{"id":449190,"date":"2026-06-08T18:55:00","date_gmt":"2026-06-08T08:55:00","guid":{"rendered":"https:\/\/railuk.com\/?p=194313"},"modified":"2026-06-08T18:55:00","modified_gmt":"2026-06-08T08:55:00","slug":"major-upgrade-to-improve-reliability-for-passengers-under-way-on-thameslink-route-through-central-london-3","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=449190","title":{"rendered":"Major upgrade to improve reliability for passengers under way on Thameslink route through central London"},"content":{"rendered":"<p><a href=\"https:\/\/railuk.com\/infrastructure\/major-upgrade-to-improve-reliability-for-passengers-under-way-on-thameslink-route-through-central-london\/\" title=\"Major upgrade to improve reliability for passengers under way on Thameslink route through central London\" rel=\"nofollow\"><img loading=\"lazy\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/06\/05134137\/Blackfriars-station-2_cropped-1-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\" style=\"display: block; margin-bottom: 5px; clear:both;max-width: 100%;\" link_thumbnail=\"1\" decoding=\"async\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/06\/05134137\/Blackfriars-station-2_cropped-1-485x360.jpg 485w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/06\/05134137\/Blackfriars-station-2_cropped-1-80x60.jpg 80w\" sizes=\"auto, (max-width: 485px) 100vw, 485px\" \/><\/a><\/p>\n<p class=\"wp-block-paragraph\">Work has begun to upgrade a signalling system as part of major measures to improve reliability on one of the busiest parts of the rail network used by Thameslink, which this week transferred to public ownership.<\/p>\n<p class=\"wp-block-paragraph\">As part of Network Rail\u2019s ongoing investment to improve&nbsp;journeys&nbsp;and&nbsp;provide&nbsp;a&nbsp;dependable service for millions of customers across the UK, engineers are installing a back-up train detection system between London Blackfriars and Farringdon to prevent delays.&nbsp;&nbsp;<\/p>\n<p class=\"wp-block-paragraph\">Network Rail is also replacing the 20MW electrical substation between City&nbsp;Thameslink&nbsp;and Blackfriars station. This is the largest on the 750V third-rail network and is placed under heavy load with the volume of trains passing through.<\/p>\n<p class=\"wp-block-paragraph\">And following a successful trial, Network Rail and&nbsp;Thameslink&nbsp;are also looking to fit thermal imaging cameras permanently to the front of Thameslink trains to detect \u2018heat spots\u2019 and catch faults before they even happen.<\/p>\n<p class=\"wp-block-paragraph\">The Thameslink \u2018core\u2019 route between London St Pancras International and Blackfriars is one of the most intensively used sections of railway in the UK, with up to 44 trains per hour on a two-track system connecting services from Kent,&nbsp;Sussex&nbsp;and the East Midlands through the heart of&nbsp;London.&nbsp;&nbsp;<\/p>\n<p class=\"wp-block-paragraph\">With&nbsp;frequent&nbsp;trains and no diversionary routes available, even small faults can quickly cause disruption across the network, as far afield as Brighton and Cambridge or Horsham and Peterborough.&nbsp;<\/p>\n<p class=\"wp-block-paragraph\">Work has already begun on the signalling upgrade, with two more weekend track closures planned for June carefully planned to reduce overall disruption while allowing engineers the time they need to complete the upgrades safely.&nbsp;<\/p>\n<p class=\"wp-block-paragraph\"><strong>Louise Greaves, Network Rail\u2019s Infrastructure Director said:<\/strong>&nbsp;\u201cThe heart of Thameslink, in central London, is one of the most critical sections of railway in the country, where even small issues can quickly have&nbsp;a big impact&nbsp;on thousands of passengers.&nbsp;<\/p>\n<p class=\"wp-block-paragraph\">\u201cBy installing a dual detection system, upgrading the power supply and looking at the fitment of train cameras,&nbsp;we\u2019re&nbsp;making a targeted investment in reliability and resilience. Two detection systems means that even if one fails, trains can keep moving, reducing&nbsp;disruption&nbsp;and improving journeys for passengers.\u201d&nbsp;<\/p>\n<p class=\"wp-block-paragraph\"><strong>Jenny Saunders, Thameslink\u2019s Customer Service Director, said:<\/strong>&nbsp;\u201cThese upgrades are a really important step towards reducing delays and giving customers a more consistent, dependable service in the future. We know how important reliable journeys through central London are.<\/p>\n<p class=\"wp-block-paragraph\">\u201cWe\u2019re sorry to customers who may be affected while this work takes place, and we\u2019ll be working closely with Network Rail to keep people moving and provide clear, up-to-date travel information. I\u2019d strongly encourage anyone planning to travel over these weekends to check their journey before they travel.\u201d<\/p>\n<p class=\"wp-block-paragraph\">&#8216;Dual detection&#8217; technology has already been introduced&nbsp;successfully north of Farringdon in&nbsp;2020, where delays caused by track circuit failures have&nbsp;declined.&nbsp;Similar improvements are expected once the new system is in place between Blackfriars and Farringdon.&nbsp;<\/p>\n<p class=\"wp-block-paragraph\">Following installation, the system will be tested over the autumn of 2026, with final commissioning planned by the end of the year.