{"id":50589,"date":"2024-05-22T10:28:27","date_gmt":"2024-05-22T00:28:27","guid":{"rendered":"https:\/\/www.railexpress.com.au\/?p=116326"},"modified":"2024-05-22T10:28:27","modified_gmt":"2024-05-22T00:28:27","slug":"foundations-set-for-inland-rail-construction","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=50589","title":{"rendered":"Foundations set for Inland Rail construction"},"content":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/05\/SAR-Piling-works.jpg\" alt=\"\" style=\"float:right; margin:0 0 10px 10px;\"><figcaption>Image\/Inland Rail<br \/>\n<\/figcaption><\/figure>\n<p><strong><a href=\"https:\/\/inlandrail.com.au\/\">Inland Rail<\/a> has ticked off a major construction milestone in Victoria, completing foundation pile drilling at the Seymour-Avenel Road site marking the end of the important pile drilling process across the first four Victorian Inland Rail construction sites.<\/strong><span id=\"more-116326\"><\/span><\/p>\n<p>Fifty-six piles have been drilled and filled with concrete and will form the foundation of the new Seymour-Avenel Road bridge.<\/p>\n<p>Each pile is approximately 15 metres deep and a meter wide and will support the substructure of the bridge, including the pile cap, blade walls and bridge beams.<\/p>\n<p>Inland Rail Program Delivery Director B2A Ed Walker celebrated the milestone.<\/p>\n<p>\u201cThe completion of the underground foundation work marks an important milestone in the delivery of the first four tranche 1 sites,&#8221; he said.<\/p>\n<p>\u201cBarnawartha North and Glenrowan sites are almost finished, and Wangaratta and Seymour-Avenel Road are progressing well.<\/p>\n<figure id=\"attachment_116328\" aria-describedby=\"caption-attachment-116328\" style=\"width: 300px\" class=\"wp-caption alignleft\"><a href=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/05\/SAR-Site-Overview.jpg\"><img fetchpriority=\"high\" decoding=\"async\" class=\"size-medium wp-image-116328\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/05\/SAR-Site-Overview-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/05\/SAR-Site-Overview-300x200.jpg 300w, https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/05\/SAR-Site-Overview-1024x683.jpg 1024w, https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/05\/SAR-Site-Overview-768x512.jpg 768w, https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/05\/SAR-Site-Overview.jpg 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-116328\" class=\"wp-caption-text\">Image\/Inland Rail<\/figcaption><\/figure>\n<p>\u201cThe contract to build the eight remaining Victorian sites will be awarded in June and work will begin next year.\u201d<\/p>\n<p>Once the material is excavated, a steel cage is inserted and roughly 15 cubic metres of concrete is poured.<\/p>\n<p>A 130-tonne piling rig completed the drilling of the 56 piles at Seymour Avenel Road in three weeks.<\/p>\n<p>McConnell Dowell Seymour-Avenel Road Area Manager Kelvin Kumangai explained even further.<\/p>\n<p>\u201cThis is an important milestone for the Seymour Avenel Road Bridge, and the Inland Rail project as it is the last site on Tranche 1 to complete piling works.<\/p>\n<p>\u201cThe focus now shifts to building the bridge structure out of the ground, at a new raised height to provide clearance for double-stacked trains.\u201d<\/p>\n<p>Inland Rail is a nation building project that will transform how <a href=\"https:\/\/www.railexpress.com.au\/rail-industry-news-australia-new-zealand\/freight-rail-rail-industry-news-australia-new-zealand\/\">goods<\/a> are moved around Australia, first connecting Beveridge to Parkes, NSW, by 2027 before later connecting from Narromine, New South Wales, to Ebenezer, Queensland.<\/p>\n<p>In Victoria, work will take place at 12 sites between Beveridge and Albury, to enable double-stacked freight trains to pass safely and ensure everyday products can be delivered faster and more reliably around Australia.<\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/foundations-set-for-inland-rail-construction\/\">Foundations set for Inland Rail construction<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/05\/SAR-Piling-works.jpg\" alt=\"\"><figcaption>Image\/Inland Rail<br \/>\n<\/figcaption><\/figure>\n<p>Inland Rail has ticked off a major construction milestone in Victoria, completing foundation pile drilling at the Seymour-Avenel Road site \u2026 <\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/foundations-set-for-inland-rail-construction\/\">Foundations set for Inland Rail construction<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[170,165,326,163,58],"tags":[8],"class_list":["post-50589","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-freight-rail","category-industry-infrastructure","category-inland-rail","category-rail-industry-news-australia-new-zealand","category-track-construction","tag-victoria"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/50589","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=50589"}],"version-history":[{"count":3,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/50589\/revisions"}],"predecessor-version":[{"id":51278,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/50589\/revisions\/51278"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=50589"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=50589"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=50589"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}