{"id":42664,"date":"2024-05-13T13:21:09","date_gmt":"2024-05-13T03:21:09","guid":{"rendered":"https:\/\/www.railexpress.com.au\/?p=116218"},"modified":"2024-05-13T13:21:09","modified_gmt":"2024-05-13T03:21:09","slug":"brightline-west-selects-siemens-to-manufacture-high-speed-rail-trainsets","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=42664","title":{"rendered":"Brightline West Selects Siemens to Manufacture High Speed Rail Trainsets"},"content":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/05\/Siemens-high-speed-train.jpg\" alt=\"\" style=\"float:right; margin:0 0 10px 10px;\"><figcaption>Image\/Siemens Mobility<\/figcaption><\/figure>\n<p><strong><a href=\"https:\/\/www.gobrightline.com\/\">Brightline<\/a> has announced that <a href=\"https:\/\/www.mobility.siemens.com\/au\/en.html\">Siemens Mobility<\/a> has been designated the preferred bidder to build train sets for the Brightline West <a href=\"https:\/\/www.railexpress.com.au\/rail-industry-news-australia-new-zealand\/fast-rail-rail-industry-news-australia-new-zealand\/\">high-speed<\/a> rail project that will connect Las Vegas and Southern California. <\/strong><span id=\"more-116218\"><\/span><\/p>\n<p>The contract will include a fleet of ten &#8216;American Pioneer 220&#8217; (AP 220) train sets to be manufactured, delivered to Nevada and tested to support Brightline West\u2019s timeline of initiating service in 2028.<\/p>\n<div class=\"Box box col-xs-12 col-sm-12 col-md-12 leftBox\" data-xml-id=\"idm93822503822632\" data-image=\"1\" data-child=\"3\" data-interaction=\"false\" data-pos=\"1\" data-maxlength=\"2\" data-mod=\"1\">\n<div class=\"row\">\n<div class=\"col-xs-12 col-sm-6 col-md-6 caption\">\n<div class=\"f-text\">The announcement came after a multi-year competitive procurement process conducted among multiple global competitors. The selection, which is subject to the conclusion of definitive agreements, is based on specific criteria that included price, manufacturing schedule, train performance (e.g. speed and travel time), ADA compliance, passenger amenities and total passenger capacity.<\/div>\n<div><\/div>\n<div class=\"f-text\">In addition, the criteria considered future interoperability with the California High-Speed Rail project. The trains will be built in accordance with all applicable &#8216;buy America&#8217; requirements.<\/div>\n<div><\/div>\n<div class=\"f-text\">This selection includes a 30-year rolling stock maintenance contract that will be performed at Brightline West\u2019s Vehicle Maintenance Facility in Sloan, NV.<\/div>\n<div><\/div>\n<div class=\"f-text\">At this site, crews will perform routine daily maintenance, as well as long-term overhauls and repairs. This will generate high-paying jobs performing train maintenance activities on a permanent basis.<\/div>\n<div><\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"Box box col-xs-12 col-sm-12 col-md-12 noPic\" data-xml-id=\"idm93822503336728\" data-image=\"0\" data-child=\"6\" data-interaction=\"false\" data-pos=\"2\" data-maxlength=\"2\" data-mod=\"0\">\n<div class=\"row\">\n<div class=\"col-xs-12 col-sm-8 col-md-8 caption\">\n<div class=\"f-text\">With the selection, Siemens will introduce the AP220 trainsets which represent a new generation of innovative high-speed technology, featuring the latest in passenger experience, cutting-edge digital technology, and a revolutionary propulsion system, built specifically for the U.S. market.<\/div>\n<div><\/div>\n<div class=\"f-text\">These trains are an evolution of the proven Velaro platform, currently operating in Europe. The AP220 will introduce state-of-the-art technology through an American supply chain spurring the United States to establish a new industry rivaling countries that have had high-speed rail for decades.<\/div>\n<div><\/div>\n<div class=\"f-text\">Siemens will establish a new facility to build the AP220 and will announce the location of America\u2019s first true high-speed rail production centre when the contract is finalised Brightline\u2019s CEO Michael Reininger explained.<\/div>\n<div><\/div>\n<div class=\"f-text\">\u201cJust as we redefined train travel with our trainsets for Brightline Florida, we are excited to pioneer this new frontier of manufacturing and development for Brightline West,\u201d Reininger said.