{"id":401736,"date":"2026-04-08T21:27:00","date_gmt":"2026-04-08T11:27:00","guid":{"rendered":"https:\/\/railuk.com\/?p=191673"},"modified":"2026-04-08T21:27:00","modified_gmt":"2026-04-08T11:27:00","slug":"smoother-and-more-reliable-journeys-for-somerset-passengers-as-new-track-is-installed-in-easter-upgrade","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=401736","title":{"rendered":"Smoother and more reliable journeys for Somerset passengers as new track is installed in Easter upgrade"},"content":{"rendered":"<p><a href=\"https:\/\/railuk.com\/general-interest\/smoother-and-more-reliable-journeys-for-somerset-passengers-as-new-track-is-installed-in-easter-upgrade\/\" title=\"Smoother and more reliable journeys for Somerset passengers as new track is installed in Easter upgrade\" rel=\"nofollow\"><img loading=\"lazy\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/08120247\/East-Somerset-Junction-track-work-April-26-1_cropped-1-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\" style=\"display: block; margin-bottom: 5px; clear:both;max-width: 100%;\" link_thumbnail=\"1\" decoding=\"async\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/08120247\/East-Somerset-Junction-track-work-April-26-1_cropped-1-485x360.jpg 485w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/08120247\/East-Somerset-Junction-track-work-April-26-1_cropped-1-80x60.jpg 80w\" sizes=\"auto, (max-width: 485px) 100vw, 485px\" \/><\/a><\/p>\n<p>Rail services through Somerset are back up and running as usual after engineers spent the Easter bank holiday weekend replacing old track, sleepers and ballast at East Somerset Junction, between Westbury and Taunton.<\/p>\n<p>Network Rail engineers began work on Friday and worked through the Easter weekend, finishing a few hours ahead of schedule for services to resume on Monday morning.&nbsp;<\/p>\n<p>With much of the old track dating back to the 1960s, 1.4km of rail was replaced along with 1,080 sleepers and 3,300 tonnes of ballast (track stone), to deliver smoother and more reliable journeys for passengers.&nbsp;<\/p>\n<p>In the surrounding area, other teams took advantage of the closure of the railway to complete track and signal maintenance and inspections, along with vegetation management.&nbsp;<\/p>\n<p>As the work took place, buses replaced trains between Westbury and Frome or Castle Cary, Taunton and Castle Cary, and between Swindon and Pewsey.<\/p>\n<p>Planned follow up work takes place over the next two weekends, only affecting train services on the following dates:<\/p>\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/08120239\/New-sleepers-at-East-Somerset-Junction-April-26-1.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"576\" height=\"1024\" data-id=\"191678\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/08120239\/New-sleepers-at-East-Somerset-Junction-April-26-1-576x1024.jpg\" alt=\"\" class=\"wp-image-191678\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/08120239\/New-sleepers-at-East-Somerset-Junction-April-26-1-576x1024.jpg 576w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/08120239\/New-sleepers-at-East-Somerset-Junction-April-26-1-169x300.jpg 169w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/08120239\/New-sleepers-at-East-Somerset-Junction-April-26-1-768x1365.jpg 768w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/08120239\/New-sleepers-at-East-Somerset-Junction-April-26-1-864x1536.jpg 864w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/08120239\/New-sleepers-at-East-Somerset-Junction-April-26-1-236x420.jpg 236w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/08120239\/New-sleepers-at-East-Somerset-Junction-April-26-1-696x1237.jpg 696w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/08120239\/New-sleepers-at-East-Somerset-Junction-April-26-1-1068x1899.jpg 1068w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/08120239\/New-sleepers-at-East-Somerset-Junction-April-26-1.jpg 1152w\" sizes=\"auto, (max-width: 576px) 100vw, 576px\" \/><\/a><\/figure>\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/08120239\/Track-replacement-East-Somerset-Junction-April-26-1.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"191677\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/08120239\/Track-replacement-East-Somerset-Junction-April-26-1-768x1024.jpg\" alt=\"\" class=\"wp-image-191677\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/08120239\/Track-replacement-East-Somerset-Junction-April-26-1-768x1024.jpg 768w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/08120239\/Track-replacement-East-Somerset-Junction-April-26-1-225x300.jpg 225w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/08120239\/Track-replacement-East-Somerset-Junction-April-26-1-1152x1536.jpg 1152w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/08120239\/Track-replacement-East-Somerset-Junction-April-26-1-315x420.jpg 315w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/08120239\/Track-replacement-East-Somerset-Junction-April-26-1-696x928.jpg 696w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/08120239\/Track-replacement-East-Somerset-Junction-April-26-1-1068x1424.jpg 1068w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/08120239\/Track-replacement-East-Somerset-Junction-April-26-1.jpg 1200w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/a><\/figure>\n<\/figure>\n<ul class=\"wp-block-list\">\n<li><strong>Sunday 12 April (until 3pm)<\/strong><\/li>\n<\/ul>\n<p>GWR trains will operate between Weymouth and Castle Cary until 1000, then between Weymouth and Frome until 1500.<\/p>\n<p>Trains will operate between Bristol Temple Meads and Westbury with through services for Weymouth resuming after 1500.<\/p>\n<ul class=\"wp-block-list\">\n<li><strong>Sunday 19 April<\/strong><\/li>\n<\/ul>\n<p>GWR trains will operate between Weymouth and Frome, plus between Bristol Temple Meads and Westbury all day.