{"id":39408,"date":"2024-05-10T00:53:24","date_gmt":"2024-05-09T14:53:24","guid":{"rendered":"https:\/\/www.rtands.com\/?p=54801"},"modified":"2024-05-10T00:53:24","modified_gmt":"2024-05-09T14:53:24","slug":"audit-report-portal-north-bridge-project-progressing-but-opportunities-to-improve-exist","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=39408","title":{"rendered":"Audit Report: Portal North Bridge Project Progressing, but \u2018Opportunities to Improve\u2019 Exist"},"content":{"rendered":"<p>WASHINGTON, D.C. \u2013 From the Officer of Inspector General, National Railroad Passenger Corporation, it has found the Portal North Bridge project is on budget and on schedule.<\/p>\n<p>The post <a rel=\"nofollow\" href=\"https:\/\/www.rtands.com\/regulatory\/audit-report-portal-north-bridge-project-progressing-but-opportunities-to-improve-exist\/\">Audit Report: Portal North Bridge Project Progressing, but \u2018Opportunities to Improve\u2019 Exist<\/a> appeared first on <a rel=\"nofollow\" href=\"https:\/\/www.rtands.com\/\">Railway Track and Structures<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>WASHINGTON, D.C. \u2013 From the Officer of Inspector General, National Railroad Passenger Corporation, it has found the Portal North Bridge project is on budget and on schedule.<br \/>\nThe post Audit Report: Portal North Bridge Project Progressing, but \u2018Opportuni&#8230;<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[1304,9003,35,30,57,32,3700,49,51,9004,42,58],"tags":[],"class_list":["post-39408","post","type-post","status-publish","format-standard","hentry","category-amtrak","category-amtrakoig","category-breaking-news","category-bridges-tunnels","category-commuter-regional","category-news-and-opinion","category-nj-transit","category-passenger","category-passenger-rail","category-portal-north-bridge-project","category-regulatory","category-track-construction"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/39408","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=39408"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/39408\/revisions"}],"predecessor-version":[{"id":39409,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/39408\/revisions\/39409"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=39408"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=39408"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=39408"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}