{"id":4643,"date":"2024-01-24T02:00:58","date_gmt":"2024-01-23T16:00:58","guid":{"rendered":"https:\/\/www.rtands.com\/?p=52003"},"modified":"2024-01-24T02:00:58","modified_gmt":"2024-01-23T16:00:58","slug":"182mm-utility-relocation-contract-awarded-for-second-avenue-subway-phase-2","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=4643","title":{"rendered":"$182MM Utility Relocation Contract Awarded for Second Avenue Subway Phase 2"},"content":{"rendered":"<p>NEW YORK CITY \u2013 For Phase 2 of the Second Avenue Subway Project, a $182 million utility relocation contract was awarded to C.A.C. Industries. The project will extend the Q train to East Harlem.<\/p>\n<p>The post <a rel=\"nofollow\" href=\"https:\/\/www.rtands.com\/track-construction\/182mm-utility-relocation-contract-awarded-for-second-avenue-subway-phase-2\/\">$182MM Utility Relocation Contract Awarded for Second Avenue Subway Phase 2<\/a> appeared first on <a rel=\"nofollow\" href=\"https:\/\/www.rtands.com\/\">Railway Track and Structures<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>NEW YORK CITY \u2013 For Phase 2 of the Second Avenue Subway Project, a $182 million utility relocation contract was awarded to C.A.C. Industries. The project will extend the Q train to East Harlem.<br \/>\nThe post $182MM Utility Relocation Contract Awarded for Se&#8230;<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[35,57,1816,49,51,1817,1818,58,1819],"tags":[],"class_list":["post-4643","post","type-post","status-publish","format-standard","hentry","category-breaking-news","category-commuter-regional","category-mta","category-passenger","category-passenger-rail","category-q-train","category-second-avenue-subway-phase-2","category-track-construction","category-utility-relocation-contract"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/4643","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4643"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/4643\/revisions"}],"predecessor-version":[{"id":4644,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/4643\/revisions\/4644"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4643"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4643"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4643"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}