{"id":446442,"date":"2026-06-05T20:33:00","date_gmt":"2026-06-05T10:33:00","guid":{"rendered":"https:\/\/railuk.com\/?p=194264"},"modified":"2026-06-05T20:33:00","modified_gmt":"2026-06-05T10:33:00","slug":"first-of-ten-new-elizabeth-line-trains-enters-the-test-track-in-derby-as-railway-reaches-850m-journeys","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=446442","title":{"rendered":"First of ten new Elizabeth line trains enters the test track in Derby as railway reaches 850m journeys"},"content":{"rendered":"<p><a href=\"https:\/\/railuk.com\/rolling-stock\/first-of-ten-new-elizabeth-line-trains-enters-the-test-track-in-derby-as-railway-reaches-850m-journeys\/\" title=\"First of ten new Elizabeth line trains enters the test track in Derby as railway reaches 850m journeys\" rel=\"nofollow\"><img loading=\"lazy\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/06\/05111246\/Alstom-Image-Elizabeth-Line-train-testing-at-Derby-Litchurch-Lane-Works-1-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\" style=\"display: block; margin-bottom: 5px; clear:both;max-width: 100%;\" link_thumbnail=\"1\" decoding=\"async\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/06\/05111246\/Alstom-Image-Elizabeth-Line-train-testing-at-Derby-Litchurch-Lane-Works-1-485x360.jpg 485w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/06\/05111246\/Alstom-Image-Elizabeth-Line-train-testing-at-Derby-Litchurch-Lane-Works-1-80x60.jpg 80w\" sizes=\"auto, (max-width: 485px) 100vw, 485px\" \/><\/a><\/p>\n<p class=\"wp-block-paragraph\">The first of ten new Elizabeth line trains being built in Derby has left Alstom\u2019s production line and is undergoing final checks on the test track on site. It will soon undergo a period of trials on train lines near London and on the Elizabeth line itself before being put into passenger service&nbsp;later this year.&nbsp;<\/p>\n<p class=\"wp-block-paragraph\">This milestone comes as the Elizabeth line&nbsp;celebrates&nbsp;its four-year anniversary.&nbsp;It has become the UK\u2019s single busiest railway service, with more than 850 million passenger journeys made since it opened in May 2022. When all the new trains are complete, the total Elizabeth line fleet will be almost&nbsp;ten&nbsp;miles long, with a total capacity of around 120,000 people:&nbsp;more&nbsp;capacity&nbsp;than&nbsp;London\u2019s Wembley stadium.&nbsp;&nbsp;&nbsp;<\/p>\n<p class=\"wp-block-paragraph\">The ten new Aventra Class 345 trains are being delivered with Government funding to help meet growing demand on the line, increasing capacity and serving HS2\u2019s new Old Oak Common station in the future.&nbsp;&nbsp;<\/p>\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/cdn.prgloo.com\/media\/ecede8cb2ee84c19a60e1b65b7e2441e?width=580&amp;height=580\" alt=\"Alstom Image - Elizabeth Line train on the production line at Derby Litchurch Lane Works 1\"\/><\/figure>\n<p class=\"wp-block-paragraph\">The trains are being built by Alstom at its historic&nbsp;Litchurch&nbsp;Lane factory in Derby, a city that has been at the heart of Britain\u2019s railway heritage since 1839. Derby&nbsp;Litchurch&nbsp;Lane Works opened in 1876 and is now the UK\u2019s only remaining facility capable of designing, engineering,&nbsp;manufacturing&nbsp;and testing trains from scratch. This work in Derby&nbsp;demonstrates&nbsp;how investment in London\u2019s transport infrastructure delivers benefits far beyond the capital, with Alstom\u2019s supply chain supporting almost 40 companies&nbsp;totalling more than 1,000 employees.&nbsp;&nbsp;<\/p>\n<p class=\"wp-block-paragraph\">Each&nbsp;nine-carriage Elizabeth line train leaving Alstom\u2019s 150-year-old factory&nbsp;contains&nbsp;five miles of welding, 50 miles of cabling, and more than 47,700 screws and 31,700 bolts.&nbsp;The new trains&nbsp;will be manufactured,&nbsp;tested&nbsp;and introduced into service over this year and next.&nbsp;<\/p>\n<p class=\"wp-block-paragraph\">New data from&nbsp;Excel&nbsp;London shows how the Elizabeth line is driving demand across London\u2019s economy, particularly in business tourism. Almost half&nbsp;(49 per cent)&nbsp;of visitors now travel via nearby Custom House station&nbsp;\u2013&nbsp;taking advantage of fast, direct links to Heathrow and across the capital. Since&nbsp;the line opened, visitor numbers have increased by&nbsp;nearly&nbsp;20&nbsp;per cent,&nbsp;with people staying longer to network and meet. These new statistics underline the growing popularity of the Elizabeth line, and the importance of introducing new trains to&nbsp;help meet&nbsp;growing demand.