&nbsp;<\/p>\n<p class=\"wp-block-paragraph\">Image credit: Network Rail<\/p>\n","protected":false},"excerpt":{"rendered":"<p><a href=\"https:\/\/railuk.com\/infrastructure\/major-upgrade-to-improve-reliability-for-passengers-under-way-on-thameslink-route-through-central-london\/\" title=\"Major upgrade to improve reliability for passengers under way on Thameslink route through central London\" rel=\"nofollow\"><img loading=\"lazy\" decoding=\"async\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/06\/05134137\/Blackfriars-station-2_cropped-1-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\"><\/a>Work has begun to upgrade a signalling system as part of major measures to improve reliability on one of the busiest parts of the rail network used by Thameslink, which this week transferred to public ownership. As part of Network Rail\u2019s ongoing investment to improve\u00a0journeys\u00a0and\u00a0provide\u00a0a\u00a0dependable service for millions of customers across the UK, engineers are [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[16013,16017,343,47,16148,85],"tags":[],"class_list":["post-449190","post","type-post","status-publish","format-standard","hentry","category-general-interest","category-industry-news","category-infrastructure","category-rail-news","category-rail-projects","category-uk"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.10 - aioseo.com -->\n\t<meta name=\"description\" content=\"Work has begun to upgrade a signalling system as part of major measures to improve reliability on one of the busiest parts of the rail network used by Thameslink, which this week transferred to public ownership. As part of Network Rail\u2019s ongoing investment to improve journeys and provide a dependable service for millions of customers across the UK, engineers are [\u2026]\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=449190\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.10\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Major upgrade to improve reliability for passengers under way on Thameslink route through central London - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Work has begun to upgrade a signalling system as part of major measures to improve reliability on one of the busiest parts of the rail network used by Thameslink, which this week transferred to public ownership. As part of Network Rail\u2019s ongoing investment to improve journeys and provide a dependable service for millions of customers across the UK, engineers are [\u2026]\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=449190\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-06-08T08:55:00+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-06-08T08:55:00+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Major upgrade to improve reliability for passengers under way on Thameslink route through central London - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Work has begun to upgrade a signalling system as part of major measures to improve reliability on one of the busiest parts of the rail network used by Thameslink, which this week transferred to public ownership. As part of Network Rail\u2019s ongoing investment to improve journeys and provide a dependable service for millions of customers across the UK, engineers are [\u2026]\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=449190#blogposting\",\"name\":\"Major upgrade to improve reliability for passengers under way on Thameslink route through central London - VibeWire Magazine\",\"headline\":\"Major upgrade to improve reliability for passengers under way on Thameslink route through central London\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/cdn.railuk.co\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/05134137\\\/Blackfriars-station-2_cropped-1-485x360.jpg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=449190\\\/#articleImage\"},\"datePublished\":\"2026-06-08T18:55:00+10:00\",\"dateModified\":\"2026-06-08T18:55:00+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=449190#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=449190#webpage\"},\"articleSection\":\"General Interest, Industry News, Infrastructure, Rail News, Rail Projects, UK\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=449190#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=449190#listItem\",\"name\":\"Major upgrade to improve reliability for passengers under way on Thameslink route through central London\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=449190#listItem\",\"position\":3,\"name\":\"Major upgrade to improve reliability for passengers under way on Thameslink route through central London\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=449190\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=449190\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=449190#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=449190#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=449190\",\"name\":\"Major upgrade to improve reliability for passengers under way on Thameslink route through central London - VibeWire Magazine\",\"description\":\"Work has begun to upgrade a signalling system as part of major measures to improve reliability on one of the busiest parts of the rail network used by Thameslink, which this week transferred to public ownership. As part of Network Rail\\u2019s ongoing investment to improve journeys and provide a dependable service for millions of customers across the UK, engineers are [\\u2026]\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=449190#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"datePublished\":\"2026-06-08T18:55:00+10:00\",\"dateModified\":\"2026-06-08T18:55:00+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Major