{"id":459978,"date":"2026-06-22T19:27:01","date_gmt":"2026-06-22T09:27:01","guid":{"rendered":"https:\/\/www.railfreight.com\/?p=71995"},"modified":"2026-06-22T19:27:01","modified_gmt":"2026-06-22T09:27:01","slug":"contract-assigned-for-feasibility-study-for-romania-bulgaria-future-bridge","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=459978","title":{"rendered":"Contract assigned for feasibility study for Romania-Bulgaria future bridge"},"content":{"rendered":"<p><strong>The construction of a new rail-road bridge across the Danube between Romania and Bulgaria entered its next phase after Egis Rom\u00e2nia was selected to carry out a feasibility study. The bridge will connect Giurgiu to Ruse and is part of a larger initiative to create an electrified rail link between Bucharest and the Bulgarian network.<\/strong><br \/>\n<span id=\"more-71995\"><\/span>Egis\u2019 winning offer was set at 50.04 million RON (9.55 million euros), according to the Director General of CNAIR (Romania\u2019s national road infrastructure company) Cristian Pistol. The company will have 23 months after signing the contract to complete the study. The signature is expected this or next week, provided that no objections are presented.<\/p>\n<p>The feasibility study is partly funded by the Connecting Europe Facility 2, which allocated 6.9 million euros for it in 2024. This will be the second bridge connecting Giurgiu and Ruse, with the first one currently being renovated. The Giurgiu-Ruse II bridge will thus create redundancy for rail freight across the Danube, with costs for freight operators expected to significantly drop.<\/p>\n<aside class=\"readmore\">\n<div class=\"readmore-item\"><a href=\"https:\/\/www.railfreight.com\/infrastructure\/2026\/02\/02\/bulgaria-greece-and-romania-to-look-for-funding-for-thessaloniki-bucharest-corridor\/\"><img decoding=\"async\" src=\"https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/02\/4_0-128x128.jpeg\" alt=\"\" class=\"readmore-thumbnail\" \/><\/a><\/p>\n<div class=\"readmore-info\"><a href=\"https:\/\/www.railfreight.com\/infrastructure\/2026\/02\/02\/bulgaria-greece-and-romania-to-look-for-funding-for-thessaloniki-bucharest-corridor\/\" class=\"readmore-title\">Bulgaria, Greece and Romania to look for funding for Thessaloniki-Bucharest corridor<\/a><\/div>\n<\/div>\n<\/aside>\n<h2>Improving Romania-Bulgaria connectivity<\/h2>\n<p>Related to this, Romania\u2019s Minister of Transport Claudiu Stanciu, also gave an update on the renovation of the whole line between Romania\u2019s capital and Bulgaria. Electrification of the line and the installation of ERTMS level 2 are the next steps. Stanciu specified that, so far, 7% of the project has been completed. \u201cA long execution road ahead \u2014 but on a section where delay has already cost this corridor decades.\u201d, he said on LinkedIn.<\/p>\n<p>For its part, Bulgaria is also planning to build two new bridges across the Danube, between Nikopol (BG) and Turnu Magurele (RO) and between Silistra (BG) and C\u0103l\u0103ra\u0219i (RO). All these projects have two main raisins d\u2019etre. First, it will improve rail freight connectivity to and from the Greek ports of Piraeus and Thessaloniki along the TEN-T corridor linking the Aegean, Black and Baltic Seas.<\/p>\n<p>Secondly, it will also serve as an important artery for military mobility, as Stanciu also underlined. \u201cThe section also sits on a NATO movement axis toward the southern flank \u2014 making this dual-use infrastructure in the most direct sense\u201d, he said on a LinkedIn post.<\/p>\n<figure style=\"max-width: 100%; margin: 20px auto; border-radius: 6px; overflow: hidden; box-shadow: 0 2px 8px rgba(0, 0, 0, 0.1);\"><img fetchpriority=\"high\" decoding=\"async\" class=\"fluid alignnone\" style=\"width: 100%; height: auto; display: block;\" src=\"https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/06\/Construction-along-the-Bucharest-Giurgiu-line.jpeg\" alt=\"Construction along the Bucharest-Giurgiu line\" width=\"1600\" height=\"1200\" \/><figcaption style=\"padding: 10px 15px; font-size: 14px; background: #f8f8f8; text-align: left; color: #555;\">Construction along the Bucharest-Giurgiu line. Image: LinkedIn \u00a9 Claudiu Staicu<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The construction of a new rail-road bridge across the Danube between Romania and Bulgaria entered its next phase after Egis Rom\u00e2nia was selected to carry\u2026<\/p>\n","protected":false},"author":9,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[3339,19451,343,471,47,3341],"tags":[12634],"class_list":["post-459978","post","type-post","status-publish","format-standard","hentry","category-bulgaria","category-danube","category-infrastructure","category-news","category-rail-news","category-romania","tag-railfreight"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"The construction of a new rail-road bridge across the Danube between Romania and Bulgaria entered its next phase after Egis Rom\u00e2nia was selected to carry\u2026\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Marco Raimondi\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=459978\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Contract assigned for feasibility study for Romania-Bulgaria future bridge - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"The construction of a new rail-road bridge across the Danube between Romania and Bulgaria entered its next phase after Egis Rom\u00e2nia was selected to carry\u2026\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=459978\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-06-22T09:27:01+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-06-22T09:27:01+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Contract assigned for feasibility study for Romania-Bulgaria future bridge - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The construction of a new rail-road bridge across the Danube between Romania and Bulgaria entered its next phase after Egis Rom\u00e2nia was selected to carry\u2026\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=459978#blogposting\",\"name\":\"Contract assigned for feasibility study for Romania-Bulgaria future bridge - VibeWire Magazine\",\"headline\":\"Contract assigned for feasibility study for Romania-Bulgaria future