{"id":405712,"date":"2026-04-14T22:30:09","date_gmt":"2026-04-14T12:30:09","guid":{"rendered":"https:\/\/railuk.com\/?p=191950"},"modified":"2026-04-14T22:30:09","modified_gmt":"2026-04-14T12:30:09","slug":"hs2-starts-work-on-new-fosse-way-cycle-bridge","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=405712","title":{"rendered":"HS2 starts work on new Fosse Way cycle bridge"},"content":{"rendered":"<p><a href=\"https:\/\/railuk.com\/rail-projects\/hs2-starts-work-on-new-fosse-way-cycle-bridge\/\" title=\"HS2 starts work on new Fosse Way cycle bridge\" rel=\"nofollow\"><img loading=\"lazy\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/14132302\/Offchurch-Cycle-Bridge-HS2-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\" style=\"display: block; margin-bottom: 5px; clear:both;max-width: 100%;\" link_thumbnail=\"1\" decoding=\"async\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/14132302\/Offchurch-Cycle-Bridge-HS2-485x360.jpg 485w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/14132302\/Offchurch-Cycle-Bridge-HS2-80x60.jpg 80w\" sizes=\"auto, (max-width: 485px) 100vw, 485px\" \/><\/a><\/p>\n<p>HS2 engineers have begun installing a dedicated cycle bridge that will connect the Offchurch Greenway in Warwickshire to Route 41 of the national cycle network.<\/p>\n<p>The new bridge will complement HS2\u2019s earlier programme of work, completed in October 2025, which saw the dual opening of nearby Fosse Way bridge and Offchurch Greenway bridge, which carry a local road and cycle route across the high-speed railway.<\/p>\n<p>HS2\u2019s construction partner, Balfour Beatty VINCI (BBV), has led the installation of all three bridges, which together play a vital role in enhancing connectivity for local communities.<\/p>\n<p>Work on the new cycle bridge started in July 2025. Over the last eight months, the team has dug out and replaced the old embankment, constructed the supporting abutments and wingwalls, and conducted essential drainage and structural backfill works.<\/p>\n<p>To facilitate the next programme of work, the B4455 Fosse Way, near Offchurch, will be closed until Sunday 26 April 2026 to allow the new bridge to be safely lifted and lowered into position, ready to connect to the abutments.<\/p>\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/14132719\/260413_OffchurchCycleBridge_BBV_009-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/14132719\/260413_OffchurchCycleBridge_BBV_009-1024x576.jpg\" alt=\"\" class=\"wp-image-191957\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/14132719\/260413_OffchurchCycleBridge_BBV_009-1024x576.jpg 1024w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/14132719\/260413_OffchurchCycleBridge_BBV_009-300x169.jpg 300w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/14132719\/260413_OffchurchCycleBridge_BBV_009-768x432.jpg 768w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/14132719\/260413_OffchurchCycleBridge_BBV_009-1536x864.jpg 1536w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/14132719\/260413_OffchurchCycleBridge_BBV_009-2048x1152.jpg 2048w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/14132719\/260413_OffchurchCycleBridge_BBV_009-747x420.jpg 747w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/14132719\/260413_OffchurchCycleBridge_BBV_009-696x392.jpg 696w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/14132719\/260413_OffchurchCycleBridge_BBV_009-1068x601.jpg 1068w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/14132719\/260413_OffchurchCycleBridge_BBV_009-1920x1080.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n<p>Vicki Lee, HS2 Ltd\u2019s senior project manager said: \u201cAll three bridges will play an important role in improving safety and connectivity and I\u2019d like to thank our team of engineers who are working exceptionally hard to deliver this programme of work.<\/p>\n<p>\u201cWhen the new bridge opens, I\u2019m confident it will be welcomed by cyclists from near and far who visit Warwickshire to enjoy this stunning section of the Route 41 trail.\u201d<\/p>\n<p>The new bridge will keep cyclists and walkers away from passing traffic, making it an important local asset, as well as forming part of a national cycle route through the English countryside maintained by the charity Walk Wheel Cycle Trust.<\/p>\n<p>The bridge\u2019s steel fabricated deck is supported by two abutments, and the exterior panels are designed in accordance with historic railway colours \u2013 reflecting feedback from local stakeholders. The bridge was manufactured by Britons Steel Fabricators in Nottinghamshire and then painted and surfaced by Jack Tighe Coatings Ltd in South Yorkshire.<\/p>\n<p>Following the bridge\u2019s safe installation, Kathyrn, Charlotte and the wider BBV team will turn their attention to completing the abutment side walls, earthworks to tie the existing footpath and cycle routes into the structure, tarmac works, landscaping and fence installation.<\/p>\n<p>The new bridge is forecast to open in September 2026.<\/p>\n<p>Image credit: HS2<\/p>\n","protected":false},"excerpt":{"rendered":"<p><a href=\"https:\/\/railuk.com\/rail-projects\/hs2-starts-work-on-new-fosse-way-cycle-bridge\/\" title=\"HS2 starts work on new Fosse Way cycle bridge\" rel=\"nofollow\"><img loading=\"lazy\" decoding=\"async\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/14132302\/Offchurch-Cycle-Bridge-HS2-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\"><\/a>HS2 engineers have begun installing a dedicated cycle bridge that will connect the Offchurch Greenway in Warwickshire to Route 41 of the national cycle network. The new bridge will complement HS2\u2019s earlier programme of work, completed in October 2025, which saw the dual opening of nearby Fosse Way bridge and Offchurch Greenway bridge, which carry [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[16017,343,47,16148,16031,85],"tags":[],"class_list":["post-405712","post","type-post","status-publish","format-standard","hentry","category-industry-news","category-infrastructure","category-rail-news","category-rail-projects","category-structures","category-uk"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/405712","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=405712"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/405712\/revisions"}],"predecessor-version":[{"id":405723,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/405712\/revisions\/405723"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=405712"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=405712"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=405712"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}