<\/div>\n<div><\/div>\n<div class=\"f-text\">\u201cThe momentum we are building, will culminate in new jobs and a new supply chain that will establish the foundation for a high-speed rail industry from coast to coast.&#8221;<\/div>\n<div><\/div>\n<div>Siemens Mobility North America CEO Marc Buncher said he is excited to work with Brightline to transform rail in America.<\/div>\n<div><\/div>\n<div>&#8220;The high-speed chapter of America\u2019s rail story will build on Siemens\u2019 40 years of designing, building, testing, delivering and maintaining trains in the United States,\u201d Buncher said.<\/div>\n<div><\/div>\n<div>\u201cOn behalf of our 4,500 rail employees across the United States, we are excited to be selected to build and maintain America\u2019s first true high-speed trains, which will feature some of the world\u2019s most innovative high-speed rail technology.<\/div>\n<div><\/div>\n<div>&#8220;When they enter service, it will be one of the most pivotal moments in the history of American rail.\u201d<\/div>\n<div><\/div>\n<div class=\"f-text\">The AP 220 will be the first true high-speed train sets to be built in America and are designed for operational speeds of up to 220 miles per hour (354 kph). The propulsion system, lighter weight and aerodynamic shape makes it more efficient than other high-speed trains.<\/div>\n<div><\/div>\n<div class=\"f-text\">The AP220 features an ultrawide carbody designed for unparalleled passenger comfort and designed to be the most accessible train on the market, exceeding ADA requirements and allowing for guests in wheelchairs to move with ease from car to car. The seven-car trains will carry between 434-450 passengers, depending on final configuration and can make the trip in less than two hours.<\/div>\n<div><\/div>\n<div class=\"f-text\">On April 22, 2024, Brightline West celebrated its groundbreaking. The 218-mile system will be constructed in the median of the I-15 and is based on Brightline\u2019s vision to connect city pairs that are too short to fly and too far to drive. The system will have stops in Las Vegas, as well as Victor Valley, Hesperia and Rancho Cucamonga, California.<\/div>\n<div><\/div>\n<div class=\"f-text\">The $12 billion project was recently awarded $3 billion in funding from President Biden\u2019s Bipartisan Infrastructure Bill. The rest of the project will be privately funded.<\/div>\n<div><\/div>\n<div class=\"f-text\">Brightline partnered with Siemens Mobility to develop the Venture series train sets, which debuted in 2018 on the company\u2019s Florida system.<\/div>\n<\/div>\n<\/div>\n<\/div>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/brightline-west-selects-siemens-to-manufacture-high-speed-rail-trainsets\/\">Brightline West Selects Siemens to Manufacture High Speed Rail Trainsets<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/05\/Siemens-high-speed-train.jpg\" alt=\"\"><figcaption>Image\/Siemens Mobility<\/figcaption><\/figure>\n<p>Brightline has announced that Siemens Mobility has been designated the preferred bidder to build train sets for the Brightline West \u2026 <\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/brightline-west-selects-siemens-to-manufacture-high-speed-rail-trainsets\/\">Brightline West Selects Siemens to Manufacture High Speed Rail Trainsets<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[354,180,4696],"tags":[],"class_list":["post-42664","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-fast-rail","category-rolling-stock","category-suppliers-and-manufacturers"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/42664","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=42664"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/42664\/revisions"}],"predecessor-version":[{"id":42667,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/42664\/revisions\/42667"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=42664"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=42664"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=42664"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}