<\/p>\n<p><strong>Network Rail lead portfolio manager Mark Parker said:<\/strong><\/p>\n<p>\u201cI&#8217;d like to thank passengers for their patience over the long weekend as we completed another essential upgrade over the Easter weekend, replacing track dating back to the 1960s with modern components that will help ensure continued safe and reliable train journeys for years to come.<\/p>\n<p>&#8220;If you&#8217;re travelling over the next two Sundays, please make sure to check before you travel as some journeys will be affected by our planned follow-up work.&#8221;&nbsp;<\/p>\n<p><strong>Passengers are advised to check before they travel at nationalrail.co.uk or GWR.com\/upgrade<\/strong><\/p>\n<p>Image credit: Network Rail<\/p>\n","protected":false},"excerpt":{"rendered":"<p><a href=\"https:\/\/railuk.com\/general-interest\/smoother-and-more-reliable-journeys-for-somerset-passengers-as-new-track-is-installed-in-easter-upgrade\/\" title=\"Smoother and more reliable journeys for Somerset passengers as new track is installed in Easter upgrade\" rel=\"nofollow\"><img loading=\"lazy\" decoding=\"async\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/08120247\/East-Somerset-Junction-track-work-April-26-1_cropped-1-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\"><\/a>Rail services through Somerset are back up and running as usual after engineers spent the Easter bank holiday weekend replacing old track, sleepers and ballast at East Somerset Junction, between Westbury and Taunton. Network Rail engineers began work on Friday and worked through the Easter weekend, finishing a few hours ahead of schedule for services [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[16013,16017,343,47,85],"tags":[],"class_list":["post-401736","post","type-post","status-publish","format-standard","hentry","category-general-interest","category-industry-news","category-infrastructure","category-rail-news","category-uk"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.10 - aioseo.com -->\n\t<meta name=\"description\" content=\"Rail services through Somerset are back up and running as usual after engineers spent the Easter bank holiday weekend replacing old track, sleepers and ballast at East Somerset Junction, between Westbury and Taunton. Network Rail engineers began work on Friday and worked through the Easter weekend, finishing a few hours ahead of schedule for services [\u2026]\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=401736\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.10\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Smoother and more reliable journeys for Somerset passengers as new track is installed in Easter upgrade - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Rail services through Somerset are back up and running as usual after engineers spent the Easter bank holiday weekend replacing old track, sleepers and ballast at East Somerset Junction, between Westbury and Taunton. Network Rail engineers began work on Friday and worked through the Easter weekend, finishing a few hours ahead of schedule for services [\u2026]\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=401736\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-04-08T11:27:00+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-04-08T11:27:00+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Smoother and more reliable journeys for Somerset passengers as new track is installed in Easter upgrade - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Rail services through Somerset are back up and running as usual after engineers spent the Easter bank holiday weekend replacing old track, sleepers and ballast at East Somerset Junction, between Westbury and Taunton. Network Rail engineers began work on Friday and worked through the Easter weekend, finishing a few hours ahead of schedule for services [\u2026]\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=401736#blogposting\",\"name\":\"Smoother and more reliable journeys for Somerset passengers as new track is installed in Easter upgrade - VibeWire Magazine\",\"headline\":\"Smoother and more reliable journeys for Somerset passengers as new track is installed in Easter upgrade\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/cdn.railuk.co\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/08120247\\\/East-Somerset-Junction-track-work-April-26-1_cropped-1-485x360.jpg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=401736\\\/#articleImage\"},\"datePublished\":\"2026-04-08T21:27:00+10:00\",\"dateModified\":\"2026-04-08T21:27:00+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=401736#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=401736#webpage\"},\"articleSection\":\"General Interest, Industry News, Infrastructure, Rail News, UK\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=401736#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=401736#listItem\",\"name\":\"Smoother and more reliable journeys for Somerset passengers as new track is installed in Easter upgrade\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=401736#listItem\",\"position\":3,\"name\":\"Smoother and more reliable journeys for Somerset passengers as new track is installed in Easter upgrade\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=401736\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=401736\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=401736#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=401736#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=401736\",\"name\":\"Smoother and more reliable journeys for Somerset passengers as new track is installed in Easter upgrade - VibeWire Magazine\",\"description\":\"Rail services through Somerset are back up and running as usual after engineers spent the Easter bank holiday weekend replacing old track, sleepers