{"id":476611,"date":"2026-07-13T18:56:31","date_gmt":"2026-07-13T08:56:31","guid":{"rendered":"https:\/\/www.railfreight.com\/?p=72635"},"modified":"2026-07-13T18:56:31","modified_gmt":"2026-07-13T08:56:31","slug":"north-macedonia-completes-capital-city-freight-bypass-for-shorter-transit-times","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=476611","title":{"rendered":"North Macedonia completes capital city freight bypass for shorter transit times"},"content":{"rendered":"<p><strong>North Macedonia has completed the rehabilitation of the Skopje rail freight bypass. The reinstatement of operations on the railway comes ahead of schedule and should help attract more freight on the route.<\/strong><br \/>\n<span id=\"more-72635\"><\/span>Previously, freight trains had to travel straight through the city centre. That situation has now come to an end. \u201cThis is important from two aspects. First, from an environmental perspective, because freight traffic is being diverted from the center of Skopje\u201d, commented the North Macedonian Minister of Transport and Communications Aleksandar Nikoloski.<\/p>\n<p>The second benefit is that \u201ctravel time will be shortened and Macedonia will become more attractive for cargo traffic\u201d, Nikoloski added. The minister did not elaborate on the time gains.<\/p>\n<p>The bypass is not an entirely new railway. However, the state of the infrastructure had deteriorated to such an extent that freight could not reliably run on the section anymore. \u201cTogether with the [infrastructure manager] PE &#8216;Railways and Infrastructure&#8217;, we worked on a complete reconstruction and the project was completed in record time\u201d, explained Nikoloski.<\/p>\n<h2>Border crossings<\/h2>\n<p>North Macedonia and Greece opened a \u201cone-stop shop\u201d facility at their common border earlier. Rather than having to stop twice, freight trains only have one stop to pass. This is exerting a positive effect on freight operations, added Nikoloski.<\/p>\n<p>It looks like North Macedonia wants to emulate this model on its northern border with Serbia. \u201cWe are currently working on a joint railway border crossing with <a href=\"https:\/\/www.railfreight.com\/railfreight\/2026\/04\/07\/serbia-hungary-and-north-macedonia-sign-mou-with-focus-on-bube-railway\/\"  rel=\"noopener\">Serbia<\/a>, which will further speed up transport\u201d, the transport minister is quoted as saying in local media.<\/p>\n<aside class=\"readmore\">\n<div class=\"readmore-item\"><a href=\"https:\/\/www.railfreight.com\/infrastructure\/2026\/03\/09\/bulgaria-north-macedonia-rail-border-crossing-to-be-ready-in-2030\/\"><img decoding=\"async\" src=\"https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/03\/Bulgaria-North-Macedonia-128x128.jpeg\" alt=\"\" class=\"readmore-thumbnail\" \/><\/a><\/p>\n<div class=\"readmore-info\"><a href=\"https:\/\/www.railfreight.com\/infrastructure\/2026\/03\/09\/bulgaria-north-macedonia-rail-border-crossing-to-be-ready-in-2030\/\" class=\"readmore-title\">Bulgaria-North Macedonia rail border crossing to be ready in 2030<\/a><\/div>\n<\/div>\n<\/aside>\n","protected":false},"excerpt":{"rendered":"<p>North Macedonia has completed the rehabilitation of the Skopje rail freight bypass. The reinstatement of operations on the railway comes ahead of schedule and should\u2026<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[67,343,471,16473,78,47,124,15354],"tags":[12634],"class_list":["post-476611","post","type-post","status-publish","format-standard","hentry","category-greece","category-infrastructure","category-news","category-north-macedonia","category-rail-freight","category-rail-news","category-serbia","category-skopje","tag-railfreight"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.10 - aioseo.com -->\n\t<meta name=\"description\" content=\"North Macedonia has completed the rehabilitation of the Skopje rail freight bypass. The reinstatement of operations on the railway comes ahead of schedule and should\u2026\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=476611\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.10\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"North Macedonia completes capital city freight bypass for shorter transit times - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"North Macedonia has completed the rehabilitation of the Skopje rail freight bypass. The reinstatement of operations on the railway comes ahead of schedule and should\u2026\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=476611\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-07-13T08:56:31+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-07-13T08:56:31+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"North Macedonia completes capital city freight bypass for shorter transit times - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"North Macedonia has completed the rehabilitation of the Skopje rail freight bypass. The reinstatement of operations on the railway comes ahead of schedule and should\u2026\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=476611#blogposting\",\"name\":\"North Macedonia completes capital city freight bypass for shorter transit times - VibeWire Magazine\",\"headline\":\"North Macedonia completes capital city freight bypass for shorter transit times\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.railfreight.