{"id":397183,"date":"2026-03-31T19:01:40","date_gmt":"2026-03-31T09:01:40","guid":{"rendered":"https:\/\/railuk.com\/?p=191305"},"modified":"2026-03-31T19:01:40","modified_gmt":"2026-03-31T09:01:40","slug":"train-services-resume-between-exeter-and-barnstaple-following-eight-days-of-track-renewal-work","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=397183","title":{"rendered":"Train services resume between Exeter and Barnstaple following eight days of track renewal work"},"content":{"rendered":"<p><a href=\"https:\/\/railuk.com\/general-interest\/train-services-resume-between-exeter-and-barnstaple-following-eight-days-of-track-renewal-work\/\" title=\"Train services resume between Exeter and Barnstaple following eight days of track renewal work\" rel=\"nofollow\"><img loading=\"lazy\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/31100017\/Ian-Roome-MP-and-Councillor-Jacqi-Hodgson-visit-the-North-Devon-engineering-work-1-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\" style=\"display: block; margin-bottom: 5px; clear:both;max-width: 100%;\" link_thumbnail=\"1\" decoding=\"async\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/31100017\/Ian-Roome-MP-and-Councillor-Jacqi-Hodgson-visit-the-North-Devon-engineering-work-1-485x360.jpg 485w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/31100017\/Ian-Roome-MP-and-Councillor-Jacqi-Hodgson-visit-the-North-Devon-engineering-work-1-80x60.jpg 80w\" sizes=\"auto, (max-width: 485px) 100vw, 485px\" \/><\/a><\/p>\n<p><strong>Trains have resumed on the North Devon line following Network Rail\u2019s eight-day track renewal in the Crediton area.<\/strong><\/p>\n<p>On Saturday 21 March, engineers began replacing rail, sleepers and ballast (the stone that supports the track) between Barnstaple and Taw, before moving to the Chenson area last Wednesday to install a second stretch of track.<\/p>\n<p>During the closure of the railway line, more than 80 engineers from Network Rail and Colas Rail worked around the clock to renew 2.7km of track, install 3,000 tonnes of ballast, and lay more than 4,200 sleepers as part of essential upgrades to support smoother, more reliable journeys for passengers.<\/p>\n<p>The closure also enabled Network Rail to complete a programme of important maintenance, including inspections of drainage systems, bridges and other key assets, as well as vegetation clearance and track adjustments to reduce future disruption.<\/p>\n<p>Last week, North Devon MP Ian Roome and Councillor Jacqi Hodgson visited the engineering teams to see first\u2011hand how the upgrades will benefit local communities and improve the resilience of the North Devon line.<\/p>\n<p>These upgrades form part of a wider package of improvements designed to ensure the continued safe running of the railway and support future increases in train speeds, helping to reduce journey times for passengers.&nbsp;<\/p>\n<p><strong>Network Rail lead portfolio manager Mark Parker said:<\/strong>&nbsp;\u201cI\u2019d like to thank passengers and the local community for their patience while we completed these vital improvements.<\/p>\n<p>\u201cThese upgrades are essential to maintaining a safe and reliable railway for passengers in North Devon and will help to enable quicker journey times in the future.<\/p>\n<p>\u201cWe thank partners at Colas Rail for assisting in the delivery of this work, as well as GWR for their efforts in keeping people moving while the line was closed.\u201d<\/p>\n<p>Image credit: Network Rail<\/p>\n","protected":false},"excerpt":{"rendered":"<p><a href=\"https:\/\/railuk.com\/general-interest\/train-services-resume-between-exeter-and-barnstaple-following-eight-days-of-track-renewal-work\/\" title=\"Train services resume between Exeter and Barnstaple following eight days of track renewal work\" rel=\"nofollow\"><img loading=\"lazy\" decoding=\"async\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/31100017\/Ian-Roome-MP-and-Councillor-Jacqi-Hodgson-visit-the-North-Devon-engineering-work-1-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\"><\/a>Trains have resumed on the North Devon line following Network Rail\u2019s eight-day track renewal in the Crediton area. On Saturday 21 March, engineers began replacing rail, sleepers and ballast (the stone that supports the track) between Barnstaple and Taw, before moving to the Chenson area last Wednesday to install a second stretch of track. During [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[16013,343,47,85],"tags":[],"class_list":["post-397183","post","type-post","status-publish","format-standard","hentry","category-general-interest","category-infrastructure","category-rail-news","category-uk"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.9 - aioseo.com -->\n\t<meta name=\"description\" content=\"Trains have resumed on the North Devon line following Network Rail\u2019s eight-day track renewal in the Crediton area. On Saturday 21 March, engineers began replacing rail, sleepers and ballast (the stone that supports the track) between Barnstaple and Taw, before moving to the Chenson area last Wednesday to install a second stretch of track. During [\u2026]\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=397183\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.9\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Train services resume between Exeter and Barnstaple following eight days of track renewal work - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Trains have resumed on the North Devon line following Network Rail\u2019s eight-day track renewal in the Crediton area. On Saturday 21 March, engineers began replacing rail, sleepers and ballast (the stone that supports the track) between Barnstaple and Taw, before moving to the Chenson area last Wednesday to install a second stretch of track. During [\u2026]\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=397183\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-03-31T09:01:40+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-03-31T09:01:40+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Train services resume between Exeter and Barnstaple following eight days of track renewal work - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Trains have resumed on the North Devon line following Network Rail\u2019s eight-day track renewal in the Crediton area. On Saturday 21 March, engineers began replacing rail, sleepers and ballast (the stone that supports the track) between Barnstaple and Taw, before moving to the Chenson area last Wednesday to install a second stretch of track. During [\u2026]\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=397183#blogposting\",\"name\":\"Train services resume between Exeter and Barnstaple following eight days of track renewal work - VibeWire Magazine\",\"headline\":\"Train services resume between Exeter and Barnstaple following eight days of track renewal