{"id":43895,"date":"2024-05-14T14:38:25","date_gmt":"2024-05-14T04:38:25","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=43895"},"modified":"2024-05-14T14:38:25","modified_gmt":"2024-05-14T04:38:25","slug":"bristol-temple-meads-stations-23m-eastern-entrance-reaches-construction-milestone-2","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=43895","title":{"rendered":"Bristol Temple Meads station\u2019s \u00a323m Eastern Entrance reaches construction milestone"},"content":{"rendered":"<p>Building of a new \u00a323 million Eastern Entrance at Bristol Temple Meads station is moving forward at pace, with the structure\u2019s frame now complete.<\/p>\n<p>The main structural steel frame of the building has been fully installed, standing six metres high and 20 metres wide in the Cattle Market Road compound, with the top visible from platform 15.<\/p>\n<p>It was delivered at the end of March and was fitted together on site, with contractor BAM Nuttall working around Storm Kathleen to get the steelwork in place.<\/p>\n<p>The first stage of fitting out has now begun, with the glazing and cladding to follow over the coming months. The building will be opened alongside the new University of Bristol Enterprise Campus in 2026.<\/p>\n<p>Starting on site at the end of 2023, the entrance construction has included extending the subway by excavating through the retaining wall and underneath platforms 13 and 15, followed by drainage and foundations work.<\/p>\n<p>The construction of the new entrance is part of the Bristol Temple Quarter programme, one of the largest and most ambitious regeneration programmes in Europe, which aims to deliver thousands of new homes, jobs and opportunities for Bristol and the West of England.<\/p>\n<p>The Eastern Entrance is one of three new entrances to the station funded by \u00a394.7m of Government funding secured by the Temple Quarter partners in 2022. It will connect Bristol Temple Meads to the new University of Bristol Enterprise Campus.<\/p>\n<p>Network Rail\u2019s industry programme director Daniel Round said: \u201cOur forecasts show that by 2030 \u2013 only four years after opening \u2013 2.5 million people a year will be using this new entrance in and out of the station. That will make a real difference and really open up this part of the city to new rail passengers, as well as to our existing customers.\u201d<\/p>\n<p>Dan Norris, West of England Metro Mayor, said: \u201cI\u2019m thrilled to see this brand-new entrance for Brunel\u2019s iconic station taking shape.<\/p>\n<p>\u201cIt\u2019s all part of one of most exciting regeneration projects in Europe, which I\u2019m proud is being administered by the West of England Mayoral Combined Authority and will create a real gateway to the region.\u201d<\/p>\n<p>Barra Mac Ruar\u00ed, chief property officer at the University of Bristol said: \u201cThe progress on the new Eastern Entrance at Bristol Temple Meads is great to see. Opening directly onto University Square, it will integrate the new campus into its surroundings, and enhance connectivity and accessibility in the area. The station improvements will encourage our students, staff, partners, and the community to use sustainable travel options.\u201d<\/p>\n<p>Stephen Peacock, CEO, Bristol City Council said: \u201cStructural completion of the Eastern Entrance is another sign of the momentum behind the Bristol Temple Quarter programme. Alongside the recent creation of the BTQLLP and the fantastic progress on the university\u2019s campus, this is a fantastic point to reflect on how far we\u2019ve come as we look forward to the delivery of new homes, jobs and opportunities for the city-region.\u201d<\/p>","protected":false},"excerpt":{"rendered":"<p>Building of a new \u00a323 million Eastern Entrance at Bristol Temple Meads station is moving forward at pace, with the structure\u2019s frame now complete. The [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":43896,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[47],"tags":[7,11],"class_list":["post-43895","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-rail-news","tag-transport","tag-usa"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Building of a new \u00a323 million Eastern Entrance at Bristol Temple Meads station is moving forward at pace, with the structure\u2019s frame now complete. The main structural steel frame of the building has been fully installed, standing six metres high and 20 metres wide in the Cattle Market Road compound, with the top visible from\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=43895\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Bristol Temple Meads station\u2019s \u00a323m Eastern Entrance reaches construction milestone - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Building of a new \u00a323 million Eastern Entrance at Bristol Temple Meads station is moving forward at pace, with the structure\u2019s frame now complete. The main structural steel frame of the building has been fully installed, standing six metres high and 20 metres wide in the Cattle Market Road compound, with the top visible from\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=43895\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-05-14T04:38:25+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-05-14T04:38:25+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Bristol Temple Meads station\u2019s \u00a323m Eastern Entrance reaches construction milestone - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Building of a new \u00a323 million Eastern Entrance at Bristol Temple Meads station is moving forward at pace, with the structure\u2019s frame now complete. The main structural steel frame of the building has been fully installed, standing six metres high and 20 metres wide in the Cattle Market Road compound, with the top visible from\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=43895#blogposting\",\"name\":\"Bristol Temple Meads station\\u2019s \\u00a323m Eastern Entrance reaches construction milestone - VibeWire Magazine\",\"headline\":\"Bristol Temple Meads station\\u2019s \\u00a323m Eastern Entrance reaches construction milestone\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/Bristol-Temple-Meads-GeTJuy.jpeg\",\"width\":1630,\"height\":1040},\"datePublished\":\"2024-05-14T14:38:25+10:00\",\"dateModified\":\"2024-05-14T14:38:25+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=43895#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=43895#webpage\"},\"articleSection\":\"Rail News, transport, USA\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=43895#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=43895#listItem\",\"name\":\"Bristol