upgrade to improve reliability for passengers under way on Thameslink route through central London - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Major upgrade to improve reliability for passengers under way on Thameslink route through central London - VibeWire Magazine","description":"Work has begun to upgrade a signalling system as part of major measures to improve reliability on one of the busiest parts of the rail network used by Thameslink, which this week transferred to public ownership. As part of Network Rail\u2019s ongoing investment to improve journeys and provide a dependable service for millions of customers across the UK, engineers are [\u2026]","canonical_url":"https:\/\/www.vibewire.com.au\/?p=449190","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=449190#blogposting","name":"Major upgrade to improve reliability for passengers under way on Thameslink route through central London - VibeWire Magazine","headline":"Major upgrade to improve reliability for passengers under way on Thameslink route through central London","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/06\/05134137\/Blackfriars-station-2_cropped-1-485x360.jpg","@id":"https:\/\/www.vibewire.com.au\/?p=449190\/#articleImage"},"datePublished":"2026-06-08T18:55:00+10:00","dateModified":"2026-06-08T18:55:00+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=449190#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=449190#webpage"},"articleSection":"General Interest, Industry News, Infrastructure, Rail News, Rail Projects, UK"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=449190#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=449190#listItem","name":"Major upgrade to improve reliability for passengers under way on Thameslink route through central London"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=449190#listItem","position":3,"name":"Major upgrade to improve reliability for passengers under way on Thameslink route through central London","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=449190\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=449190\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=449190#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=449190#webpage","url":"https:\/\/www.vibewire.com.au\/?p=449190","name":"Major upgrade to improve reliability for passengers under way on Thameslink route through central London - VibeWire Magazine","description":"Work has begun to upgrade a signalling system as part of major measures to improve reliability on one of the busiest parts of the rail network used by Thameslink, which this week transferred to public ownership. As part of Network Rail\u2019s ongoing investment to improve journeys and provide a dependable service for millions of customers across the UK, engineers are [\u2026]","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=449190#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"datePublished":"2026-06-08T18:55:00+10:00","dateModified":"2026-06-08T18:55:00+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Major upgrade to improve reliability for passengers under way on Thameslink route through central London - VibeWire Magazine","og:description":"Work has begun to upgrade a signalling system as part of major measures to improve reliability on one of the busiest parts of the rail network used by Thameslink, which this week transferred to public ownership. As part of Network Rail\u2019s ongoing investment to improve journeys and provide a dependable service for millions of customers across the UK, engineers are [\u2026]","og:url":"https:\/\/www.vibewire.com.au\/?p=449190","article:published_time":"2026-06-08T08:55:00+00:00","article:modified_time":"2026-06-08T08:55:00+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Major upgrade to improve reliability for passengers under way on Thameslink route through central London - VibeWire Magazine","twitter:description":"Work has begun to upgrade a signalling system as part of major measures to improve reliability on one of the busiest parts of the rail network used by Thameslink, which this week transferred to public ownership. As part of Network Rail\u2019s ongoing investment to improve journeys and provide a dependable service for millions of customers across the UK, engineers are [\u2026]","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"449190","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-06-08 09:32:26","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2026-06-08 09:28:54","updated":"2026-06-08 09:32:26"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tMajor upgrade to improve reliability for passengers under way on Thameslink route through central London\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"Major upgrade to improve reliability for passengers under way on Thameslink route through central London","link":"https:\/\/www.vibewire.com.au\/?p=449190"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/449190","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=449190"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/449190\/revisions"}],"predecessor-version":[{"id":449197,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/449190\/revisions\/449197"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=449190"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=449190"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=449190"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}