{"id":48022,"date":"2024-05-19T13:16:41","date_gmt":"2024-05-19T03:16:41","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=48022"},"modified":"2024-05-19T13:16:50","modified_gmt":"2024-05-19T03:16:50","slug":"trans-australian-railway-to-be-flood-proofed-as-part-of-1-billion-program-to-grow-rail-network-resilience","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=48022","title":{"rendered":"Trans-Australian Railway to be flood-proofed as part of $1 billion program to grow rail network resilience"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">More than $200 million will be spent upgrading large sections of the Trans-Australian Railway Line so the vital east-west freight link can withstand one-in-100-year weather events.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It is part of a $1 billion program, which includes $540 million from the Commonwealth announced in this week&#8217;s Federal Budget, designed to build more resilience into the national rail network.&nbsp;&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Trans-Australian Railway line was completed in 1917 and converted to a standard gauge line in 1968 to form a continuous rail link between Sydney and Perth.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">But that link was severed for 21 days after widespread&nbsp;<a href=\"https:\/\/www.abc.net.au\/news\/2024-03-11\/drought-breaking-storms-flood-nullarbor-pastoral-station\/103572824\">flooding hit the remote Nullarbor in March<\/a>.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The flooding also impacted WA&#8217;s main road link with the east, the Eyre Highway, which had a flow-on effect on WA supermarket shelves.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Trans-Australian Railway line was also&nbsp;<a href=\"https:\/\/www.abc.net.au\/news\/2022-01-28\/outback-rail-repairs-could-take-weeks-after-rain-and-floods\/100787074\">closed for 24 days in 2022 when floods damaged about 300 kilometres<\/a>&nbsp;of track near Tarcoola in South Australia.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/live-production.wcms.abc-cdn.net.au\/0f3dedfc86bffea2328ca1e07429dbcf?src\" alt=\"Crew working to repair rail line during floods. \" \/><figcaption class=\"wp-element-caption\">Repair crews working on the Trans-Australian Railway Line near Rawlinna earlier this year.<em>(Supplied: ARTC)<\/em><\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Upgrades to take years<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Wayne Johnson, managing director of the Adelaide-based, federal-government-owned Australian Rail Track Corporation, described the funding as a &#8220;shot in the arm&#8221; for the rail industry.&nbsp;&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;I was in Western Australia around Easter&nbsp;<a href=\"https:\/\/www.abc.net.au\/news\/2024-04-17\/wa-supermarket-shortages-still-10-days-from-being-resolved\/103729378\">to see the effects on businesses and supermarket shelves<\/a>&nbsp;and meet with representatives of the Western Australian government and the supply chain over there, and you can imagine their concern with repeated events,&#8221; Mr Johnson said.&nbsp;&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;We&#8217;ve looked at hydrology with these weather patterns across the whole of our 8,500km network and updated a lot of our works.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;That money is going towards additional works to help cope with more extreme weather events.&#8221;<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/live-production.wcms.abc-cdn.net.au\/d85c07725c0f19530acb9c5727637c1b?impolicy=wcms_crop_resize&amp;cropH=1151&amp;cropW=1727&amp;xPos=161&amp;yPos=0&amp;width=862&amp;height=575\" alt=\"An aerial view of a freight train in a remote part of the outback.  \" \/><figcaption class=\"wp-element-caption\">The Trans-Australian Railway Line near Port Augusta in South Australia.<em>(Supplied: ARTC)<\/em><\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The federal funding includes $140 million for culvert upgrades to increase flood resilience from one-in-13-year events in WA, SA and NSW to one-in-100-year events.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">An additional $100 million will be spent replacing 47 kilograms per metre rail with 60&nbsp;kilograms per metre steel to support larger trains between Kalgoorlie-Boulder in WA and Tarcoola in SA.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;You&#8217;ve got to bear in mind that a lot of goods run east-west routinely, so we&#8217;ve got to mix that work in among those operations,&#8221; Mr Johnson said.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;It could take years to get through the totality, but we&#8217;ll be starting within the financial year.&#8221;<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/live-production.wcms.abc-cdn.net.au\/aa44a67ed86cc966077a925a04ae2168?impolicy=wcms_crop_resize&amp;cropH=717&amp;cropW=1076&amp;xPos=0&amp;yPos=42&amp;width=862&amp;height=575\" alt=\"Flooding in the outback cuts a railway line.  \" \/><figcaption class=\"wp-element-caption\">The&nbsp;Trans-Australian Railway Line was cut for three weeks after flooding at Rawlinna on the Nullarbor.<em>(Supplied: Australian Rail Track Corporation)<\/em><\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Huge cost to economy<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">According to the&nbsp;Australasian Railway Association (ARA), the east-west rail corridor is out of service on an average of 40 days every year due to flooding.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">With 56 per cent of the nation&#8217;s freight being moved by rail, ARA chief executive Caroline Wilkie said strengthening infrastructure to cope with these events was critical.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;Repeated severe weather events, particularly flooding, have had a major impact on rail freight and passenger services and resulted in significant disruptions to our national supply chain,&#8221; she said.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;Washouts on the east-west rail line alone cost the economy $320 million in 2022.