{"id":401708,"date":"2026-04-08T20:52:09","date_gmt":"2026-04-08T10:52:09","guid":{"rendered":"https:\/\/railuk.com\/?p=191654"},"modified":"2026-04-08T20:52:09","modified_gmt":"2026-04-08T10:52:09","slug":"network-rail-and-south-western-railway-complete-vital-track-improvements-between-london-waterloo-and-clapham-junction","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=401708","title":{"rendered":"Network Rail and South Western Railway complete vital track improvements between London Waterloo and Clapham Junction"},"content":{"rendered":"<p><a href=\"https:\/\/railuk.com\/general-interest\/network-rail-and-south-western-railway-complete-vital-track-improvements-between-london-waterloo-and-clapham-junction\/\" title=\"Network Rail and South Western Railway complete vital track improvements between London Waterloo and Clapham Junction\" rel=\"nofollow\"><img loading=\"lazy\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/08114419\/Removing-switches-and-crossings-at-London-Waterloo-1-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\" style=\"display: block; margin-bottom: 5px; clear:both;max-width: 100%;\" link_thumbnail=\"1\" decoding=\"async\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/08114419\/Removing-switches-and-crossings-at-London-Waterloo-1-485x360.jpg 485w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/08114419\/Removing-switches-and-crossings-at-London-Waterloo-1-80x60.jpg 80w\" sizes=\"auto, (max-width: 485px) 100vw, 485px\" \/><\/a><\/p>\n<p>New switches and crossings, essential components which allow trains to change tracks, went into service for the first time at London Waterloo this morning (Tuesday 7 April).<\/p>\n<p>Over the Easter weekend, Network Rail and South Western Railway worked together to complete this vital renewal, while also working on other projects, to make as much progress as possible during the line closure.<\/p>\n<p>Engineers replaced four switches and crossings near the entrance to the platforms 18 to 24 at London Waterloo. These platforms serve trains heading for Windsor &amp; Eton Riverside, Reading and Weybridge (via Staines).<\/p>\n<p>Hundreds of trains travel over these vital parts of the track every day, and combined with strengthening and renovation work on the railway bridge spanning Lambeth Road, the railway into London Waterloo is now more resilient, meaning fewer delays and less disruption for passengers.<\/p>\n<figure class=\"wp-block-embed is-type-wp-embed is-provider-wistia-inc wp-block-embed-wistia-inc\">\n<div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" class=\"wp-embedded-content\" sandbox=\"allow-scripts\" security=\"restricted\" title=\"Lambeth Road Bridge interview Video\" src=\"https:\/\/fast.wistia.net\/embed\/iframe\/3iqoj1a17r?dnt=1#?secret=ER4pwzZq7D\" data-secret=\"ER4pwzZq7D\" frameborder=\"0\" scrolling=\"no\" width=\"696\" height=\"392\"><\/iframe>\n<\/div>\n<\/figure>\n<p>Engineers at Clapham Junction, Britain\u2019s busiest interchange station, used the line closure to put up a scaffold crash deck beneath the footbridge between platforms 3 and 6. This will support work to upgrade the walkway, which is used by thousands of passengers every day.<\/p>\n<p><strong>Speaking on behalf of South Western Railway and Network Rail Wessex, George Murrell, Route Renewals Director,<\/strong>&nbsp;said: \u201cWe appreciate passengers\u2019 patience during the upgrades at London Waterloo. These improvements will make this vital section of the railway more resilient and help ensure reliable journeys into London.\u201d<\/p>\n<p>Image credit: Network Rail<\/p>\n","protected":false},"excerpt":{"rendered":"<p><a href=\"https:\/\/railuk.com\/general-interest\/network-rail-and-south-western-railway-complete-vital-track-improvements-between-london-waterloo-and-clapham-junction\/\" title=\"Network Rail and South Western Railway complete vital track improvements between London Waterloo and Clapham Junction\" rel=\"nofollow\"><img loading=\"lazy\" decoding=\"async\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/08114419\/Removing-switches-and-crossings-at-London-Waterloo-1-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\"><\/a>New switches and crossings, essential components which allow trains to change tracks, went into service for the first time at London Waterloo this morning (Tuesday 7 April). Over the Easter weekend, Network Rail and South Western Railway worked together to complete this vital renewal, while also working on other projects, to make as much progress [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[16013,343,47,913,85],"tags":[],"class_list":["post-401708","post","type-post","status-publish","format-standard","hentry","category-general-interest","category-infrastructure","category-rail-news","category-travel","category-uk"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.10 - aioseo.com -->\n\t<meta name=\"description\" content=\"New switches and crossings, essential components which allow trains to change tracks, went into service for the first time at London Waterloo this morning (Tuesday 7 April). Over the Easter weekend, Network Rail and South Western Railway worked together to complete this vital renewal, while also working on other projects, to make as much progress [\u2026]\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=401708\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.10\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Network Rail and South Western Railway complete vital track improvements between London Waterloo and Clapham Junction - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"New switches and crossings, essential components which allow trains to change tracks, went into service for the first time at London Waterloo this morning (Tuesday 7 April). Over the Easter weekend, Network Rail and South Western Railway worked together to complete this vital renewal, while also working on other projects, to make as much progress [\u2026]\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=401708\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-04-08T10:52:09+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-04-08T10:52:09+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Network Rail and South Western Railway complete vital track improvements between London Waterloo and Clapham Junction - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"New switches and crossings, essential components which allow trains to change tracks, went into service for the first time at London Waterloo this morning (Tuesday 7 April). Over the Easter weekend, Network Rail and South Western Railway worked together to complete this vital renewal, while also working on other projects, to make as much progress [\u2026]\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=401708#blogposting\",\"name\":\"Network Rail and South Western Railway complete vital track improvements between London Waterloo and Clapham Junction - VibeWire Magazine\",\"headline\":\"Network Rail and South Western Railway complete vital track improvements between London Waterloo and Clapham Junction\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/cdn.railuk.co\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/08114419\\\/Removing-switches-and-crossings-at-London-Waterloo-1-485x360.jpg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=401708\\\/#articleImage\"},\"datePublished\":\"2026-04-08T20:52:09+10:00\",\"dateModified\":\"2026-04-08T20:52:09+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=401708#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=401708#webpage\"},\"articleSection\":\"General