bridge\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.railfreight.com\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/4_0-128x128.jpeg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=459978\\\/#articleImage\"},\"datePublished\":\"2026-06-22T19:27:01+10:00\",\"dateModified\":\"2026-06-22T19:27:01+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=459978#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=459978#webpage\"},\"articleSection\":\"Bulgaria, Danube, Infrastructure, News, Rail News, Romania, RailFreight\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=459978#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=459978#listItem\",\"name\":\"Contract assigned for feasibility study for Romania-Bulgaria future bridge\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=459978#listItem\",\"position\":3,\"name\":\"Contract assigned for feasibility study for Romania-Bulgaria future bridge\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=459978\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=459978\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9\",\"name\":\"Marco Raimondi\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=459978#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fc241b4d8352e3e7ca08ec32c4ebd712ae862e0499265d83515e97acb5510625?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Marco Raimondi\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=459978#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=459978\",\"name\":\"Contract assigned for feasibility study for Romania-Bulgaria future bridge - VibeWire Magazine\",\"description\":\"The construction of a new rail-road bridge across the Danube between Romania and Bulgaria entered its next phase after Egis Rom\\u00e2nia was selected to carry\\u2026\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=459978#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9#author\"},\"datePublished\":\"2026-06-22T19:27:01+10:00\",\"dateModified\":\"2026-06-22T19:27:01+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Contract assigned for feasibility study for Romania-Bulgaria future bridge - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Contract assigned for feasibility study for Romania-Bulgaria future bridge - VibeWire Magazine","description":"The construction of a new rail-road bridge across the Danube between Romania and Bulgaria entered its next phase after Egis Rom\u00e2nia was selected to carry\u2026","canonical_url":"https:\/\/www.vibewire.com.au\/?p=459978","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=459978#blogposting","name":"Contract assigned for feasibility study for Romania-Bulgaria future bridge - VibeWire Magazine","headline":"Contract assigned for feasibility study for Romania-Bulgaria future bridge","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=9#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/02\/4_0-128x128.jpeg","@id":"https:\/\/www.vibewire.com.au\/?p=459978\/#articleImage"},"datePublished":"2026-06-22T19:27:01+10:00","dateModified":"2026-06-22T19:27:01+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=459978#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=459978#webpage"},"articleSection":"Bulgaria, Danube, Infrastructure, News, Rail News, Romania, RailFreight"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=459978#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=459978#listItem","name":"Contract assigned for feasibility study for Romania-Bulgaria future bridge"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=459978#listItem","position":3,"name":"Contract assigned for feasibility study for Romania-Bulgaria future bridge","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=459978\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=459978\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=9#author","url":"https:\/\/www.vibewire.com.au\/?author=9","name":"Marco Raimondi","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=459978#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/fc241b4d8352e3e7ca08ec32c4ebd712ae862e0499265d83515e97acb5510625?s=96&d=mm&r=g","width":96,"height":96,"caption":"Marco Raimondi"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=459978#webpage","url":"https:\/\/www.vibewire.com.au\/?p=459978","name":"Contract assigned for feasibility study for Romania-Bulgaria future bridge - VibeWire Magazine","description":"The construction of a new rail-road bridge across the Danube between Romania and Bulgaria entered its next phase after Egis Rom\u00e2nia was selected to carry\u2026","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=459978#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=9#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=9#author"},"datePublished":"2026-06-22T19:27:01+10:00","dateModified":"2026-06-22T19:27:01+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Contract assigned for feasibility study for Romania-Bulgaria future bridge - VibeWire Magazine","og:description":"The construction of a new rail-road bridge across the Danube between Romania and Bulgaria entered its next phase after Egis Rom\u00e2nia was selected to carry\u2026","og:url":"https:\/\/www.vibewire.com.au\/?p=459978","article:published_time":"2026-06-22T09:27:01+00:00","article:modified_time":"2026-06-22T09:27:01+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Contract assigned for feasibility study for Romania-Bulgaria future bridge - VibeWire Magazine","twitter:description":"The construction of a new rail-road bridge across the Danube between Romania and Bulgaria entered its next phase after Egis Rom\u00e2nia was selected to carry\u2026","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"459978","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-06-22 09:46:14","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2026-06-22 09:43:58","updated":"2026-06-22 09:46:14"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tContract assigned for feasibility study for Romania-Bulgaria future bridge\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"Contract assigned for feasibility study for Romania-Bulgaria future bridge","link":"https:\/\/www.vibewire.com.au\/?p=459978"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/459978","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=459978"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/459978\/revisions"}],"predecessor-version":[{"id":460185,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/459978\/revisions\/460185"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=459978"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=459978"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=459978"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}