&#8221;<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/live-production.wcms.abc-cdn.net.au\/3d34e999eae21273f49b9a793db6aedd?impolicy=wcms_crop_resize&amp;cropH=750&amp;cropW=1125&amp;xPos=0&amp;yPos=46&amp;width=862&amp;height=575\" alt=\"He smiles at the camera\" \/><figcaption class=\"wp-element-caption\">Western Roads Federation CEO Cam Dumesny welcomed the rail funding but says WA is still vulnerable to freight disruption.&nbsp;&nbsp;<em>(ABC Perth: Julian Robins)<\/em><\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>More than $200 million will be spent upgrading large sections of the Trans-Australian Railway Line so the vital east-west freight link can withstand one-in-100-year weather events.<\/p>\n<p>It is part of a $1 billion program, which includes $540 million from the Commonwealth announced in this week&#8217;s Federal Budget, designed to build more resilience into the national rail network.  <\/p>\n<p>The Trans-Australian Railway line was completed in 1917 and converted to a standard gauge line in 1968 to form a continuous rail link between Sydney and Perth.<\/p>\n<p>But that link was severed for 21 days after widespread flooding hit the remote Nullarbor in March. <\/p>\n<p>The flooding also impacted WA&#8217;s main road link with the east, the Eyre Highway, which had a flow-on effect on WA supermarket shelves.<\/p>\n<p>The Trans-Australian Railway line was also closed for 24 days in 2022 when floods damaged about 300 kilometres of track near Tarcoola in South Australia. <\/p>\n<p>Crew working to repair rail line during floods.<br \/>\nRepair crews working on the Trans-Australian Railway Line near Rawlinna earlier this year.(Supplied: ARTC)<br \/>\nUpgrades to take years<\/p>\n<p>Wayne Johnson, managing director of the Adelaide-based, federal-government-owned Australian Rail Track Corporation, described the funding as a &#8220;shot in the arm&#8221; for the rail industry.  <\/p>\n<p>&#8220;I was in Western Australia around Easter to see the effects on businesses and supermarket shelves and meet with representatives of the Western Australian government and the supply chain over there, and you can imagine their concern with repeated events,&#8221; Mr Johnson said.  <\/p>\n<p>&#8220;We&#8217;ve looked at hydrology with these weather patterns across the whole of our 8,500km network and updated a lot of our works. <\/p>\n<p>&#8220;That money is going towards additional works to help cope with more extreme weather events.&#8221;<\/p>\n<p>An aerial view of a freight train in a remote part of the outback.<br \/>\nThe Trans-Australian Railway Line near Port Augusta in South Australia.(Supplied: ARTC)<br \/>\nThe federal funding includes $140 million for culvert upgrades to increase flood resilience from one-in-13-year events in WA, SA and NSW to one-in-100-year events. <\/p>\n<p>An additional $100 million will be spent replacing 47 kilograms per metre rail with 60 kilograms per metre steel to support larger trains between Kalgoorlie-Boulder in WA and Tarcoola in SA.<\/p>\n<p>&#8220;You&#8217;ve got to bear in mind that a lot of goods run east-west routinely, so we&#8217;ve got to mix that work in among those operations,&#8221; Mr Johnson said. <\/p>\n<p>&#8220;It could take years to get through the totality, but we&#8217;ll be starting within the financial year.&#8221;<\/p>\n<p>Flooding in the outback cuts a railway line.<br \/>\nThe Trans-Australian Railway Line was cut for three weeks after flooding at Rawlinna on the Nullarbor.(Supplied: Australian Rail Track Corporation)<br \/>\nHuge cost to economy<\/p>\n<p>According to the Australasian Railway Association (ARA), the east-west rail corridor is out of service on an average of 40 days every year due to flooding.<\/p>\n<p>With 56 per cent of the nation&#8217;s freight being moved by rail, ARA chief executive Caroline Wilkie said strengthening infrastructure to cope with these events was critical.<\/p>\n<p>&#8220;Repeated severe weather events, particularly flooding, have had a major impact on rail freight and passenger services and resulted in significant disruptions to our national supply chain,&#8221; she said. <\/p>\n<p>&#8220;Washouts on the east-west rail line alone cost the economy $320 million in 2022.&#8221;<\/p>\n<p>He smiles at the camera<br \/>\nWestern Roads Federation CEO Cam Dumesny welcomed the rail funding but says WA is still vulnerable to freight disruption.  (ABC Perth: Julian Robins)<\/p>\n","protected":false},"author":21,"featured_media":48023,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[273,999,163],"tags":[9214,9,8339,7527,9416,7],"class_list":["post-48022","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-australia","category-australia-politics","category-rail-industry-news-australia-new-zealand","tag-federal-budget-2024","tag-freight","tag-perth","tag-south-australia","tag-trans-australian-railway-line","tag-transport"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"More than $200 million will be spent upgrading large sections of the Trans-Australian Railway Line so the vital east-west freight link can withstand one-in-100-year weather events. It is part of a $1 billion program, which includes $540 million from the Commonwealth announced in this week&#039;s Federal Budget, designed to build more resilience into the national rail network. The Trans-Australian Railway line was completed in 1917 and converted to a standard gauge line in 1968 to form a continuous rail link between Sydney and Perth. But that link was severed for 21 days after widespread flooding hit the remote Nullarbor in March. The flooding also impacted WA&#039;s main road link with the east, the Eyre Highway, which had a flow-on effect on WA supermarket shelves. The Trans-Australian Railway line was also closed for 24 days in 2022 when floods damaged about 300 kilometres of track near Tarcoola in South Australia. Crew working to repair rail line during floods. Repair crews working on the Trans-Australian Railway Line near Rawlinna earlier this year.