Interest, Infrastructure, Rail News, Travel, UK\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=401708#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=401708#listItem\",\"name\":\"Network Rail and South Western Railway complete vital track improvements between London Waterloo and Clapham Junction\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=401708#listItem\",\"position\":3,\"name\":\"Network Rail and South Western Railway complete vital track improvements between London Waterloo and Clapham Junction\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=401708\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=401708\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=401708#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=401708#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=401708\",\"name\":\"Network Rail and South Western Railway complete vital track improvements between London Waterloo and Clapham Junction - VibeWire Magazine\",\"description\":\"New switches and crossings, essential components which allow trains to change tracks, went into service for the first time at London Waterloo this morning (Tuesday 7 April). Over the Easter weekend, Network Rail and South Western Railway worked together to complete this vital renewal, while also working on other projects, to make as much progress [\\u2026]\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=401708#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"datePublished\":\"2026-04-08T20:52:09+10:00\",\"dateModified\":\"2026-04-08T20:52:09+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Network Rail and South Western Railway complete vital track improvements between London Waterloo and Clapham Junction - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Network Rail and South Western Railway complete vital track improvements between London Waterloo and Clapham Junction - VibeWire Magazine","description":"New switches and crossings, essential components which allow trains to change tracks, went into service for the first time at London Waterloo this morning (Tuesday 7 April). Over the Easter weekend, Network Rail and South Western Railway worked together to complete this vital renewal, while also working on other projects, to make as much progress [\u2026]","canonical_url":"https:\/\/www.vibewire.com.au\/?p=401708","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=401708#blogposting","name":"Network Rail and South Western Railway complete vital track improvements between London Waterloo and Clapham Junction - VibeWire Magazine","headline":"Network Rail and South Western Railway complete vital track improvements between London Waterloo and Clapham Junction","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/04\/08114419\/Removing-switches-and-crossings-at-London-Waterloo-1-485x360.jpg","@id":"https:\/\/www.vibewire.com.au\/?p=401708\/#articleImage"},"datePublished":"2026-04-08T20:52:09+10:00","dateModified":"2026-04-08T20:52:09+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=401708#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=401708#webpage"},"articleSection":"General Interest, Infrastructure, Rail News, Travel, UK"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=401708#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=401708#listItem","name":"Network Rail and South Western Railway complete vital track improvements between London Waterloo and Clapham Junction"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=401708#listItem","position":3,"name":"Network Rail and South Western Railway complete vital track improvements between London Waterloo and Clapham Junction","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=401708\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=401708\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=401708#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=401708#webpage","url":"https:\/\/www.vibewire.com.au\/?p=401708","name":"Network Rail and South Western Railway complete vital track improvements between London Waterloo and Clapham Junction - VibeWire Magazine","description":"New switches and crossings, essential components which allow trains to change tracks, went into service for the first time at London Waterloo this morning (Tuesday 7 April). Over the Easter weekend, Network Rail and South Western Railway worked together to complete this vital renewal, while also working on other projects, to make as much progress [\u2026]","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=401708#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"datePublished":"2026-04-08T20:52:09+10:00","dateModified":"2026-04-08T20:52:09+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Network Rail and South Western Railway complete vital track improvements between London Waterloo and Clapham Junction - VibeWire Magazine","og:description":"New switches and crossings, essential components which allow trains to change tracks, went into service for the first time at London Waterloo this morning (Tuesday 7 April). Over the Easter weekend, Network Rail and South Western Railway worked together to complete this vital renewal, while also working on other projects, to make as much progress [\u2026]","og:url":"https:\/\/www.vibewire.com.au\/?p=401708","article:published_time":"2026-04-08T10:52:09+00:00","article:modified_time":"2026-04-08T10:52:09+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Network Rail and South Western Railway complete vital track improvements between London Waterloo and Clapham Junction - VibeWire Magazine","twitter:description":"New switches and crossings, essential components which allow trains to change tracks, went into service for the first time at London Waterloo this morning (Tuesday 7 April). Over the Easter weekend, Network Rail and South Western Railway worked together to complete this vital renewal, while also working on other projects, to make as much progress [\u2026]","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"401708","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-04-08 11:06:54","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2026-04-08 11:00:21","updated":"2026-04-08 11:06:54"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tNetwork Rail and South Western Railway complete vital track improvements between London Waterloo and Clapham Junction\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"Network Rail and South Western Railway complete vital track improvements between London Waterloo and Clapham Junction","link":"https:\/\/www.vibewire.com.au\/?p=401708"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/401708","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=401708"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/401708\/revisions"}],"predecessor-version":[{"id":401742,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/401708\/revisions\/401742"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=401708"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=401708"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=401708"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}