{"id":484650,"date":"2026-07-21T22:04:18","date_gmt":"2026-07-21T12:04:18","guid":{"rendered":"https:\/\/railuk.com\/?p=196641"},"modified":"2026-07-21T22:04:18","modified_gmt":"2026-07-21T12:04:18","slug":"hs2-completes-major-a43-works-during-twin-weekend-closures","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=484650","title":{"rendered":"HS2 completes major A43 works during twin weekend closures"},"content":{"rendered":"<p><a href=\"https:\/\/railuk.com\/rail-projects\/hs2-completes-major-a43-works-during-twin-weekend-closures\/\" title=\"HS2 completes major A43 works during twin weekend closures\" rel=\"nofollow\"><img loading=\"lazy\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/07\/21125905\/Traffic-passing-over-HS2s-A43-bridge-near-Brackley-ahead-of-the-excavation-of-the-cutting-that-will-allow-trains-to-pass-beneath-July-2026_cropped-1-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\" style=\"display: block; margin-bottom: 5px; clear:both;max-width: 100%;\" link_thumbnail=\"1\" decoding=\"async\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/07\/21125905\/Traffic-passing-over-HS2s-A43-bridge-near-Brackley-ahead-of-the-excavation-of-the-cutting-that-will-allow-trains-to-pass-beneath-July-2026_cropped-1-485x360.jpg 485w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/07\/21125905\/Traffic-passing-over-HS2s-A43-bridge-near-Brackley-ahead-of-the-excavation-of-the-cutting-that-will-allow-trains-to-pass-beneath-July-2026_cropped-1-80x60.jpg 80w\" sizes=\"auto, (max-width: 485px) 100vw, 485px\" \/><\/a><\/p>\n<p class=\"wp-block-paragraph\">The construction of a&nbsp;bridge that will&nbsp;allow&nbsp;high speed trains&nbsp;to pass&nbsp;under the busy A43 near Brackley&nbsp;took a major step forward over the weekend&nbsp;with&nbsp;completion of a&nbsp;complex multi-stage realignment of the dual&nbsp;carriageway.&nbsp;<\/p>\n<p class=\"wp-block-paragraph\">The&nbsp;A43&nbsp;\u2013 which links Oxford, Brackley and Northampton \u2013&nbsp;is a&nbsp;vital&nbsp;route, providing access to Silverstone and&nbsp;connections between the M40 and M1. It&nbsp;was reopened on Sunday evening after two consecutive weekend closures.&nbsp;<\/p>\n<p class=\"wp-block-paragraph\">Preparatory&nbsp;work began in 2023 when HS2 engineers, working closely with National Highways,&nbsp;realigned the road&nbsp;to&nbsp;create&nbsp;an \u2018island\u2019&nbsp;between the two carriageways&nbsp;big enough&nbsp;for the construction of the&nbsp;new&nbsp;bridge.&nbsp;<\/p>\n<p class=\"wp-block-paragraph\">Using a \u2018top-down\u2019 approach, they&nbsp;sank&nbsp;52m deep piled foundations and then&nbsp;built the pile caps and piers that&nbsp;support the&nbsp;66-metre-long&nbsp;bridge&nbsp;deck&nbsp;that&nbsp;carries&nbsp;the road.&nbsp;Seven&nbsp;huge&nbsp;steel beams&nbsp;were then lifted into place to support the concrete deck.&nbsp;<\/p>\n<p class=\"wp-block-paragraph\">With the&nbsp;road surface complete, the&nbsp;team used the last two weekends to&nbsp;close&nbsp;each&nbsp;direction&nbsp;of the road&nbsp;in turn and&nbsp;divert&nbsp;them&nbsp;across the&nbsp;new&nbsp;bridge&nbsp;&#8211;&nbsp;while the other one stayed open.&nbsp;With traffic now flowing&nbsp;in both directions,&nbsp;excavation can begin&nbsp;to create space for the railway to pass underneath.&nbsp;&nbsp;<\/p>\n<p class=\"wp-block-paragraph\">This&nbsp;multi-stage&nbsp;approach&nbsp;was designed to keep traffic flowing and disruption to a minimum. The final&nbsp;closures&nbsp;were also&nbsp;delayed&nbsp;to avoid&nbsp;the&nbsp;F1&nbsp;British Grand Prix, which was held at Silverstone&nbsp;at&nbsp;the&nbsp;beginning of July&nbsp;2026.&nbsp;<\/p>\n<p class=\"wp-block-paragraph\"><strong>HS2&nbsp;Ltd\u2019s&nbsp;Head of Delivery&nbsp;Luis&nbsp;Gonzalez&nbsp;said:<\/strong><\/p>\n<p class=\"wp-block-paragraph\"><em>&#8220;The A43 is a&nbsp;busy&nbsp;route&nbsp;between Brackley and Northampton&nbsp;and&nbsp;I\u2019d&nbsp;like to thank drivers for their patience over the&nbsp;last&nbsp;two&nbsp;weekends,&nbsp;while we&nbsp;safely&nbsp;realigned the&nbsp;road&nbsp;over the new bridge.<\/em><\/p>\n<p class=\"wp-block-paragraph\"><em>\u201cWith the&nbsp;traffic flowing over the top, we can&nbsp;focus&nbsp;on&nbsp;the next part of this complex multi-stage project&nbsp;\u2013&nbsp;excavating the cutting that will take the&nbsp;railway under the road.