(Supplied: ARTC) Upgrades to take years Wayne Johnson, managing director of the Adelaide-based, federal-government-owned Australian Rail Track Corporation, described the funding as a &quot;shot in the arm&quot; for the rail industry. &quot;I was in Western Australia around Easter to see the effects on businesses and supermarket shelves and meet with representatives of the Western Australian government and the supply chain over there, and you can imagine their concern with repeated events,&quot; Mr Johnson said. &quot;We&#039;ve looked at hydrology with these weather patterns across the whole of our 8,500km network and updated a lot of our works. &quot;That money is going towards additional works to help cope with more extreme weather events.&quot; An aerial view of a freight train in a remote part of the outback. The Trans-Australian Railway Line near Port Augusta in South Australia.(Supplied: ARTC) The federal funding includes $140 million for culvert upgrades to increase flood resilience from one-in-13-year events in WA, SA and NSW to one-in-100-year events. An additional $100 million will be spent replacing 47 kilograms per metre rail with 60 kilograms per metre steel to support larger trains between Kalgoorlie-Boulder in WA and Tarcoola in SA. &quot;You&#039;ve got to bear in mind that a lot of goods run east-west routinely, so we&#039;ve got to mix that work in among those operations,&quot; Mr Johnson said. &quot;It could take years to get through the totality, but we&#039;ll be starting within the financial year.&quot; Flooding in the outback cuts a railway line. The Trans-Australian Railway Line was cut for three weeks after flooding at Rawlinna on the Nullarbor.(Supplied: Australian Rail Track Corporation) Huge cost to economy According to the Australasian Railway Association (ARA), the east-west rail corridor is out of service on an average of 40 days every year due to flooding. With 56 per cent of the nation&#039;s freight being moved by rail, ARA chief executive Caroline Wilkie said strengthening infrastructure to cope with these events was critical. &quot;Repeated severe weather events, particularly flooding, have had a major impact on rail freight and passenger services and resulted in significant disruptions to our national supply chain,&quot; she said. &quot;Washouts on the east-west rail line alone cost the economy $320 million in 2022.&quot; He smiles at the camera Western Roads Federation CEO Cam Dumesny welcomed the rail funding but says WA is still vulnerable to freight disruption. (ABC Perth: Julian Robins)\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Bardy Bigglesworth\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=48022\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Trans-Australian Railway to be flood-proofed as part of $1 billion program to grow rail network resilience\" \/>\n\t\t<meta property=\"og:description\" content=\"More than $200 million will be spent upgrading large sections of the Trans-Australian Railway Line so the vital east-west freight link can withstand one-in-100-year weather events. It is part of a $1 billion program, which includes $540 million from the Commonwealth announced in this week&#039;s Federal Budget, designed to build more resilience into the national rail network. The Trans-Australian Railway line was completed in 1917 and converted to a standard gauge line in 1968 to form a continuous rail link between Sydney and Perth. But that link was severed for 21 days after widespread flooding hit the remote Nullarbor in March. The flooding also impacted WA&#039;s main road link with the east, the Eyre Highway, which had a flow-on effect on WA supermarket shelves. The Trans-Australian Railway line was also closed for 24 days in 2022 when floods damaged about 300 kilometres of track near Tarcoola in South Australia. Crew working to repair rail line during floods. Repair crews working on the Trans-Australian Railway Line near Rawlinna earlier this year.(Supplied: ARTC) Upgrades to take years Wayne Johnson, managing director of the Adelaide-based, federal-government-owned Australian Rail Track Corporation, described the funding as a &quot;shot in the arm&quot; for the rail industry. &quot;I was in Western Australia around Easter to see the effects on businesses and supermarket shelves and meet with representatives of the Western Australian government and the supply chain over there, and you can imagine their concern with repeated events,&quot; Mr Johnson said. &quot;We&#039;ve looked at hydrology with these weather patterns across the whole of our 8,500km network and updated a lot of our works. &quot;That money is going towards additional works to help cope with more extreme weather events.&quot; An aerial view of a freight train in a remote part of the outback. The Trans-Australian Railway Line near Port Augusta in South Australia.(Supplied: ARTC) The federal funding includes $140 million for culvert upgrades to increase flood resilience from one-in-13-year events in WA, SA and NSW to one-in-100-year events. An additional $100 million will be spent replacing 47 kilograms per metre rail with 60 kilograms per metre steel to support larger trains between Kalgoorlie-Boulder in WA and Tarcoola in SA. &quot;You&#039;ve got to bear in mind that a lot of goods run east-west routinely, so we&#039;ve got to mix that work in among those operations,&quot; Mr Johnson said. &quot;It could take years to get through the totality, but we&#039;ll be starting within the financial year.&quot; Flooding in the outback cuts a railway line. The Trans-Australian Railway Line was cut for three weeks after flooding at Rawlinna on the Nullarbor.(Supplied: Australian Rail Track Corporation) Huge cost to economy According to the Australasian Railway Association (ARA), the east-west rail corridor is out of service on an average of 40 days every year due to flooding. With 56 per cent of the nation&#039;s freight being moved by rail, ARA chief executive Caroline Wilkie said strengthening infrastructure to cope with these events was critical. &quot;Repeated severe weather events, particularly flooding, have had a major impact on rail freight and passenger services and resulted in significant disruptions to our national supply chain,&quot; she said. &quot;Washouts on the east-west rail line alone cost the economy $320 million in 2022.