{"id":396611,"date":"2026-03-30T18:00:00","date_gmt":"2026-03-30T08:00:00","guid":{"rendered":"https:\/\/railuk.com\/?p=191263"},"modified":"2026-03-30T18:00:00","modified_gmt":"2026-03-30T08:00:00","slug":"scarboroughs-clocktower-shines-after-major-restoration","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=396611","title":{"rendered":"Scarborough\u2019s clocktower shines after major restoration"},"content":{"rendered":"<p><a href=\"https:\/\/railuk.com\/railway-stations\/scarboroughs-clocktower-shines-after-major-restoration\/\" title=\"Scarborough\u2019s clocktower shines after major restoration\" rel=\"nofollow\"><img loading=\"lazy\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/30102039\/Scarborough-clock-tower-Network-Rail-485x360.jpeg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\" style=\"display: block; margin-bottom: 5px; clear:both;max-width: 100%;\" link_thumbnail=\"1\" decoding=\"async\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/30102039\/Scarborough-clock-tower-Network-Rail-485x360.jpeg 485w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/30102039\/Scarborough-clock-tower-Network-Rail-80x60.jpeg 80w\" sizes=\"auto, (max-width: 485px) 100vw, 485px\" \/><\/a><\/p>\n<p>A painstaking restoration of the clocktower has been completed as part of the Scarborough station upgrade.<\/p>\n<p>The \u00a314 million project \u2013 preserving the grade II-listed building&#8217;s historical character \u2013 includes a new roof, drainage systems and restored stonework.<\/p>\n<p>The waiting room and ticket office are also being revamped to improve passenger experience at the station, which has remained open throughout the year-long project.<\/p>\n<p>A Railway Heritage Trust grant of \u00a3203,000 has enabled the clocktower to be restored at the same time, taking advantage of the scaffolding and site compound already being in place.<\/p>\n<p>Each part of the four faces has been individually restored to its best \u2013 forming the crowning glory of the wider project.<\/p>\n<div class=\"wp-block-image\">\n<figure class=\"alignright size-large is-resized\"><a href=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/30102118\/WhatsApp-Image-2026-03-27-at-16.26.42_cropped.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/30102118\/WhatsApp-Image-2026-03-27-at-16.26.42_cropped-1024x576.jpg\" alt=\"\" class=\"wp-image-191265\" style=\"aspect-ratio:1.777805231019025;width:467px;height:auto\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/30102118\/WhatsApp-Image-2026-03-27-at-16.26.42_cropped-1024x576.jpg 1024w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/30102118\/WhatsApp-Image-2026-03-27-at-16.26.42_cropped-300x169.jpg 300w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/30102118\/WhatsApp-Image-2026-03-27-at-16.26.42_cropped-768x432.jpg 768w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/30102118\/WhatsApp-Image-2026-03-27-at-16.26.42_cropped-747x420.jpg 747w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/30102118\/WhatsApp-Image-2026-03-27-at-16.26.42_cropped-696x391.jpg 696w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/30102118\/WhatsApp-Image-2026-03-27-at-16.26.42_cropped-1068x601.jpg 1068w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/30102118\/WhatsApp-Image-2026-03-27-at-16.26.42_cropped.jpg 1346w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n<\/div>\n<p>The project to deliver the grade II-listed station\u2019s new roof, drainage systems and restored stonework will be completed as planned by the end of March.<\/p>\n<p>However, workers will remain on site after this date due to the controlled removal of asbestos which has been found in the social club, ticket office and caf\u00e9 areas of the station. This work is expected to take until the end of June, after which the site compound will be cleared.<\/p>\n<p>The station\u2019s social club and ticket office will operate as normal with no risk to the public. The caf\u00e9 will temporarily close from 30 March for up to three weeks.<\/p>\n<p>Ann Shannon, Network Rail scheme project manager, said: \u201cOur project at Scarborough station is in its final stages, and thanks to the Railway Heritage Trust grant for the clocktower restoration, we\u2019ve been able to deliver more benefits than originally planned.<\/p>\n<p>\u201cThe main project is on track for completion as planned this month, but some of our colleagues will be working at the station for slightly longer because of the asbestos we\u2019ve recently identified. We\u2019re grateful for everyone\u2019s patience and understanding while we address this safely and responsibly.\u201d<\/p>\n<p>Roof repairs were started after a glazing failure in 2021. The station was made safe and, after funding constraints were overcome, the full restoration began in spring 2025.<\/p>\n<p>Scarborough\u2019s coastal location has meant other considerations \u2013 hawks were employed to prevent seagulls nesting during the main roof work last summer, and specific types of tile, paint and timber are used because of the salt-heavy sea air.<\/p>\n<p>Image credit: Network Rail<\/p>\n","protected":false},"excerpt":{"rendered":"<p><a href=\"https:\/\/railuk.com\/railway-stations\/scarboroughs-clocktower-shines-after-major-restoration\/\" title=\"Scarborough\u2019s clocktower shines after major restoration\" rel=\"nofollow\"><img loading=\"lazy\" decoding=\"async\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/30102039\/Scarborough-clock-tower-Network-Rail-485x360.jpeg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\"><\/a>A painstaking restoration of the clocktower has been completed as part of the Scarborough station upgrade. The \u00a314 million project \u2013 preserving the grade II-listed building\u2019s historical character \u2013 includes a new roof, drainage systems and restored stonework. The waiting room and ticket office are also being revamped to improve passenger experience at the station, [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[4920,47,16092,85],"tags":[],"class_list":["post-396611","post","type-post","status-publish","format-standard","hentry","category-heritage","category-rail-news","category-stations","category-uk"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/396611","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=396611"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/396611\/revisions"}],"predecessor-version":[{"id":396613,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/396611\/revisions\/396613"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=396611"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=396611"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=396611"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}