Benalla and Euroa stations.","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=507985#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=21#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=21#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/08\/image_2026-08-14_143531171.png","@id":"https:\/\/www.vibewire.com.au\/?p=507985\/#mainImage","width":1920,"height":1281,"caption":"Construction workers in orange vests on a platform under construction, with steel canopy and train tracks stretching into the distance and construction in the background.]','Railway construction site: workers on a platform beside steel framework, orange safety gear, and an active track yard.','Platform under construction with iron framework, orange cones, and workers near parallel railway tracks."},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=507985#mainImage"},"datePublished":"2026-08-14T14:45:55+10:00","dateModified":"2026-08-14T14:47:04+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Trains resume services at Euroa and Benalla stations","og:description":"Inland Rail has ticked off another major milestone on the Beveridge to Albury Tranche 2 project, completing works at Benalla and Euroa stations.","og:url":"https:\/\/www.vibewire.com.au\/?p=507985","og:image":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/08\/image_2026-08-14_143531171.png","og:image:secure_url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/08\/image_2026-08-14_143531171.png","og:image:width":"1920","og:image:height":"1281","article:published_time":"2026-08-14T04:45:55+00:00","article:modified_time":"2026-08-14T04:47:04+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Trains resume services at Euroa and Benalla stations","twitter:description":"Inland Rail has ticked off another major milestone on the Beveridge to Albury Tranche 2 project, completing works at Benalla and Euroa stations.","twitter:creator":"@VibewireCentral","twitter:image":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/08\/image_2026-08-14_143531171.png"},"aioseo_meta_data":{"post_id":"507985","title":"#post_title","description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"Euroa","score":0,"analysis":[]},"additional":[{"keyphrase":"Inland Rail","score":0},{"keyphrase":"Australia","score":0},{"keyphrase":"Rail Freight","score":0},{"keyphrase":"Beveridge","score":0}]},"primary_term":null,"canonical_url":null,"og_title":"#post_title","og_description":"#post_excerpt","og_object_type":"default","og_image_type":"featured","og_image_url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/08\/image_2026-08-14_143531171.png","og_image_width":"1920","og_image_height":"1281","og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"featured","twitter_image_url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/08\/image_2026-08-14_143531171.png","twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":"#post_title","twitter_description":"#post_excerpt","schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"seo_analyzer_scan_date":"2026-08-14 04:48:32","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-08-14 04:33:17","updated":"2026-08-14 04:48:32","focus_keyword":"Euroa","additional_keywords":[{"word":"Inland Rail","score":80,"items":{"introductionKeyword":{"score":9},"keyphraseLength":{"score":9},"keyphraseDensity":{"score":4},"functionWordsInKeyphrase":{"score":9},"textCompetingLinks":{"score":9},"imageKeyphrase":{"score":3}}},{"word":"Australia","score":69,"items":{"introductionKeyword":{"score":3},"keyphraseLength":{"score":9},"keyphraseDensity":{"score":4},"functionWordsInKeyphrase":{"score":9},"textCompetingLinks":{"score":9},"imageKeyphrase":{"score":3}}},{"word":"Rail Freight","score":69,"items":{"introductionKeyword":{"score":3},"keyphraseLength":{"score":9},"keyphraseDensity":{"score":4},"functionWordsInKeyphrase":{"score":9},"textCompetingLinks":{"score":9},"imageKeyphrase":{"score":3}}},{"word":"Beveridge","score":69,"items":{"introductionKeyword":{"score":3},"keyphraseLength":{"score":9},"keyphraseDensity":{"score":4},"functionWordsInKeyphrase":{"score":9},"textCompetingLinks":{"score":9},"imageKeyphrase":{"score":3}}}],"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tTrains resume services at Euroa and Benalla stations\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"Trains resume services at Euroa and Benalla stations","link":"https:\/\/www.vibewire.com.au\/?p=507985"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/507985","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=507985"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/507985\/revisions"}],"predecessor-version":[{"id":507993,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/507985\/revisions\/507993"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/media\/507987"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=507985"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=507985"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=507985"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}