{"id":4305,"date":"2024-01-22T19:58:36","date_gmt":"2024-01-22T09:58:36","guid":{"rendered":"https:\/\/www.railfreight.com\/?p=49478"},"modified":"2024-01-22T19:58:36","modified_gmt":"2024-01-22T09:58:36","slug":"tender-for-integrating-standard-gauge-at-port-of-valencia-is-out","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=4305","title":{"rendered":"Tender for integrating standard gauge at port of Valencia is out"},"content":{"rendered":"<p><strong>The Valencia Port Authority has put out a tender for the expansion of the port\u2019s rail infrastructure. The project entails the replacement of the current single-track connecting the Poniente and Levante docks with a three-track mixed-gauge railway.<\/strong><br \/>\n<span id=\"more-49478\"><\/span>Once the project is completed the Levante Railway Terminal will be able to handle 750-metre freight trains on both the Iberian and standard gauges. Other than laying the new railway, the company that will win the tender will have to electrify it and make it ready to receive the expected increased volumes.<\/p>\n<p>The contract is valued at a little over 12 million euros, and the construction needs to be carried out within 18 months from the start of the works. The <a href=\"https:\/\/www.railfreight.com\/intermodal\/2020\/09\/04\/valencia-port-to-have-double-railway-tracks-to-deal-with-traffic-increase\/\"  rel=\"noopener\">design of the project<\/a> was made between 2020 and 2021 by Ardanuy Ingenier\u00eda. The new line will also grant access to the <a href=\"https:\/\/www.railfreight.com\/intermodal\/2023\/12\/20\/construction-of-spains-largest-port-rail-terminal-gets-green-lights\/\"  rel=\"noopener\">North Terminal<\/a>, a massive container-handling facility for which the Spanish government recently granted approval.<\/p>\n<p><strong>Also read:<\/strong><\/p>\n<ul>\n<li><a href=\"https:\/\/www.railfreight.com\/business\/2024\/01\/18\/spanish-government-greenlights-establishment-of-train-port-barcelona\/\">Spanish government greenlights establishment of Train Port Barcelona<\/a><\/li>\n<li><a href=\"https:\/\/www.railfreight.com\/intermodal\/2024\/01\/16\/msc-to-build-another-rail-terminal-at-zaragoza-plaza-logistics-centre\/\">MSC to build another rail terminal at Zaragoza PLAZA Logistics Centre<\/a><\/li>\n<li><a href=\"https:\/\/www.railfreight.com\/policy\/2023\/12\/12\/spain-unlocks-26-million-euros-in-rail-freight-eco-incentives\/\">Spain unlocks 26 million euros in rail freight eco-incentives<\/a><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The Valencia Port Authority has put out a tender for the expansion of the port\u2019s rail infrastructure. The project entails the replacement of the current single-track connecting the Poniente and Levante docks with a three-track mixed-gauge railway. Once the project is completed the Levante Railway Terminal will be able to handle 750-metre freight trains on [\u2026]<\/p>\n","protected":false},"author":9,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[343,1670,1671,1672,1673],"tags":[],"class_list":["post-4305","post","type-post","status-publish","format-standard","hentry","category-infrastructure","category-levante-deck","category-poniente-deck","category-port-of-valencia","category-valenciaport"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.9 - aioseo.com -->\n\t<meta name=\"description\" content=\"The Valencia Port Authority has put out a tender for the expansion of the port\u2019s rail infrastructure. The project entails the replacement of the current single-track connecting the Poniente and Levante docks with a three-track mixed-gauge railway. Once the project is completed the Levante Railway Terminal will be able to handle 750-metre freight trains on [\u2026]\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Marco Raimondi\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=4305\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.9\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Tender for integrating standard gauge at port of Valencia is out - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"The Valencia Port Authority has put out a tender for the expansion of the port\u2019s rail infrastructure. The project entails the replacement of the current single-track connecting the Poniente and Levante docks with a three-track mixed-gauge railway. Once the project is completed the Levante Railway Terminal will be able to handle 750-metre freight trains on [\u2026]\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=4305\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-01-22T09:58:36+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-01-22T09:58:36+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Tender for integrating standard gauge at port of Valencia is out - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The Valencia Port Authority has put out a tender for the expansion of the port\u2019s rail infrastructure. The project entails the replacement of the current single-track connecting the Poniente and Levante docks with a three-track mixed-gauge railway. Once the project is completed the Levante Railway Terminal will be able to handle 750-metre freight trains on [\u2026]\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=4305#blogposting\",\"name\":\"Tender for integrating standard gauge at port of Valencia is out - VibeWire Magazine\",\"headline\":\"Tender for integrating standard gauge at port of Valencia is out\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#articleImage\",\"width\":1028,\"height\":930},\"datePublished\":\"2024-01-22T19:58:36+10:00\",\"dateModified\":\"2024-01-22T19:58:36+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=4305#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=4305#webpage\"},\"articleSection\":\"Infrastructure, Levante deck, Poniente deck, Port of Valencia, Valenciaport\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=4305#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=343#listItem\",\"name\":\"Infrastructure\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=343#listItem\",\"position\":2,\"name\":\"Infrastructure\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=343\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=4305#listItem\",\"name\":\"Tender for integrating standard gauge at port of Valencia is out\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=4305#listItem\",\"position\":3,\"name\":\"Tender for integrating standard gauge at port of Valencia is out\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=343#listItem\",\"name\":\"Infrastructure\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=4305\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=4305\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9\",\"name\":\"Marco Raimondi\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=4305#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fc241b4d8352e3e7ca08ec32c4ebd712ae862e0499265d83515e97acb5510625?