{"id":43957,"date":"2024-05-15T00:30:04","date_gmt":"2024-05-14T14:30:04","guid":{"rendered":"https:\/\/www.rtands.com\/?p=54830"},"modified":"2024-05-15T00:30:04","modified_gmt":"2024-05-14T14:30:04","slug":"the-portal-north-bridge-project-marks-halfway-point","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=43957","title":{"rendered":"The Portal North Bridge Project Marks Halfway Point"},"content":{"rendered":"<p>KEARNY, N.J. \u2013 The Portal North Bridge is now 50% complete, according to NJ TRANSIT and Amtrak. Both NJ TRANSIT and Amtrak have marked the halfway point at a ceremony at the construction site.<\/p>\n<p>The post <a rel=\"nofollow\" href=\"https:\/\/www.rtands.com\/track-construction\/track-structure\/bridges-tunnels\/the-portal-north-bridge-project-marks-halfway-point\/\">The Portal North Bridge Project Marks Halfway Point<\/a> appeared first on <a rel=\"nofollow\" href=\"https:\/\/www.rtands.com\/\">Railway Track and Structures<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>KEARNY, N.J. \u2013 The Portal North Bridge is now 50% complete, according to NJ TRANSIT and Amtrak. Both NJ TRANSIT and Amtrak have marked the halfway point at a ceremony at the construction site.<br \/>\nThe post The Portal North Bridge Project Marks Halfway Poin&#8230;<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[1304,35,30,57,3700,49,9202,58,33],"tags":[],"class_list":["post-43957","post","type-post","status-publish","format-standard","hentry","category-amtrak","category-breaking-news","category-bridges-tunnels","category-commuter-regional","category-nj-transit","category-passenger","category-portal-north-bridge","category-track-construction","category-track-structure"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/43957","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=43957"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/43957\/revisions"}],"predecessor-version":[{"id":43958,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/43957\/revisions\/43958"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=43957"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=43957"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=43957"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}