&nbsp;<\/p>\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/cdn.prgloo.com\/media\/acb7d2c4e0694f17a699bff2b8207700?width=580&amp;height=580\" alt=\"Alstom Image - Elizabeth Line train on the production line at Derby Litchurch Lane Works-2\"\/><\/figure>\n<p class=\"wp-block-paragraph\"><strong>Trish Ashton, Director of Ra<\/strong><strong>il&nbsp;at<\/strong><strong>TfL, said:<\/strong>&nbsp;\u201cMore than 850 million customer journeys have now been made on the Elizabeth line, and&nbsp;it\u2019s&nbsp;fantastic to see the first of the ten new trains leaving the factory. This is an important milestone in our journey towards increasing capacity on the line, meeting the growing demand for increased connectivity that we deliver for hundreds of thousands of customers every day.\u201d&nbsp;<\/p>\n<p class=\"wp-block-paragraph\"><strong>Seb Dance, Deputy Mayor of London for Transport, said:&nbsp;<\/strong>\u201cThe Elizabeth line is a perfect example of how quality transport infrastructure can unlock opportunities for the people and places it connects, with this vital work in Derby showing how investing in the capital doesn&#8217;t just benefit Londoners but drives wider economic growth across the country.&nbsp;<\/p>\n<p class=\"wp-block-paragraph\">\u201cAs these fantastic new trains leave the factory to help meet growing demand on the line, the Mayor and I are excited to continue working hand in hand with TfL and the Government to unleash the full potential of our transport network, as we continue building a more prosperous London for everyone.\u201d&nbsp;<\/p>\n<p class=\"wp-block-paragraph\"><strong>Andy Butters, Managing Director of Derby&nbsp;Litchurch&nbsp;Lane Works, said:<\/strong>&nbsp;\u201cSeeing the first of our new Elizabeth line Aventra trains roll off the production line in Derby is a proud moment for everyone at&nbsp;Litchurch&nbsp;Lane. This milestone reflects the skill,&nbsp;dedication&nbsp;and&nbsp;craftsmanship&nbsp;of our teams, who are proudly building&nbsp;additional&nbsp;trains for one of the UK\u2019s most successful railway services.&nbsp;<\/p>\n<p class=\"wp-block-paragraph\">\u201cThese new trains will help meet growing demand on the Elizabeth line while supporting highly skilled jobs in Derby and our nationwide supply chain.&nbsp;It\u2019s&nbsp;a powerful example of how investment in London\u2019s transport network delivers real economic benefits across the UK, with Derby continuing to play&nbsp;a central role&nbsp;in Britain\u2019s rail industry \u2013 as it has done since 1839.\u201d&nbsp;<\/p>\n<p class=\"wp-block-paragraph\"><strong>Jeremy Rees, CEO of Excel London, said:&nbsp;<\/strong>\u201cWithout doubt, the Elizabeth line has been transformational for the events industry, removing the friction of travel across the city and reviving London\u2019s business tourism economy. From our own independent research, we have seen a 20 per cent increase in visitor numbers to&nbsp;Excel&nbsp;London as a direct result of the Elizabeth line and leading to record-breaking attendances for many of our flagship trade shows.&nbsp;&nbsp;&nbsp;<br \/>&nbsp;<br \/>\u201cThe most significant change though has been the increase in visitor durations &#8211; now an average of 7.5 hours \u2013 driven by faster journey times encouraging guests to stay longer, network more extensively, and conduct additional business.\u201d&nbsp;<\/p>\n<p class=\"wp-block-paragraph\">Image credit: TfL<\/p>\n","protected":false},"excerpt":{"rendered":"<p><a href=\"https:\/\/railuk.com\/rolling-stock\/first-of-ten-new-elizabeth-line-trains-enters-the-test-track-in-derby-as-railway-reaches-850m-journeys\/\" title=\"First of ten new Elizabeth line trains enters the test track in Derby as railway reaches 850m journeys\" rel=\"nofollow\"><img loading=\"lazy\" decoding=\"async\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/06\/05111246\/Alstom-Image-Elizabeth-Line-train-testing-at-Derby-Litchurch-Lane-Works-1-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\"><\/a>The first of ten new Elizabeth line trains being built in Derby has left Alstom\u2019s production line and is undergoing final checks on the test track on site. It will soon undergo a period of trials on train lines near London and on the Elizabeth line itself before being put into passenger service\u00a0later this year.\u00a0 [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[16017,47,180,913,85],"tags":[],"class_list":["post-446442","post","type-post","status-publish","format-standard","hentry","category-industry-news","category-rail-news","category-rolling-stock","category-travel","category-uk"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/446442","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=446442"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/446442\/revisions"}],"predecessor-version":[{"id":446443,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/446442\/revisions\/446443"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=446442"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=446442"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=446442"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}