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Marco Raimondi\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=4305#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=4305\",\"name\":\"Tender for integrating standard gauge at port of Valencia is out - VibeWire Magazine\",\"description\":\"The Valencia Port Authority has put out a tender for the expansion of the port\\u2019s rail infrastructure. The project entails the replacement of the current single-track connecting the Poniente and Levante docks with a three-track mixed-gauge railway. Once the project is completed the Levante Railway Terminal will be able to handle 750-metre freight trains on [\\u2026]\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=4305#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9#author\"},\"datePublished\":\"2024-01-22T19:58:36+10:00\",\"dateModified\":\"2024-01-22T19:58:36+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Tender for integrating standard gauge at port of Valencia is out - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Tender for integrating standard gauge at port of Valencia is out - VibeWire Magazine","description":"The Valencia Port Authority has put out a tender for the expansion of the port\u2019s rail infrastructure. The project entails the replacement of the current single-track connecting the Poniente and Levante docks with a three-track mixed-gauge railway. Once the project is completed the Levante Railway Terminal will be able to handle 750-metre freight trains on [\u2026]","canonical_url":"https:\/\/www.vibewire.com.au\/?p=4305","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=4305#blogposting","name":"Tender for integrating standard gauge at port of Valencia is out - VibeWire Magazine","headline":"Tender for integrating standard gauge at port of Valencia is out","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=9#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/#articleImage","width":1028,"height":930},"datePublished":"2024-01-22T19:58:36+10:00","dateModified":"2024-01-22T19:58:36+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=4305#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=4305#webpage"},"articleSection":"Infrastructure, Levante deck, Poniente deck, Port of Valencia, Valenciaport"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=4305#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=343#listItem","name":"Infrastructure"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=343#listItem","position":2,"name":"Infrastructure","item":"https:\/\/www.vibewire.com.au\/?cat=343","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=4305#listItem","name":"Tender for integrating standard gauge at port of Valencia is out"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=4305#listItem","position":3,"name":"Tender for integrating standard gauge at port of Valencia is out","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=343#listItem","name":"Infrastructure"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=4305\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=4305\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=9#author","url":"https:\/\/www.vibewire.com.au\/?author=9","name":"Marco Raimondi","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=4305#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/fc241b4d8352e3e7ca08ec32c4ebd712ae862e0499265d83515e97acb5510625?s=96&d=mm&r=g","width":96,"height":96,"caption":"Marco Raimondi"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=4305#webpage","url":"https:\/\/www.vibewire.com.au\/?p=4305","name":"Tender for integrating standard gauge at port of Valencia is out - VibeWire Magazine","description":"The Valencia Port Authority has put out a tender for the expansion of the port\u2019s rail infrastructure. The project entails the replacement of the current single-track connecting the Poniente and Levante docks with a three-track mixed-gauge railway. Once the project is completed the Levante Railway Terminal will be able to handle 750-metre freight trains on [\u2026]","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=4305#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=9#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=9#author"},"datePublished":"2024-01-22T19:58:36+10:00","dateModified":"2024-01-22T19:58:36+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Tender for integrating standard gauge at port of Valencia is out - VibeWire Magazine","og:description":"The Valencia Port Authority has put out a tender for the expansion of the port\u2019s rail infrastructure. The project entails the replacement of the current single-track connecting the Poniente and Levante docks with a three-track mixed-gauge railway. Once the project is completed the Levante Railway Terminal will be able to handle 750-metre freight trains on [\u2026]","og:url":"https:\/\/www.vibewire.com.au\/?p=4305","article:published_time":"2024-01-22T09:58:36+00:00","article:modified_time":"2024-01-22T09:58:36+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Tender for integrating standard gauge at port of Valencia is out - VibeWire Magazine","twitter:description":"The Valencia Port Authority has put out a tender for the expansion of the port\u2019s rail infrastructure. The project entails the replacement of the current single-track connecting the Poniente and Levante docks with a three-track mixed-gauge railway. Once the project is completed the Levante Railway Terminal will be able to handle 750-metre freight trains on [\u2026]","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"4305","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-05-17 03:12:23","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-01-22 11:18:10","updated":"2026-05-17 03:12:23"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=343\" title=\"Infrastructure\">Infrastructure<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tTender for integrating standard gauge at port of Valencia is out\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Infrastructure","link":"https:\/\/www.vibewire.com.au\/?cat=343"},{"label":"Tender for integrating standard gauge at port of Valencia is out","link":"https:\/\/www.vibewire.com.au\/?p=4305"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/4305","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4305"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/4305\/revisions"}],"predecessor-version":[{"id":4306,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/4305\/revisions\/4306"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4305"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4305"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4305"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}