\u201d<\/em><\/p>\n<p class=\"wp-block-paragraph\">The&nbsp;50 mile&nbsp;(80km)&nbsp;stretch of railway that passes Brackley \u2013 including the A43 bridge \u2013 is being delivered by&nbsp;HS2\u2019s main works contractor EKFB, a team made up of&nbsp;Eiffage, Kier, Ferrovial Construction and BAM Nuttall&nbsp;working with ASC&nbsp;(a joint venture between Arcadis,&nbsp;Setec&nbsp;and COWI).&nbsp;<\/p>\n<p class=\"wp-block-paragraph\">They worked with National Highways&nbsp;and&nbsp;EKFB\u2019s&nbsp;sub-contractor, Kier&nbsp;Transportation,&nbsp;to&nbsp;construct&nbsp;the temporary realignment&nbsp;so that&nbsp;traffic&nbsp;could keep&nbsp;flowing during the&nbsp;construction of the bridge.<\/p>\n<p class=\"wp-block-paragraph\">Significant progress&nbsp;has also been made with some of the smaller roads and bridges across Buckinghamshire and Northamptonshire,&nbsp;with&nbsp;six&nbsp;reopened to local traffic in the last six months.&nbsp;&nbsp;&nbsp;<\/p>\n<p class=\"wp-block-paragraph\">These includes the A4421 Buckingham Road,&nbsp;Edgcott&nbsp;Road, near Quainton, and&nbsp;Oatleys&nbsp;Road, which crosses the&nbsp;Turweston&nbsp;green bridge, near&nbsp;Brackley.&nbsp;<\/p>\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/07\/21130030\/A43-Beam-installation-aerial-view-looking-north-March-2025-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"767\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/07\/21130030\/A43-Beam-installation-aerial-view-looking-north-March-2025-1024x767.jpg\" alt=\"\" class=\"wp-image-196648\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/07\/21130030\/A43-Beam-installation-aerial-view-looking-north-March-2025-1024x767.jpg 1024w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/07\/21130030\/A43-Beam-installation-aerial-view-looking-north-March-2025-300x225.jpg 300w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/07\/21130030\/A43-Beam-installation-aerial-view-looking-north-March-2025-768x575.jpg 768w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/07\/21130030\/A43-Beam-installation-aerial-view-looking-north-March-2025-1536x1151.jpg 1536w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/07\/21130030\/A43-Beam-installation-aerial-view-looking-north-March-2025-2048x1534.jpg 2048w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/07\/21130030\/A43-Beam-installation-aerial-view-looking-north-March-2025-561x420.jpg 561w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/07\/21130030\/A43-Beam-installation-aerial-view-looking-north-March-2025-80x60.jpg 80w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/07\/21130030\/A43-Beam-installation-aerial-view-looking-north-March-2025-696x521.jpg 696w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/07\/21130030\/A43-Beam-installation-aerial-view-looking-north-March-2025-1068x800.jpg 1068w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/07\/21130030\/A43-Beam-installation-aerial-view-looking-north-March-2025-1920x1439.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n<p class=\"wp-block-paragraph\"><strong>EKFB\u2019s Project Director, Tony Wehby, said:&nbsp;<\/strong><\/p>\n<p class=\"wp-block-paragraph\"><em>\u201cCompleting the construction works on the A43 marks a significant milestone for the EKFB team and its supply chain partners. This completion now allows us to the remove material from underneath the road&nbsp;and press ahead with our earthworks programme&nbsp;in this area.&nbsp;<\/em><\/p>\n<p class=\"wp-block-paragraph\"><em>\u201cThank you to EKFB\u2019s&nbsp;highways&nbsp;and&nbsp;traffic&nbsp;teams, National Highways, Kier&nbsp;Transportation&nbsp;and the construction team&nbsp;for&nbsp;the world-class operation, not only on the opening on the A43 but&nbsp;also&nbsp;the opening&nbsp;of&nbsp;six&nbsp;other roads&nbsp;around the Brackley area.&nbsp;Not only have we limited the disruption&nbsp;for our local communities and road&nbsp;users,&nbsp;but we have done so in a considerate and safe way.\u201d<\/em><\/p>\n<p class=\"wp-block-paragraph\"><strong>National Highways Head of Network Planning and Development, Ian Doust, said:\u00a0<\/strong>\u00a0<\/p>\n<p class=\"wp-block-paragraph\"><em>An infrastructure project on this scale will inevitably cause some disruption but our priority is reducing the impact on the people who use our roads as much as possible.