&quot; He smiles at the camera Western Roads Federation CEO Cam Dumesny welcomed the rail funding but says WA is still vulnerable to freight disruption. (ABC Perth: Julian Robins)\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=48022\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/image-22.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/image-22.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"862\" \/>\n\t\t<meta property=\"og:image:height\" content=\"485\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-05-19T03:16:41+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-05-19T03:16:50+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Trans-Australian Railway to be flood-proofed as part of $1 billion program to grow rail network resilience\" \/>\n\t\t<meta name=\"twitter:description\" content=\"More than $200 million will be spent upgrading large sections of the Trans-Australian Railway Line so the vital east-west freight link can withstand one-in-100-year weather events. It is part of a $1 billion program, which includes $540 million from the Commonwealth announced in this week&#039;s Federal Budget, designed to build more resilience into the national rail network. The Trans-Australian Railway line was completed in 1917 and converted to a standard gauge line in 1968 to form a continuous rail link between Sydney and Perth. But that link was severed for 21 days after widespread flooding hit the remote Nullarbor in March. The flooding also impacted WA&#039;s main road link with the east, the Eyre Highway, which had a flow-on effect on WA supermarket shelves. The Trans-Australian Railway line was also closed for 24 days in 2022 when floods damaged about 300 kilometres of track near Tarcoola in South Australia. Crew working to repair rail line during floods. Repair crews working on the Trans-Australian Railway Line near Rawlinna earlier this year.(Supplied: ARTC) Upgrades to take years Wayne Johnson, managing director of the Adelaide-based, federal-government-owned Australian Rail Track Corporation, described the funding as a &quot;shot in the arm&quot; for the rail industry. &quot;I was in Western Australia around Easter to see the effects on businesses and supermarket shelves and meet with representatives of the Western Australian government and the supply chain over there, and you can imagine their concern with repeated events,&quot; Mr Johnson said. &quot;We&#039;ve looked at hydrology with these weather patterns across the whole of our 8,500km network and updated a lot of our works. &quot;That money is going towards additional works to help cope with more extreme weather events.&quot; An aerial view of a freight train in a remote part of the outback. The Trans-Australian Railway Line near Port Augusta in South Australia.(Supplied: ARTC) The federal funding includes $140 million for culvert upgrades to increase flood resilience from one-in-13-year events in WA, SA and NSW to one-in-100-year events. An additional $100 million will be spent replacing 47 kilograms per metre rail with 60 kilograms per metre steel to support larger trains between Kalgoorlie-Boulder in WA and Tarcoola in SA. &quot;You&#039;ve got to bear in mind that a lot of goods run east-west routinely, so we&#039;ve got to mix that work in among those operations,&quot; Mr Johnson said. &quot;It could take years to get through the totality, but we&#039;ll be starting within the financial year.&quot; Flooding in the outback cuts a railway line. The Trans-Australian Railway Line was cut for three weeks after flooding at Rawlinna on the Nullarbor.(Supplied: Australian Rail Track Corporation) Huge cost to economy According to the Australasian Railway Association (ARA), the east-west rail corridor is out of service on an average of 40 days every year due to flooding. With 56 per cent of the nation&#039;s freight being moved by rail, ARA chief executive Caroline Wilkie said strengthening infrastructure to cope with these events was critical. &quot;Repeated severe weather events, particularly flooding, have had a major impact on rail freight and passenger services and resulted in significant disruptions to our national supply chain,&quot; she said. &quot;Washouts on the east-west rail line alone cost the economy $320 million in 2022.&quot; He smiles at the camera Western Roads Federation CEO Cam Dumesny welcomed the rail funding but says WA is still vulnerable to freight disruption. (ABC Perth: Julian Robins)\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/image-22.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=48022#blogposting\",\"name\":\"Trans-Australian Railway to be flood-proofed as part of $1 billion program to grow rail network resilience\",\"headline\":\"Trans-Australian Railway to be flood-proofed as part of $1 billion program to grow rail network resilience\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=21#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/image-22.png\",\"width\":862,\"height\":485},\"datePublished\":\"2024-05-19T13:16:41+10:00\",\"dateModified\":\"2024-05-19T13:16:50+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=48022#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=48022#webpage\"},\"articleSection\":\"Australia, Australia Politics, Rail industry news (Australia, New Zealand), Federal Budget 2024, freight, Perth, South Australia, Trans-Australian Railway Line, transport\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=48022#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"name\":\"Rail industry news (Australia, New Zealand)\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"position\":2,\"name\":\"Rail industry news (Australia, New Zealand)\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=48022#listItem\",\"name\":\"Trans-Australian Railway to be flood-proofed as part of $1 billion program to grow rail network resilience\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=48022#listItem\",\"position\":3,\"name\":\"Trans-Australian Railway to be flood-proofed as part of $1 billion program to grow rail network resilience\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"name\":\"Rail industry news (Australia, New Zealand)\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=48022\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=48022\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=21#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=21\",\"name\":\"Bardy Bigglesworth\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=48022#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e3d1fce2fc3f81c2cf0bda5fbfee560ac033389e9a3983a9ee462907c5ca5c9d?