Temple Meads station\\u2019s \\u00a323m Eastern Entrance reaches construction milestone\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=43895#listItem\",\"position\":3,\"name\":\"Bristol Temple Meads station\\u2019s \\u00a323m Eastern Entrance reaches construction milestone\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=43895\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=43895\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=43895#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=43895\",\"name\":\"Bristol Temple Meads station\\u2019s \\u00a323m Eastern Entrance reaches construction milestone - VibeWire Magazine\",\"description\":\"Building of a new \\u00a323 million Eastern Entrance at Bristol Temple Meads station is moving forward at pace, with the structure\\u2019s frame now complete. The main structural steel frame of the building has been fully installed, standing six metres high and 20 metres wide in the Cattle Market Road compound, with the top visible from\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=43895#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/Bristol-Temple-Meads-GeTJuy.jpeg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=43895\\\/#mainImage\",\"width\":1630,\"height\":1040},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=43895#mainImage\"},\"datePublished\":\"2024-05-14T14:38:25+10:00\",\"dateModified\":\"2024-05-14T14:38:25+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Bristol Temple Meads station\u2019s \u00a323m Eastern Entrance reaches construction milestone - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Bristol Temple Meads station\u2019s \u00a323m Eastern Entrance reaches construction milestone - VibeWire Magazine","description":"Building of a new \u00a323 million Eastern Entrance at Bristol Temple Meads station is moving forward at pace, with the structure\u2019s frame now complete. The main structural steel frame of the building has been fully installed, standing six metres high and 20 metres wide in the Cattle Market Road compound, with the top visible from","canonical_url":"https:\/\/www.vibewire.com.au\/?p=43895","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=43895#blogposting","name":"Bristol Temple Meads station\u2019s \u00a323m Eastern Entrance reaches construction milestone - VibeWire Magazine","headline":"Bristol Temple Meads station\u2019s \u00a323m Eastern Entrance reaches construction milestone","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Bristol-Temple-Meads-GeTJuy.jpeg","width":1630,"height":1040},"datePublished":"2024-05-14T14:38:25+10:00","dateModified":"2024-05-14T14:38:25+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=43895#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=43895#webpage"},"articleSection":"Rail News, transport, USA"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=43895#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=43895#listItem","name":"Bristol Temple Meads station\u2019s \u00a323m Eastern Entrance reaches construction milestone"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=43895#listItem","position":3,"name":"Bristol Temple Meads station\u2019s \u00a323m Eastern Entrance reaches construction milestone","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=43895\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=43895\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=43895#webpage","url":"https:\/\/www.vibewire.com.au\/?p=43895","name":"Bristol Temple Meads station\u2019s \u00a323m Eastern Entrance reaches construction milestone - VibeWire Magazine","description":"Building of a new \u00a323 million Eastern Entrance at Bristol Temple Meads station is moving forward at pace, with the structure\u2019s frame now complete. The main structural steel frame of the building has been fully installed, standing six metres high and 20 metres wide in the Cattle Market Road compound, with the top visible from","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=43895#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Bristol-Temple-Meads-GeTJuy.jpeg","@id":"https:\/\/www.vibewire.com.au\/?p=43895\/#mainImage","width":1630,"height":1040},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=43895#mainImage"},"datePublished":"2024-05-14T14:38:25+10:00","dateModified":"2024-05-14T14:38:25+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Bristol Temple Meads station\u2019s \u00a323m Eastern Entrance reaches construction milestone - VibeWire Magazine","og:description":"Building of a new \u00a323 million Eastern Entrance at Bristol Temple Meads station is moving forward at pace, with the structure\u2019s frame now complete. The main structural steel frame of the building has been fully installed, standing six metres high and 20 metres wide in the Cattle Market Road compound, with the top visible from","og:url":"https:\/\/www.vibewire.com.au\/?p=43895","article:published_time":"2024-05-14T04:38:25+00:00","article:modified_time":"2024-05-14T04:38:25+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Bristol Temple Meads station\u2019s \u00a323m Eastern Entrance reaches construction milestone - VibeWire Magazine","twitter:description":"Building of a new \u00a323 million Eastern Entrance at Bristol Temple Meads station is moving forward at pace, with the structure\u2019s frame now complete. The main structural steel frame of the building has been fully installed, standing six metres high and 20 metres wide in the Cattle Market Road compound, with the top visible from","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"43895","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-06-19 22:56:14","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-05-14 14:40:42","updated":"2026-06-19 22:56:14"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tBristol Temple Meads station\u2019s \u00a323m Eastern Entrance reaches construction milestone\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"Bristol Temple Meads station\u2019s \u00a323m Eastern Entrance reaches construction milestone","link":"https:\/\/www.vibewire.com.au\/?p=43895"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/43895","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=43895"}],"version-history":[{"count":0,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/43895\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/media\/43896"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=43895"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=43895"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=43895"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}