work\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/cdn.railuk.co\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/31100017\\\/Ian-Roome-MP-and-Councillor-Jacqi-Hodgson-visit-the-North-Devon-engineering-work-1-485x360.jpg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=397183\\\/#articleImage\"},\"datePublished\":\"2026-03-31T19:01:40+10:00\",\"dateModified\":\"2026-03-31T19:01:40+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=397183#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=397183#webpage\"},\"articleSection\":\"General Interest, Infrastructure, Rail News, UK\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=397183#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=397183#listItem\",\"name\":\"Train services resume between Exeter and Barnstaple following eight days of track renewal work\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=397183#listItem\",\"position\":3,\"name\":\"Train services resume between Exeter and Barnstaple following eight days of track renewal work\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=397183\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=397183\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=397183#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=397183#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=397183\",\"name\":\"Train services resume between Exeter and Barnstaple following eight days of track renewal work - VibeWire Magazine\",\"description\":\"Trains have resumed on the North Devon line following Network Rail\\u2019s eight-day track renewal in the Crediton area. On Saturday 21 March, engineers began replacing rail, sleepers and ballast (the stone that supports the track) between Barnstaple and Taw, before moving to the Chenson area last Wednesday to install a second stretch of track. During [\\u2026]\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=397183#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"datePublished\":\"2026-03-31T19:01:40+10:00\",\"dateModified\":\"2026-03-31T19:01:40+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Train services resume between Exeter and Barnstaple following eight days of track renewal work - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Train services resume between Exeter and Barnstaple following eight days of track renewal work - VibeWire Magazine","description":"Trains have resumed on the North Devon line following Network Rail\u2019s eight-day track renewal in the Crediton area. On Saturday 21 March, engineers began replacing rail, sleepers and ballast (the stone that supports the track) between Barnstaple and Taw, before moving to the Chenson area last Wednesday to install a second stretch of track. During [\u2026]","canonical_url":"https:\/\/www.vibewire.com.au\/?p=397183","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=397183#blogposting","name":"Train services resume between Exeter and Barnstaple following eight days of track renewal work - VibeWire Magazine","headline":"Train services resume between Exeter and Barnstaple following eight days of track renewal work","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/31100017\/Ian-Roome-MP-and-Councillor-Jacqi-Hodgson-visit-the-North-Devon-engineering-work-1-485x360.jpg","@id":"https:\/\/www.vibewire.com.au\/?p=397183\/#articleImage"},"datePublished":"2026-03-31T19:01:40+10:00","dateModified":"2026-03-31T19:01:40+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=397183#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=397183#webpage"},"articleSection":"General Interest, Infrastructure, Rail News, UK"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=397183#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=397183#listItem","name":"Train services resume between Exeter and Barnstaple following eight days of track renewal work"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=397183#listItem","position":3,"name":"Train services resume between Exeter and Barnstaple following eight days of track renewal work","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=397183\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=397183\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=397183#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=397183#webpage","url":"https:\/\/www.vibewire.com.au\/?p=397183","name":"Train services resume between Exeter and Barnstaple following eight days of track renewal work - VibeWire Magazine","description":"Trains have resumed on the North Devon line following Network Rail\u2019s eight-day track renewal in the Crediton area. On Saturday 21 March, engineers began replacing rail, sleepers and ballast (the stone that supports the track) between Barnstaple and Taw, before moving to the Chenson area last Wednesday to install a second stretch of track. During [\u2026]","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=397183#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"datePublished":"2026-03-31T19:01:40+10:00","dateModified":"2026-03-31T19:01:40+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Train services resume between Exeter and Barnstaple following eight days of track renewal work - VibeWire Magazine","og:description":"Trains have resumed on the North Devon line following Network Rail\u2019s eight-day track renewal in the Crediton area. On Saturday 21 March, engineers began replacing rail, sleepers and ballast (the stone that supports the track) between Barnstaple and Taw, before moving to the Chenson area last Wednesday to install a second stretch of track. During [\u2026]","og:url":"https:\/\/www.vibewire.com.au\/?p=397183","article:published_time":"2026-03-31T09:01:40+00:00","article:modified_time":"2026-03-31T09:01:40+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Train services resume between Exeter and Barnstaple following eight days of track renewal work - VibeWire Magazine","twitter:description":"Trains have resumed on the North Devon line following Network Rail\u2019s eight-day track renewal in the Crediton area. On Saturday 21 March, engineers began replacing rail, sleepers and ballast (the stone that supports the track) between Barnstaple and Taw, before moving to the Chenson area last Wednesday to install a second stretch of track. During [\u2026]","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"397183","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-03-31 10:16:52","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2026-03-31 10:14:01","updated":"2026-03-31 10:16:52"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tTrain services resume between Exeter and Barnstaple following eight days of track renewal work\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"Train services resume between Exeter and Barnstaple following eight days of track renewal work","link":"https:\/\/www.vibewire.com.au\/?p=397183"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/397183","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=397183"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/397183\/revisions"}],"predecessor-version":[{"id":397184,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/397183\/revisions\/397184"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=397183"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=397183"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=397183"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}