{"id":44245,"date":"2024-05-15T09:20:19","date_gmt":"2024-05-14T23:20:19","guid":{"rendered":"https:\/\/www.railexpress.com.au\/?p=116236"},"modified":"2024-05-15T10:38:05","modified_gmt":"2024-05-15T00:38:05","slug":"parramatta-light-rail-begins-daytime-testing","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=44245","title":{"rendered":"Parramatta Light Rail begins daytime testing"},"content":{"rendered":"<figure><img decoding=\"async\" style=\"float: right; margin: 0 0 10px 10px;\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/04\/IMG_0616-scaled.jpg\" alt=\"\" \/><figcaption>Image\/Mark Sotheran<\/figcaption><\/figure>\n<div class=\"node-section-pre-content\">\n<div class=\"node-content__element node-content__element--summary nsw-intro\">\n<div class=\"nsw-wysiwyg-content\">\n<p><strong>Daytime testing for <a href=\"https:\/\/www.railexpress.com.au\/parramatta-light-rail-testing-ramps-up\/\">Parramatta Light Rail<\/a> is kicking off, marking another milestone as the system gears up for passenger services later this year.<\/strong><\/p>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"node-section-content\">\n<div class=\"node-content__element\">\n<div class=\"nsw-wysiwyg-content\">\n<p>For the first time, <a href=\"https:\/\/www.nsw.gov.au\/driving-boating-and-transport\/projects\/parramatta-light-rail\">Parramatta<\/a> workers and residents will begin to see the 45-metre trams travelling in the heart of Parramatta during off-peak times between 10am and 3pm.<\/p>\n<p>The first daytime test run will see the tram journey from the stabling facility in Camellia, complete a run up to Carlingford and back, before rolling into the Parramatta CBD.<\/p>\n<p>Transport Minister Jo Haylen celebrated another momentous moment in the project.<\/p>\n<p>\u201cLight rail is seeing the light of day in Western Sydney, meaning people can expect more trams to be travelling around as this next phase of testing gathers pace,\u201d she said.<\/p>\n<p>\u201cWhile we know how excited the community is to start using the light rail, we need to get this right. Passengers cannot get on board until thorough testing is complete.<\/p>\n<p>\u201cThis will be a major change for our west that will take some time for people to get used to. We\u2019re going from no trams in Parramatta for 80 years, to one running every 7 minutes in the peak.\u201d<\/p>\n<p>With an experienced driver at the controls, the tram will cross a number of key traffic intersections and pass local schools on Macquarie Street, giving locals an exciting glimpse of their future public transport network.<\/p>\n<p>Parramatta Light Rail Stage 1 testing continues to gather pace, with more daytime testing ahead across the entire alignment to ensure the safety and reliability of the system before passenger services can commence.<\/p>\n<p>Current activities include testing the full load capacities of vehicles and infrastructure, as well as testing network communications and vehicle operations.<\/p>\n<p>Transport Coordinator General Howard Collins is encouraging people to come down and see the testing themselves.<\/p>\n<p>\u201cIf you\u2019re driving in and around Parramatta for the first time in a while, be aware conditions have changed \u2013 this includes the new white \u2018T\u2019 illuminated on intersection traffic light signals for light rail,\u201d he said.<\/p>\n<p>\u201cWatch out for trams moving about in the area, be sure to stop, listen and look around before crossing the light rail tracks, and always cross at a pedestrian crossing.\u201d<\/p>\n<p>Safety is paramount and the NSW Government continues to engage closely with schools, businesses, stakeholders and the wider community to support safe behaviours around the light rail.<\/p>\n<p>Project information and engagement sessions are also being held at various Western Sydney locations, providing an opportunity to share safety information and updates about the project.<\/p>\n<p>Find out more about the project and its upcoming community engagement sessions at the\u00a0<a title=\"www.nsw.gov.au\/parramatta-light-rail (base:parramatta-light-rail)\" href=\"https:\/\/www.nsw.gov.au\/parramatta-light-rail\" data-entity-type=\"linky\" data-entity-uuid=\"783e35d6-d524-43c0-9fc3-5271085c1d10\" data-entity-substitution=\"canonical\">Parramatta Light Rail website<\/a><\/p>\n<p>Find out more about\u00a0<a href=\"https:\/\/www.nsw.gov.au\/driving-boating-and-transport\/projects\/parramatta-light-rail\/news\/www.nsw.gov.au\/parramatta-light-rail\/safety\">Parramatta Light Rail safety<\/a><\/p>\n<\/div>\n<\/div>\n<\/div>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/parramatta-light-rail-begins-daytime-testing-in-parramatta\/\">Parramatta Light Rail begins daytime testing<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/04\/IMG_0616-scaled.jpg\" alt=\"\"><figcaption>Image\/Mark Sotheran<\/figcaption><\/figure>\n<p>Daytime testing for Parramatta Light Rail is kicking off, marking another milestone as the system gears up for passenger services \u2026 <\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/parramatta-light-rail-begins-daytime-testing-in-parramatta\/\">Parramatta Light Rail begins daytime testing<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"author":20,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[190,2251,163,58],"tags":[],"class_list":["post-44245","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-light-rail","category-nsw","category-rail-industry-news-australia-new-zealand","category-track-construction"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/44245","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=44245"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/44245\/revisions"}],"predecessor-version":[{"id":44249,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/44245\/revisions\/44249"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=44245"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=44245"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=44245"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}