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Bulgaria-North-Macedonia-128x128.jpeg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=476611\\\/#articleImage\"},\"datePublished\":\"2026-07-13T18:56:31+10:00\",\"dateModified\":\"2026-07-13T18:56:31+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=476611#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=476611#webpage\"},\"articleSection\":\"Greece, Infrastructure, News, North Macedonia, Rail freight, Rail News, Serbia, Skopje, RailFreight\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=476611#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=476611#listItem\",\"name\":\"North Macedonia completes capital city freight bypass for shorter transit times\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=476611#listItem\",\"position\":3,\"name\":\"North Macedonia completes capital city freight bypass for shorter transit times\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=476611\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=476611\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=476611#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=476611#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=476611\",\"name\":\"North Macedonia completes capital city freight bypass for shorter transit times - VibeWire Magazine\",\"description\":\"North Macedonia has completed the rehabilitation of the Skopje rail freight bypass. The reinstatement of operations on the railway comes ahead of schedule and should\\u2026\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=476611#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"datePublished\":\"2026-07-13T18:56:31+10:00\",\"dateModified\":\"2026-07-13T18:56:31+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>North Macedonia completes capital city freight bypass for shorter transit times - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"North Macedonia completes capital city freight bypass for shorter transit times - VibeWire Magazine","description":"North Macedonia has completed the rehabilitation of the Skopje rail freight bypass. The reinstatement of operations on the railway comes ahead of schedule and should\u2026","canonical_url":"https:\/\/www.vibewire.com.au\/?p=476611","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=476611#blogposting","name":"North Macedonia completes capital city freight bypass for shorter transit times - VibeWire Magazine","headline":"North Macedonia completes capital city freight bypass for shorter transit times","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/03\/Bulgaria-North-Macedonia-128x128.jpeg","@id":"https:\/\/www.vibewire.com.au\/?p=476611\/#articleImage"},"datePublished":"2026-07-13T18:56:31+10:00","dateModified":"2026-07-13T18:56:31+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=476611#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=476611#webpage"},"articleSection":"Greece, Infrastructure, News, North Macedonia, Rail freight, Rail News, Serbia, Skopje, RailFreight"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=476611#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=476611#listItem","name":"North Macedonia completes capital city freight bypass for shorter transit times"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=476611#listItem","position":3,"name":"North Macedonia completes capital city freight bypass for shorter transit times","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=476611\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=476611\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=476611#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=476611#webpage","url":"https:\/\/www.vibewire.com.au\/?p=476611","name":"North Macedonia completes capital city freight bypass for shorter transit times - VibeWire Magazine","description":"North Macedonia has completed the rehabilitation of the Skopje rail freight bypass. The reinstatement of operations on the railway comes ahead of schedule and should\u2026","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=476611#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"datePublished":"2026-07-13T18:56:31+10:00","dateModified":"2026-07-13T18:56:31+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"North Macedonia completes capital city freight bypass for shorter transit times - VibeWire Magazine","og:description":"North Macedonia has completed the rehabilitation of the Skopje rail freight bypass. The reinstatement of operations on the railway comes ahead of schedule and should\u2026","og:url":"https:\/\/www.vibewire.com.au\/?p=476611","article:published_time":"2026-07-13T08:56:31+00:00","article:modified_time":"2026-07-13T08:56:31+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"North Macedonia completes capital city freight bypass for shorter transit times - VibeWire Magazine","twitter:description":"North Macedonia has completed the rehabilitation of the Skopje rail freight bypass. The reinstatement of operations on the railway comes ahead of schedule and should\u2026","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"476611","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-07-13 09:38:30","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2026-07-13 09:34:47","updated":"2026-07-13 09:38:30"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tNorth Macedonia completes capital city freight bypass for shorter transit times\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"North Macedonia completes capital city freight bypass for shorter transit times","link":"https:\/\/www.vibewire.com.au\/?p=476611"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/476611","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=476611"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/476611\/revisions"}],"predecessor-version":[{"id":476613,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/476611\/revisions\/476613"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=476611"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=476611"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=476611"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}