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Bardy Bigglesworth\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=48022#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=48022\",\"name\":\"Trans-Australian Railway to be flood-proofed as part of $1 billion program to grow rail network resilience\",\"description\":\"More than $200 million will be spent upgrading large sections of the Trans-Australian Railway Line so the vital east-west freight link can withstand one-in-100-year weather events. It is part of a $1 billion program, which includes $540 million from the Commonwealth announced in this week's Federal Budget, designed to build more resilience into the national rail network. The Trans-Australian Railway line was completed in 1917 and converted to a standard gauge line in 1968 to form a continuous rail link between Sydney and Perth. But that link was severed for 21 days after widespread flooding hit the remote Nullarbor in March. The flooding also impacted WA's main road link with the east, the Eyre Highway, which had a flow-on effect on WA supermarket shelves. The Trans-Australian Railway line was also closed for 24 days in 2022 when floods damaged about 300 kilometres of track near Tarcoola in South Australia. Crew working to repair rail line during floods. Repair crews working on the Trans-Australian Railway Line near Rawlinna earlier this year.(Supplied: ARTC) Upgrades to take years Wayne Johnson, managing director of the Adelaide-based, federal-government-owned Australian Rail Track Corporation, described the funding as a \\\"shot in the arm\\\" for the rail industry. \\\"I was in Western Australia around Easter to see the effects on businesses and supermarket shelves and meet with representatives of the Western Australian government and the supply chain over there, and you can imagine their concern with repeated events,\\\" Mr Johnson said. \\\"We've looked at hydrology with these weather patterns across the whole of our 8,500km network and updated a lot of our works. \\\"That money is going towards additional works to help cope with more extreme weather events.\\\" An aerial view of a freight train in a remote part of the outback. The Trans-Australian Railway Line near Port Augusta in South Australia.(Supplied: ARTC) The federal funding includes $140 million for culvert upgrades to increase flood resilience from one-in-13-year events in WA, SA and NSW to one-in-100-year events. An additional $100 million will be spent replacing 47 kilograms per metre rail with 60 kilograms per metre steel to support larger trains between Kalgoorlie-Boulder in WA and Tarcoola in SA. \\\"You've got to bear in mind that a lot of goods run east-west routinely, so we've got to mix that work in among those operations,\\\" Mr Johnson said. \\\"It could take years to get through the totality, but we'll be starting within the financial year.\\\" Flooding in the outback cuts a railway line. The Trans-Australian Railway Line was cut for three weeks after flooding at Rawlinna on the Nullarbor.(Supplied: Australian Rail Track Corporation) Huge cost to economy According to the Australasian Railway Association (ARA), the east-west rail corridor is out of service on an average of 40 days every year due to flooding. With 56 per cent of the nation's freight being moved by rail, ARA chief executive Caroline Wilkie said strengthening infrastructure to cope with these events was critical. \\\"Repeated severe weather events, particularly flooding, have had a major impact on rail freight and passenger services and resulted in significant disruptions to our national supply chain,\\\" she said. \\\"Washouts on the east-west rail line alone cost the economy $320 million in 2022.\\\" He smiles at the camera Western Roads Federation CEO Cam Dumesny welcomed the rail funding but says WA is still vulnerable to freight disruption. (ABC Perth: Julian Robins)\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=48022#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=21#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=21#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/image-22.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=48022\\\/#mainImage\",\"width\":862,\"height\":485},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=48022#mainImage\"},\"datePublished\":\"2024-05-19T13:16:41+10:00\",\"dateModified\":\"2024-05-19T13:16:50+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Trans-Australian Railway to be flood-proofed as part of $1 billion program to grow rail network resilience<\/title>\n\n","aioseo_head_json":{"title":"Trans-Australian Railway to be flood-proofed as part of $1 billion program to grow rail network resilience","description":"More than $200 million will be spent upgrading large sections of the Trans-Australian Railway Line so the vital east-west freight link can withstand one-in-100-year weather events. It is part of a $1 billion program, which includes $540 million from the Commonwealth announced in this week's Federal Budget, designed to build more resilience into the national rail network. The Trans-Australian Railway line was completed in 1917 and converted to a standard gauge line in 1968 to form a continuous rail link between Sydney and Perth. But that link was severed for 21 days after widespread flooding hit the remote Nullarbor in March. The flooding also impacted WA's main road link with the east, the Eyre Highway, which had a flow-on effect on WA supermarket shelves. The Trans-Australian Railway line was also closed for 24 days in 2022 when floods damaged about 300 kilometres of track near Tarcoola in South Australia. Crew working to repair rail line during floods. Repair crews working on the Trans-Australian Railway Line near Rawlinna earlier this year.