<\/em><\/p>\n<p class=\"wp-block-paragraph\"><em>\u201cThanks to some innovative traffic management,&nbsp;cutting edge&nbsp;engineering and close collaboration between National Highways, HS2 and their partners, we have been able to do that.<\/em><\/p>\n<p class=\"wp-block-paragraph\"><em>\u201cIt is very satisfying to see the traffic now flowing in both directions on the new bridge and the progress being made on this complex project.\u201d&nbsp;<\/em><\/p>\n<p class=\"wp-block-paragraph\">In total there are more than 500 bridging structures on the HS2 project. These range from small footbridges and culverts, to innovative \u2018green bridges\u2019 designed to help wildlife cross the railway, massive motorway&nbsp;crossings&nbsp;and the record-breaking Colne Valley viaduct.&nbsp;&nbsp;<\/p>\n<p class=\"wp-block-paragraph\">The new high-speed railway is designed to improve connections between London, Birmingham and the North while freeing up space for more local trains on the most congested southern end of the existing West Coast Main Line into London Euston.&nbsp;<\/p>\n<p class=\"wp-block-paragraph\">However, there is still significant work to do across the whole 140 miles between London and Birmingham. Mark Wild, HS2 Ltd Chief Executive, is now leading a comprehensive reset of the project to ensure the\u202fremainder\u202fof the route is delivered as efficiently as possible and for the lowest reasonable cost.\u202f<\/p>\n<p class=\"wp-block-paragraph\">Image credit: HS2<\/p>\n","protected":false},"excerpt":{"rendered":"<p><a href=\"https:\/\/railuk.com\/rail-projects\/hs2-completes-major-a43-works-during-twin-weekend-closures\/\" title=\"HS2 completes major A43 works during twin weekend closures\" rel=\"nofollow\"><img loading=\"lazy\" decoding=\"async\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/07\/21125905\/Traffic-passing-over-HS2s-A43-bridge-near-Brackley-ahead-of-the-excavation-of-the-cutting-that-will-allow-trains-to-pass-beneath-July-2026_cropped-1-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\"><\/a>The construction of a\u00a0bridge that will\u00a0allow\u00a0high speed trains\u00a0to pass\u00a0under the busy A43 near Brackley\u00a0took a major step forward over the weekend\u00a0with\u00a0completion of a\u00a0complex multi-stage realignment of the dual\u00a0carriageway.\u00a0 The\u00a0A43\u00a0\u2013 which links Oxford, Brackley and Northampton \u2013\u00a0is a\u00a0vital\u00a0route, providing access to Silverstone and\u00a0connections between the M40 and M1. It\u00a0was reopened on Sunday evening after two consecutive [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[53,1089,343,47,16148,85],"tags":[],"class_list":["post-484650","post","type-post","status-publish","format-standard","hentry","category-high-speed-rail","category-hs2","category-infrastructure","category-rail-news","category-rail-projects","category-uk"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.10 - aioseo.com -->\n\t<meta name=\"description\" content=\"The construction of a bridge that will allow high speed trains to pass under the busy A43 near Brackley took a major step forward over the weekend with completion of a complex multi-stage realignment of the dual carriageway. The A43 \u2013 which links Oxford, Brackley and Northampton \u2013 is a vital route, providing access to Silverstone and connections between the M40 and M1. It was reopened on Sunday evening after two consecutive [\u2026]\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=484650\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.10\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"HS2 completes major A43 works during twin weekend closures - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"The construction of a bridge that will allow high speed trains to pass under the busy A43 near Brackley took a major step forward over the weekend with completion of a complex multi-stage realignment of the dual carriageway. The A43 \u2013 which links Oxford, Brackley and Northampton \u2013 is a vital route, providing access to Silverstone and connections between the M40 and M1. It was reopened on Sunday evening after