and ballast at East Somerset Junction, between Westbury and Taunton. Network Rail engineers began work on Friday and worked through the Easter weekend, finishing a few hours ahead of schedule for services [\\u2026]\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=401736#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"datePublished\":\"2026-04-08T21:27:00+10:00\",\"dateModified\":\"2026-04-08T21:27:00+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Smoother and more reliable journeys for Somerset passengers as new track is installed in Easter upgrade - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Smoother and more reliable journeys for Somerset passengers as new track is installed in Easter upgrade - VibeWire Magazine","description":"Rail services through Somerset are back up and running as usual after engineers spent the Easter bank holiday weekend replacing old track, sleepers and ballast at East Somerset Junction, between Westbury and Taunton. Network Rail engineers began work on Friday and worked through the Easter weekend, finishing a few hours ahead of schedule for services [\u2026]","canonical_url":"https:\/\/www.vibewire.com.au\/?p=401736","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=401736#blogposting","name":"Smoother and more reliable journeys for Somerset passengers as new track is installed in Easter upgrade - VibeWire Magazine","headline":"Smoother and more reliable journeys for Somerset passengers as new track is installed in Easter upgrade","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/08120247\/East-Somerset-Junction-track-work-April-26-1_cropped-1-485x360.jpg","@id":"https:\/\/www.vibewire.com.au\/?p=401736\/#articleImage"},"datePublished":"2026-04-08T21:27:00+10:00","dateModified":"2026-04-08T21:27:00+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=401736#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=401736#webpage"},"articleSection":"General Interest, Industry News, Infrastructure, Rail News, UK"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=401736#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=401736#listItem","name":"Smoother and more reliable journeys for Somerset passengers as new track is installed in Easter upgrade"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=401736#listItem","position":3,"name":"Smoother and more reliable journeys for Somerset passengers as new track is installed in Easter upgrade","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=401736\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=401736\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=401736#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=401736#webpage","url":"https:\/\/www.vibewire.com.au\/?p=401736","name":"Smoother and more reliable journeys for Somerset passengers as new track is installed in Easter upgrade - VibeWire Magazine","description":"Rail services through Somerset are back up and running as usual after engineers spent the Easter bank holiday weekend replacing old track, sleepers and ballast at East Somerset Junction, between Westbury and Taunton. Network Rail engineers began work on Friday and worked through the Easter weekend, finishing a few hours ahead of schedule for services [\u2026]","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=401736#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"datePublished":"2026-04-08T21:27:00+10:00","dateModified":"2026-04-08T21:27:00+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Smoother and more reliable journeys for Somerset passengers as new track is installed in Easter upgrade - VibeWire Magazine","og:description":"Rail services through Somerset are back up and running as usual after engineers spent the Easter bank holiday weekend replacing old track, sleepers and ballast at East Somerset Junction, between Westbury and Taunton. Network Rail engineers began work on Friday and worked through the Easter weekend, finishing a few hours ahead of schedule for services [\u2026]","og:url":"https:\/\/www.vibewire.com.au\/?p=401736","article:published_time":"2026-04-08T11:27:00+00:00","article:modified_time":"2026-04-08T11:27:00+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Smoother and more reliable journeys for Somerset passengers as new track is installed in Easter upgrade - VibeWire Magazine","twitter:description":"Rail services through Somerset are back up and running as usual after engineers spent the Easter bank holiday weekend replacing old track, sleepers and ballast at East Somerset Junction, between Westbury and Taunton. Network Rail engineers began work on Friday and worked through the Easter weekend, finishing a few hours ahead of schedule for services [\u2026]","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"401736","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-04-08 12:32:01","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2026-04-08 12:31:39","updated":"2026-04-08 12:32:01"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tSmoother and more reliable journeys for Somerset passengers as new track is installed in Easter upgrade\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"Smoother and more reliable journeys for Somerset passengers as new track is installed in Easter upgrade","link":"https:\/\/www.vibewire.com.au\/?p=401736"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/401736","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=401736"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/401736\/revisions"}],"predecessor-version":[{"id":401737,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/401736\/revisions\/401737"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=401736"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=401736"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=401736"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}