(Supplied: ARTC) Upgrades to take years Wayne Johnson, managing director of the Adelaide-based, federal-government-owned Australian Rail Track Corporation, described the funding as a \"shot in the arm\" for the rail industry. \"I was in Western Australia around Easter to see the effects on businesses and supermarket shelves and meet with representatives of the Western Australian government and the supply chain over there, and you can imagine their concern with repeated events,\" Mr Johnson said. \"We've looked at hydrology with these weather patterns across the whole of our 8,500km network and updated a lot of our works. \"That money is going towards additional works to help cope with more extreme weather events.\" An aerial view of a freight train in a remote part of the outback. The Trans-Australian Railway Line near Port Augusta in South Australia.(Supplied: ARTC) The federal funding includes $140 million for culvert upgrades to increase flood resilience from one-in-13-year events in WA, SA and NSW to one-in-100-year events. An additional $100 million will be spent replacing 47 kilograms per metre rail with 60 kilograms per metre steel to support larger trains between Kalgoorlie-Boulder in WA and Tarcoola in SA. \"You've got to bear in mind that a lot of goods run east-west routinely, so we've got to mix that work in among those operations,\" Mr Johnson said. \"It could take years to get through the totality, but we'll be starting within the financial year.\" Flooding in the outback cuts a railway line. The Trans-Australian Railway Line was cut for three weeks after flooding at Rawlinna on the Nullarbor.(Supplied: Australian Rail Track Corporation) Huge cost to economy According to the Australasian Railway Association (ARA), the east-west rail corridor is out of service on an average of 40 days every year due to flooding. With 56 per cent of the nation's freight being moved by rail, ARA chief executive Caroline Wilkie said strengthening infrastructure to cope with these events was critical. \"Repeated severe weather events, particularly flooding, have had a major impact on rail freight and passenger services and resulted in significant disruptions to our national supply chain,\" she said. \"Washouts on the east-west rail line alone cost the economy $320 million in 2022.\" He smiles at the camera Western Roads Federation CEO Cam Dumesny welcomed the rail funding but says WA is still vulnerable to freight disruption. (ABC Perth: Julian Robins)","canonical_url":"https:\/\/www.vibewire.com.au\/?p=48022","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=48022#blogposting","name":"Trans-Australian Railway to be flood-proofed as part of $1 billion program to grow rail network resilience","headline":"Trans-Australian Railway to be flood-proofed as part of $1 billion program to grow rail network resilience","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=21#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/image-22.png","width":862,"height":485},"datePublished":"2024-05-19T13:16:41+10:00","dateModified":"2024-05-19T13:16:50+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=48022#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=48022#webpage"},"articleSection":"Australia, Australia Politics, Rail industry news (Australia, New Zealand), Federal Budget 2024, freight, Perth, South Australia, Trans-Australian Railway Line, transport"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=48022#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","name":"Rail industry news (Australia, New Zealand)"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","position":2,"name":"Rail industry news (Australia, New Zealand)","item":"https:\/\/www.vibewire.com.au\/?cat=163","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=48022#listItem","name":"Trans-Australian Railway to be flood-proofed as part of $1 billion program to grow rail network resilience"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=48022#listItem","position":3,"name":"Trans-Australian Railway to be flood-proofed as part of $1 billion program to grow rail network resilience","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","name":"Rail industry news (Australia, New Zealand)"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=48022\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=48022\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=21#author","url":"https:\/\/www.vibewire.com.au\/?author=21","name":"Bardy Bigglesworth","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=48022#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/e3d1fce2fc3f81c2cf0bda5fbfee560ac033389e9a3983a9ee462907c5ca5c9d?s=96&d=mm&r=g","width":96,"height":96,"caption":"Bardy Bigglesworth"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=48022#webpage","url":"https:\/\/www.vibewire.com.au\/?p=48022","name":"Trans-Australian Railway to be flood-proofed as part of $1 billion program to grow rail network resilience","description":"More than $200 million will be spent upgrading large sections of the Trans-Australian Railway Line so the vital east-west freight link can withstand one-in-100-year weather events. It is part of a $1 billion program, which includes $540 million from the Commonwealth announced in this week's Federal Budget, designed to build more resilience into the national rail network. The Trans-Australian Railway line was completed in 1917 and converted to a standard gauge line in 1968 to form a continuous rail link between Sydney and Perth. But that link was severed for 21 days after widespread flooding hit the remote Nullarbor in March. The flooding also impacted WA's main road link with the east, the Eyre Highway, which had a flow-on effect on WA supermarket shelves. The Trans-Australian Railway line was also closed for 24 days in 2022 when floods damaged about 300 kilometres of track near Tarcoola in South Australia. Crew working to repair rail line during floods. Repair crews working on the Trans-Australian Railway Line near Rawlinna earlier this year.