two consecutive [\u2026]\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=484650\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-07-21T12:04:18+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-07-21T12:04:18+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"HS2 completes major A43 works during twin weekend closures - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The construction of a bridge that will allow high speed trains to pass under the busy A43 near Brackley took a major step forward over the weekend with completion of a complex multi-stage realignment of the dual carriageway. The A43 \u2013 which links Oxford, Brackley and Northampton \u2013 is a vital route, providing access to Silverstone and connections between the M40 and M1. It was reopened on Sunday evening after two consecutive [\u2026]\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=484650#blogposting\",\"name\":\"HS2 completes major A43 works during twin weekend closures - VibeWire Magazine\",\"headline\":\"HS2 completes major A43 works during twin weekend closures\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/cdn.railuk.co\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/21125905\\\/Traffic-passing-over-HS2s-A43-bridge-near-Brackley-ahead-of-the-excavation-of-the-cutting-that-will-allow-trains-to-pass-beneath-July-2026_cropped-1-485x360.jpg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=484650\\\/#articleImage\"},\"datePublished\":\"2026-07-21T22:04:18+10:00\",\"dateModified\":\"2026-07-21T22:04:18+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=484650#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=484650#webpage\"},\"articleSection\":\"High-Speed Rail, HS2, Infrastructure, Rail News, Rail Projects, UK\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=484650#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=484650#listItem\",\"name\":\"HS2 completes major A43 works during twin weekend closures\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=484650#listItem\",\"position\":3,\"name\":\"HS2 completes major A43 works during twin weekend closures\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=484650\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=484650\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=484650#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=484650#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=484650\",\"name\":\"HS2 completes major A43 works during twin weekend closures - VibeWire Magazine\",\"description\":\"The construction of a bridge that will allow high speed trains to pass under the busy A43 near Brackley took a major step forward over the weekend with completion of a complex multi-stage realignment of the dual carriageway. The A43 \\u2013 which links Oxford, Brackley and Northampton \\u2013 is a vital route, providing access to Silverstone and connections between the M40 and M1. It was reopened on Sunday evening after two consecutive [\\u2026]\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=484650#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"datePublished\":\"2026-07-21T22:04:18+10:00\",\"dateModified\":\"2026-07-21T22:04:18+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>HS2 completes major A43 works during twin weekend closures - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"HS2 completes major A43 works during twin weekend closures - VibeWire Magazine","description":"The construction of a bridge that will allow high speed trains to pass under the busy A43 near Brackley took a major step forward over the weekend with completion of a complex multi-stage realignment of the dual carriageway. The A43 \u2013 which links Oxford, Brackley and Northampton \u2013 is a vital route, providing access to Silverstone and connections between the M40 and M1. It was reopened on Sunday evening after two consecutive [\u2026]","canonical_url":"https:\/\/www.vibewire.com.au\/?p=484650","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=484650#blogposting","name":"HS2 completes major A43 works during twin weekend closures - VibeWire Magazine","headline":"HS2 completes major A43 works during twin weekend