{"id":48723,"date":"2024-05-20T09:31:16","date_gmt":"2024-05-19T23:31:16","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=48723"},"modified":"2024-05-20T09:31:20","modified_gmt":"2024-05-19T23:31:20","slug":"murchison-rail-trail-timber-bridge-renewal-works","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=48723","title":{"rendered":"Murchison Rail Trail &#8211; Timber Bridge Renewal Works"},"content":{"rendered":"\n<p>Greater Shepparton City Council would like to advise the Murchison Community and recreational groups of the upcoming project to complete essential maintenance and repair works to the Murchison Rail Trail Bridge over the Stuart Murray Canal, adjoining the Bendigo-Murchison Road. The completion of these important works will ensure compliance and safety for all user groups.<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"480\" height=\"293\" src=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-54-1.jpeg\" alt=\"\" class=\"wp-image-48724\" srcset=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-54-1.jpeg 480w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-54-1-300x183.jpeg 300w\" sizes=\"auto, (max-width: 480px) 100vw, 480px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"480\" height=\"252\" src=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-53-1.jpeg\" alt=\"\" class=\"wp-image-48725\" style=\"width:480px;height:auto\" srcset=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-53-1.jpeg 480w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-53-1-300x158.jpeg 300w\" sizes=\"auto, (max-width: 480px) 100vw, 480px\" \/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<h3 class=\"wp-block-heading\">In Summary<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Essential maintenance and repair works planned for Murchison Rail Trail Bridge over Stuart Murray Canal.<\/li>\n\n\n\n<li>Construction to commence on 20 May 2024, lasting approximately six weeks during the winter irrigation shutdown period.<\/li>\n\n\n\n<li>Bridge closure to all public use, including pedestrians and cyclists, during construction.<\/li>\n\n\n\n<li>Completion aimed for compliance, safety, and uninterrupted trail access post-renovation.<\/li>\n<\/ul>\n\n\n\n<p>The&nbsp;construction timeframe is governed by Goulburn-Murray Water\u2019s (G-MW) winter irrigation \u201cshut down\u201d period of the Stuart Murray Canal, which is planned from mid-May through to mid-August each and every year. It is anticipated the construction will be completed over a six week duration during the Irrigation \u201cshut down\u201d period. The bridge will be closed to all public use, including pedestrians and cyclists, during this time.&nbsp;&nbsp;<\/p>\n\n\n\n<p>Depending on rain and unfavourable weather, the Stuart Murray Canal may be \u201cre-opened\u201d by G-MW, potentially delaying the bridge renewal works.&nbsp;<\/p>\n\n\n\n<p><strong>The works are planned to commence on Monday 20&nbsp;May 2024.<\/strong><\/p>\n\n\n\n<p>The&nbsp;bridge renewal works include, but are not limited to:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Setting up site,\u00a0closure of the bridge to public use,\u00a0establishment of traffic\u00a0and pedestrian\/cyclist\u00a0management measures and \u2018temporary\u2019 removal of fencing,<\/li>\n\n\n\n<li>Timber Pile Repairs including pile &#8216;wrap and pour&#8217;, and splicing new timber sections into existing<\/li>\n\n\n\n<li>Supply and replace timber crossheads, bolts and fixtures,<\/li>\n\n\n\n<li>Application of timber preservation treatments and associated works,<\/li>\n\n\n\n<li>Reinstatement of fencing and the surrounding site.<\/li>\n\n\n\n<li>Re-opening of the bridge to public use.<\/li>\n<\/ul>\n\n\n\n<p>Council requests user groups and the community to be informed and to plan their journey and any events around these essential bridge works.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"48726\" src=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-55-1-1024x768.jpeg\" alt=\"\" class=\"wp-image-48726\" srcset=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-55-1-1024x768.jpeg 1024w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-55-1-300x225.jpeg 300w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-55-1-768x576.jpeg 768w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-55-1-1536x1152.jpeg 1536w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-55-1.jpeg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"577\" data-id=\"48728\" src=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-56-1-1024x577.jpeg\" alt=\"\" class=\"wp-image-48728\" srcset=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-56-1-1024x577.jpeg 1024w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-56-1-300x169.jpeg 300w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-56-1-768x432.jpeg 768w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-56-1-1536x865.jpeg 1536w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-56-1.jpeg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"577\" data-id=\"48729\" src=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-57-1-1024x577.jpeg\" alt=\"\" class=\"wp-image-48729\" srcset=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-57-1-1024x577.jpeg 1024w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-57-1-300x169.jpeg 300w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-57-1-768x432.jpeg 768w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-57-1-1536x865.jpeg 1536w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-57-1.jpeg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"48727\" src=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-58-1-1024x576.jpeg\" alt=\"\" class=\"wp-image-48727\" srcset=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-58-1-1024x576.jpeg 1024w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-58-1-300x169.jpeg 300w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-58-1-768x432.jpeg 768w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-58-1-1536x864.jpeg 1536w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Image-58-1.jpeg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Complete essential maintenance and repair works to the Murchison Rail Trail Bridge over the Stuart Murray Canal, adjoining the Bendigo-Murchison Road.<\/p>\n","protected":false},"author":20,"featured_media":48726,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[273,163,7468],"tags":[9451,8],"class_list":["post-48723","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-australia","category-rail-industry-news-australia-new-zealand","category-rail-trail","tag-murchison","tag-victoria"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/48723","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=48723"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/48723\/revisions"}],"predecessor-version":[{"id":48730,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/48723\/revisions\/48730"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/media\/48726"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=48723"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=48723"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=48723"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}