(Supplied: ARTC) Upgrades to take years Wayne Johnson, managing director of the Adelaide-based, federal-government-owned Australian Rail Track Corporation, described the funding as a \"shot in the arm\" for the rail industry. \"I was in Western Australia around Easter to see the effects on businesses and supermarket shelves and meet with representatives of the Western Australian government and the supply chain over there, and you can imagine their concern with repeated events,\" Mr Johnson said. \"We've looked at hydrology with these weather patterns across the whole of our 8,500km network and updated a lot of our works. \"That money is going towards additional works to help cope with more extreme weather events.\" An aerial view of a freight train in a remote part of the outback. The Trans-Australian Railway Line near Port Augusta in South Australia.(Supplied: ARTC) The federal funding includes $140 million for culvert upgrades to increase flood resilience from one-in-13-year events in WA, SA and NSW to one-in-100-year events. An additional $100 million will be spent replacing 47 kilograms per metre rail with 60 kilograms per metre steel to support larger trains between Kalgoorlie-Boulder in WA and Tarcoola in SA. \"You've got to bear in mind that a lot of goods run east-west routinely, so we've got to mix that work in among those operations,\" Mr Johnson said. \"It could take years to get through the totality, but we'll be starting within the financial year.\" Flooding in the outback cuts a railway line. The Trans-Australian Railway Line was cut for three weeks after flooding at Rawlinna on the Nullarbor.(Supplied: Australian Rail Track Corporation) Huge cost to economy According to the Australasian Railway Association (ARA), the east-west rail corridor is out of service on an average of 40 days every year due to flooding. With 56 per cent of the nation's freight being moved by rail, ARA chief executive Caroline Wilkie said strengthening infrastructure to cope with these events was critical. \"Repeated severe weather events, particularly flooding, have had a major impact on rail freight and passenger services and resulted in significant disruptions to our national supply chain,\" she said. \"Washouts on the east-west rail line alone cost the economy $320 million in 2022.\" He smiles at the camera Western Roads Federation CEO Cam Dumesny welcomed the rail funding but says WA is still vulnerable to freight disruption. (ABC Perth: Julian Robins)","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=48022#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=21#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=21#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/image-22.png","@id":"https:\/\/www.vibewire.com.au\/?p=48022\/#mainImage","width":862,"height":485},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=48022#mainImage"},"datePublished":"2024-05-19T13:16:41+10:00","dateModified":"2024-05-19T13:16:50+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Trans-Australian Railway to be flood-proofed as part of $1 billion program to grow rail network resilience","og:description":"More than $200 million will be spent upgrading large sections of the Trans-Australian Railway Line so the vital east-west freight link can withstand one-in-100-year weather events. It is part of a $1 billion program, which includes $540 million from the Commonwealth announced in this week's Federal Budget, designed to build more resilience into the national rail network. The Trans-Australian Railway line was completed in 1917 and converted to a standard gauge line in 1968 to form a continuous rail link between Sydney and Perth. But that link was severed for 21 days after widespread flooding hit the remote Nullarbor in March. The flooding also impacted WA's main road link with the east, the Eyre Highway, which had a flow-on effect on WA supermarket shelves. The Trans-Australian Railway line was also closed for 24 days in 2022 when floods damaged about 300 kilometres of track near Tarcoola in South Australia. Crew working to repair rail line during floods. Repair crews working on the Trans-Australian Railway Line near Rawlinna earlier this year.(Supplied: ARTC) Upgrades to take years Wayne Johnson, managing director of the Adelaide-based, federal-government-owned Australian Rail Track Corporation, described the funding as a &quot;shot in the arm&quot; for the rail industry. &quot;I was in Western Australia around Easter to see the effects on businesses and supermarket shelves and meet with representatives of the Western Australian government and the supply chain over there, and you can imagine their concern with repeated events,&quot; Mr Johnson said. &quot;We've looked at hydrology with these weather patterns across the whole of our 8,500km network and updated a lot of our works. &quot;That money is going towards additional works to help cope with more extreme weather events.&quot; An aerial view of a freight train in a remote part of the outback. The Trans-Australian Railway Line near Port Augusta in South Australia.(Supplied: ARTC) The federal funding includes $140 million for culvert upgrades to increase flood resilience from one-in-13-year events in WA, SA and NSW to one-in-100-year events. An additional $100 million will be spent replacing 47 kilograms per metre rail with 60 kilograms per metre steel to support larger trains between Kalgoorlie-Boulder in WA and Tarcoola in SA. &quot;You've got to bear in mind that a lot of goods run east-west routinely, so we've got to mix that work in among those operations,&quot; Mr Johnson said. &quot;It could take years to get through the totality, but we'll be starting within the financial year.&quot; Flooding in the outback cuts a railway line. The Trans-Australian Railway Line was cut for three weeks after flooding at Rawlinna on the Nullarbor.(Supplied: Australian Rail Track Corporation) Huge cost to economy According to the Australasian Railway Association (ARA), the east-west rail corridor is out of service on an average of 40 days every year due to flooding. With 56 per cent of the nation's freight being moved by rail, ARA chief executive Caroline Wilkie said strengthening infrastructure to cope with these events was critical. &quot;Repeated severe weather events, particularly flooding, have had a major impact on rail freight and passenger services and resulted in significant disruptions to our national supply chain,&quot; she said. &quot;Washouts on the east-west rail line alone cost the economy $320 million in 2022.