closures","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/07\/21125905\/Traffic-passing-over-HS2s-A43-bridge-near-Brackley-ahead-of-the-excavation-of-the-cutting-that-will-allow-trains-to-pass-beneath-July-2026_cropped-1-485x360.jpg","@id":"https:\/\/www.vibewire.com.au\/?p=484650\/#articleImage"},"datePublished":"2026-07-21T22:04:18+10:00","dateModified":"2026-07-21T22:04:18+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=484650#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=484650#webpage"},"articleSection":"High-Speed Rail, HS2, Infrastructure, Rail News, Rail Projects, UK"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=484650#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=484650#listItem","name":"HS2 completes major A43 works during twin weekend closures"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=484650#listItem","position":3,"name":"HS2 completes major A43 works during twin weekend closures","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=484650\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=484650\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=484650#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=484650#webpage","url":"https:\/\/www.vibewire.com.au\/?p=484650","name":"HS2 completes major A43 works during twin weekend closures - VibeWire Magazine","description":"The construction of a bridge that will allow high speed trains to pass under the busy A43 near Brackley took a major step forward over the weekend with completion of a complex multi-stage realignment of the dual carriageway. The A43 \u2013 which links Oxford, Brackley and Northampton \u2013 is a vital route, providing access to Silverstone and connections between the M40 and M1. It was reopened on Sunday evening after two consecutive [\u2026]","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=484650#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"datePublished":"2026-07-21T22:04:18+10:00","dateModified":"2026-07-21T22:04:18+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"HS2 completes major A43 works during twin weekend closures - VibeWire Magazine","og:description":"The construction of a bridge that will allow high speed trains to pass under the busy A43 near Brackley took a major step forward over the weekend with completion of a complex multi-stage realignment of the dual carriageway. The A43 \u2013 which links Oxford, Brackley and Northampton \u2013 is a vital route, providing access to Silverstone and connections between the M40 and M1. It was reopened on Sunday evening after two consecutive [\u2026]","og:url":"https:\/\/www.vibewire.com.au\/?p=484650","article:published_time":"2026-07-21T12:04:18+00:00","article:modified_time":"2026-07-21T12:04:18+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"HS2 completes major A43 works during twin weekend closures - VibeWire Magazine","twitter:description":"The construction of a bridge that will allow high speed trains to pass under the busy A43 near Brackley took a major step forward over the weekend with completion of a complex multi-stage realignment of the dual carriageway. The A43 \u2013 which links Oxford, Brackley and Northampton \u2013 is a vital route, providing access to Silverstone and connections between the M40 and M1. It was reopened on Sunday evening after two consecutive [\u2026]","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"484650","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-07-21 13:27:36","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2026-07-21 13:21:49","updated":"2026-07-21 13:27:36"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tHS2 completes major A43 works during twin weekend closures\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"HS2 completes major A43 works during twin weekend closures","link":"https:\/\/www.vibewire.com.au\/?p=484650"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/484650","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=484650"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/484650\/revisions"}],"predecessor-version":[{"id":484652,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/484650\/revisions\/484652"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=484650"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=484650"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=484650"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}