&quot; He smiles at the camera Western Roads Federation CEO Cam Dumesny welcomed the rail funding but says WA is still vulnerable to freight disruption. (ABC Perth: Julian Robins)","og:url":"https:\/\/www.vibewire.com.au\/?p=48022","og:image":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/image-22.png","og:image:secure_url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/image-22.png","og:image:width":"862","og:image:height":"485","article:published_time":"2024-05-19T03:16:41+00:00","article:modified_time":"2024-05-19T03:16:50+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Trans-Australian Railway to be flood-proofed as part of $1 billion program to grow rail network resilience","twitter:description":"More than $200 million will be spent upgrading large sections of the Trans-Australian Railway Line so the vital east-west freight link can withstand one-in-100-year weather events. It is part of a $1 billion program, which includes $540 million from the Commonwealth announced in this week's Federal Budget, designed to build more resilience into the national rail network. The Trans-Australian Railway line was completed in 1917 and converted to a standard gauge line in 1968 to form a continuous rail link between Sydney and Perth. But that link was severed for 21 days after widespread flooding hit the remote Nullarbor in March. The flooding also impacted WA's main road link with the east, the Eyre Highway, which had a flow-on effect on WA supermarket shelves. The Trans-Australian Railway line was also closed for 24 days in 2022 when floods damaged about 300 kilometres of track near Tarcoola in South Australia. Crew working to repair rail line during floods. Repair crews working on the Trans-Australian Railway Line near Rawlinna earlier this year.(Supplied: ARTC) Upgrades to take years Wayne Johnson, managing director of the Adelaide-based, federal-government-owned Australian Rail Track Corporation, described the funding as a &quot;shot in the arm&quot; for the rail industry. &quot;I was in Western Australia around Easter to see the effects on businesses and supermarket shelves and meet with representatives of the Western Australian government and the supply chain over there, and you can imagine their concern with repeated events,&quot; Mr Johnson said. &quot;We've looked at hydrology with these weather patterns across the whole of our 8,500km network and updated a lot of our works. &quot;That money is going towards additional works to help cope with more extreme weather events.&quot; An aerial view of a freight train in a remote part of the outback. The Trans-Australian Railway Line near Port Augusta in South Australia.(Supplied: ARTC) The federal funding includes $140 million for culvert upgrades to increase flood resilience from one-in-13-year events in WA, SA and NSW to one-in-100-year events. An additional $100 million will be spent replacing 47 kilograms per metre rail with 60 kilograms per metre steel to support larger trains between Kalgoorlie-Boulder in WA and Tarcoola in SA. &quot;You've got to bear in mind that a lot of goods run east-west routinely, so we've got to mix that work in among those operations,&quot; Mr Johnson said. &quot;It could take years to get through the totality, but we'll be starting within the financial year.&quot; Flooding in the outback cuts a railway line. The Trans-Australian Railway Line was cut for three weeks after flooding at Rawlinna on the Nullarbor.(Supplied: Australian Rail Track Corporation) Huge cost to economy According to the Australasian Railway Association (ARA), the east-west rail corridor is out of service on an average of 40 days every year due to flooding. With 56 per cent of the nation's freight being moved by rail, ARA chief executive Caroline Wilkie said strengthening infrastructure to cope with these events was critical. &quot;Repeated severe weather events, particularly flooding, have had a major impact on rail freight and passenger services and resulted in significant disruptions to our national supply chain,&quot; she said. &quot;Washouts on the east-west rail line alone cost the economy $320 million in 2022.&quot; He smiles at the camera Western Roads Federation CEO Cam Dumesny welcomed the rail funding but says WA is still vulnerable to freight disruption. (ABC Perth: Julian Robins)","twitter:creator":"@VibewireCentral","twitter:image":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/image-22.png"},"aioseo_meta_data":{"post_id":"48022","title":"#post_title","description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":"#post_excerpt","og_object_type":"default","og_image_type":"featured","og_image_url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/image-22.png","og_image_width":"862","og_image_height":"485","og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"seo_analyzer_scan_date":"2026-06-20 11:13:33","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-05-19 03:16:51","updated":"2026-06-20 11:13:33"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=163\" title=\"Rail industry news (Australia, New Zealand)\">Rail industry news (Australia, New Zealand)<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tTrans-Australian Railway to be flood-proofed as part of $1 billion program to grow rail network resilience\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail industry news (Australia, New Zealand)","link":"https:\/\/www.vibewire.com.au\/?cat=163"},{"label":"Trans-Australian Railway to be flood-proofed as part of $1 billion program to grow rail network resilience","link":"https:\/\/www.vibewire.com.au\/?p=48022"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/48022","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=48022"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/48022\/revisions"}],"predecessor-version":[{"id":48024,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/48022\/revisions\/48024"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/media\/48023"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=48022"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=48022"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=48022"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}